Harvest Gold Solar
143 Boyer Steiner Rd, Indianola, MS 38751Plant Summary Information
Harvest Gold Solar is ranked #33 out of 55 power plants in Mississippi in terms of total annual net electricity generation.
Harvest Gold Solar generated 33.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Harvest Gold Solar |
---|---|
Utility Name | Harvest Gold Solar Power, LLC |
Location | Sunflower County, MS |
Initial Operation Date | August 2024 |
Last Update | Mar 2025 |
Annual Generation | 118.8 GWh |
Annual Consumption | 405.2 k MMBtu |
Ranked #3,073 out of 12,288 Power Plants Nationwide | |
Ranked #609 out of 6,174 Solar Power Plants Nationwide | |
Ranked #33 out of 55 Mississippi Power Plants | |
Ranked #7 out of 22 Mississippi Solar Power Plants | |
Fuel Types | Solar |
Map of Harvest Gold Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harvest Gold Solar.
Monthly Net Generation for Harvest Gold Solar
Harvest Gold Solar Details
Summary Information | |
---|---|
Plant Name | Harvest Gold Solar (66623) |
Plant Address | 143 Boyer Steiner Rd, Indianola, MS 38751 |
Utility | Harvest Gold Solar Power, LLC (65650) |
Latitude, Longitude | 33.505, -90.636 |
Generation Dates on File | Aug 2024 to Mar 2025 |
Initial Operation Date | August 2024 |
Annual Generation | 118.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG23-156-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Entergy Mississippi LLC (12685) MS |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator HGS Details Operating August 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EMBA.HVGSOL |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EMBA.HVGSOL |
Nameplate Capacity | 99 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 99 MW |
Winter Capacity | 99 MW |
---|---|
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
DC Net Capacity | 138.4 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Harvest Gold Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#599 | SolaireHolman Solar Project | Alpine, TX | 120.9 GWh |
#600 | Innovative Solar 42 | Fayetteville, NC | 120.9 GWh |
#601 | Palmetto Plains | Bowman, SC | 120.8 GWh |
#602 | Little Manatee River Solar | Ruskin, FL | 120.7 GWh |
#603 | Little Bear 5 | Mendota, CA | 120.7 GWh |
#604 | Vikings Energy Farm | Holtville, CA | 110.3 GWh |
#605 | Meridian III | Meridian, MS | 120.0 GWh |
#606 | Debary Solar Power Plant | DeBary, FL | 119.8 GWh |
#607 | Boulder Solar II, LLC | Boulder City, NV | 119.7 GWh |
#608 | Alpine Solar | Lancaster, CA | 118.8 GWh |
#610 | Techren Solar V | Boulder, NV | 118.7 GWh |
#611 | Payne Creek Solar | Bowling Green, FL | 118.7 GWh |
#612 | Hooper Solar | Mosca, CO | 118.3 GWh |
#613 | Wolf Run Solar | Chapin, IL | 118.3 GWh |
#614 | Alafia Solar | Mulberry, FL | 117.8 GWh |
#615 | Twin Lakes | Interlachen, FL | 117.7 GWh |
#616 | Sandstone Solar | Florence, AZ | 117.2 GWh |
#617 | Skysol | Merrill, OR | 117.1 GWh |
#618 | Manatee Solar Energy Center | Parrish, FL | 102.1 GWh |
#619 | Meherrin Solar | Skippers, VA | 116.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harvest Gold Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 76.3 mi |
Attala | Sallis, MS | 2.2 TWh | 65 mi |
Batesville Generation Facility | Batesville, MS | 4.9 TWh | 70.3 mi |
CF Industries Yazoo City Complex | Yazoo City, MS | 142.2 GWh | 44.1 mi |
Chicot Solar | Lake Village, AR | 214.4 GWh | 41.1 mi |
Choctaw County | French Camp, MS | 5.5 TWh | 71.7 mi |
Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh | 37.3 mi |
Crossroads Energy Center | Clarksdale, MS | 123.5 GWh | 47 mi |
Dam 2 | Dumas, AR | 400.7 GWh | 51.3 mi |
Delta Wind Farm (MS) | Dundee, MS | 525.5 GWh | 68.1 mi |
Delta's Edge Solar | Greenwood, MS | 201.5 GWh | 30.9 mi |
Ergon Refining Vicksburg | Vicksburg, MS | 31.8 GWh | 78.8 mi |
Gerald Andrus | Greenville, MS | 434.9 GWh | 29.7 mi |
International Paper Vicksburg Mill | Vicksburg, MS | 203.6 GWh | 67.9 mi |
Prairie Mist Solar | Montrose, AR | 92.3 GWh | 62 mi |
Ragsdale Solar LLC | Canton, MS | 69.3 GWh | 75.2 mi |
SR Panola I, LLC | Batesville, MS | 4.4 GWh | 66.6 mi |
SR Panola II, LLC | Batesville, MS | 3.9 GWh | 71.1 mi |
Star City School District | Star City, AR | 2.8 GWh | 74.5 mi |
Sunflower County | Ruleville, MS | 101.0 GWh | 18.4 mi |