Farmers Electric Cooperative

East Teresa Dr. / Jackson 248, Newport, AR 72112

Plant Summary Information

Farmers Electric Cooperative is ranked #41 out of 65 solar farms in Arkansas in terms of total annual net electricity generation.

Farmers Electric Cooperative generated 408.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameFarmers Electric Cooperative
Utility NameToday's Power, Inc.
LocationJackson County, AR
Initial Operation DateJune 2019
Last Update Dec 2024
Annual Generation 2.2 GWh
Annual Consumption 7.9 k MMBtu
Ranked #10,166 out of 12,530 Power Plants Nationwide
Ranked #4,966 out of 6,379 Solar Power Plants Nationwide
Ranked #85 out of 111 Arkansas Power Plants
Ranked #41 out of 65 Arkansas Solar Power Plants
Fuel Types Solar

Map of Farmers Electric Cooperative

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Farmers Electric Cooperative.

Create Your Account Today

Monthly Net Generation for Farmers Electric Cooperative

280280210210140140707000Jul '22Jul '2220232023Jul '23Jul '2320242024Jul '24Jul '24
Download SVG
Download PNG
Download CSV

Farmers Electric Cooperative Details

Summary Information
Plant NameFarmers Electric Cooperative (66610)
Plant AddressEast Teresa Dr. / Jackson 248, Newport, AR 72112
UtilityToday's Power, Inc. (61204)
Latitude, Longitude35.62955, -91.23051
Generation Dates on FileJan 2022 to Dec 2024
Initial Operation DateJune 2019
Annual Generation 2.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment
Transmission / Distribution OwnerFarmers Electric Coop Corp - (AR) (6206) AR
Grid Voltage 0.48 kV / 13.80 kV
Energy StorageNo

Generator SOL Details Operating June 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2019
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Solid Fuel Gasification No
Other Planned ModificationsNo
Multiple FuelsNo
Switch Between Oil And Natural GasNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Farmers Electric Cooperative Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4956Lakeland Electric Co. (FL) - Airport IILakeland, FL2.2 GWh
#4957Novel Martens Solar LLC(CSG)Lafayette, MN2.2 GWh
#4958Skidmore CollegeSaratoga Springs, NY2.2 GWh
#4959Kearsarge Oppenheim CSGSt. Johnsville, NY2.2 GWh
#4960CBP SolarBuchanan, NY2.2 GWh
#4961Cranberry Highway Solar LLCWareham, MA2.2 GWh
#4962USS Wonder Solar LLCBird Island, MN2.2 GWh
#4963Bed Bath & Beyond DC Port Reading NJPort Reading, NJ2.2 GWh
#4964Warren County SolarBelvidere, NJ2.2 GWh
#4965Bogart SolarPalenville, NY2.2 GWh
#4967Barre II Solar ProjectBarre, MA2.2 GWh
#4968Whistling Winds DPC SolarNew Lisbon, WI2.2 GWh
#4969USS Mesa Solar LLCDanube, MN2.2 GWh
#4970South GardenWinstead, MN2.2 GWh
#4971Hammonton-High School SolarAtlantic, NJ2.2 GWh
#4972Christmas Tree Shops DC Burlington NJFlorence Township, NJ2.2 GWh
#4973Chicopee Granby Road SolarChicopee, MA2.2 GWh
#4974City of Green Forest (Carroll)Berryville, AR2.2 GWh
#4975Courtland CSG LLCCourtland, MN2.2 GWh
#4976The Village at Orchard Ridge (TVOR)Winchester, VA2.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Farmers Electric Cooperative.

Plant NamePlant LocationAnnual GenerationDistance
Craighead Electric Solar OneBrookland, AR2.2 GWh42.3 mi
Crossover WindWynne, AR29.1 GWh38 mi
Forrest City- Eldridge RoadForrest City, AR2.0 GWh47.3 mi
Greers Ferry LakeHeber Springs, AR163.4 GWh43.6 mi
Happy Solar 1Searcy, AR218.4 GWh40.1 mi
Independence Steam Electric StationNewark, AR5.5 TWh10.6 mi
Jonesboro City Water & Light PlantJonesboro, AR78.0 GWh32.1 mi
Jonesboro CWL Solar ParkJonesboro, AR22.1 GWh38.7 mi
Newport Solar ProjectNewport, AR342.0 GWh3.7 mi
Paragould ReciprocatingParagould, AR428.0 MWh48.7 mi
Quartz Solar, LLCWynne, AR148.6 GWh38.2 mi
Searcy Solar HybridSearcy, AR204.9 GWh37.7 mi
Searcy Water ISearcy, AR834.0 MWh37.1 mi
Searcy Water IISearcy, AR3.5 GWh40.2 mi
White River Lock and Dam 1Batesville, AR12.3 GWh24.5 mi
White River Lock and Dam 2Locust Grove, AR12.6 GWh31 mi
White River Lock and Dam 3Marcella, AR24.6 GWh37.8 mi
White River Medical CenterNewport, AR5.2 GWh2 mi
Woodruff County SolarAugusta, AR179.7 GWh26.5 mi
Woodruff Electric CooperativeForrest City, AR2.2 GWh46.7 mi