Long Lake Solar, LLC
Long Lake Road, West Helena, AR 72342Plant Summary Information
Long Lake Solar, LLC is ranked #16 out of 115 power plants in Arkansas in terms of total annual net electricity generation.
Long Lake Solar, LLC generated 135.2 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Long Lake Solar, LLC |
|---|---|
| Utility Name | Long Lake Solar, LLC |
| Location | Phillips County, AR |
| Initial Operation Date | April 2025 |
| Last Update | May 2026 |
| Annual Generation | 492.4 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,377 out of 13,081 Power Plants Nationwide | |
| Ranked #129 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #16 out of 115 Arkansas Power Plants | |
| Ranked #1 out of 71 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
Map of Long Lake Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Long Lake Solar, LLC.
Monthly Net Generation for Long Lake Solar, LLC
Monthly Plant Fuel Consumption for Long Lake Solar, LLC
Long Lake Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Long Lake Solar, LLC (66649) |
| Plant Address | Long Lake Road, West Helena, AR 72342 |
| Utility | Long Lake Solar, LLC (65676) |
| Latitude, Longitude | 34.46865, -90.61511 |
| Generation Dates on File | Apr 2025 to May 2026 |
| Initial Operation Date | April 2025 |
| Annual Generation | 492.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator LLS Details Operating April 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 280 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Long Lake Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #119 | Galloway 1 Solar Farm | Paint Rock, TX | 501.2 GWh |
| #120 | Azure Sky Solar | Haskell, TX | 491.6 GWh |
| #121 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 495.6 GWh |
| #122 | Fighting Jays Solar Project | Needville, TX | 497.0 GWh |
| #123 | Noble Solar | Krum, TX | 493.4 GWh |
| #124 | ENGIE Long Draw Solar LLC | Gail, TX | 495.5 GWh |
| #125 | RE Tranquillity | Cantua Creek, CA | 484.8 GWh |
| #126 | BT Hickerson Solar, LLC | Clifton, TX | 494.8 GWh |
| #127 | ANSON Solar Center, LLC | Anson, TX | 494.7 GWh |
| #128 | Bernard Creek Solar | Hungerford, TX | 494.0 GWh |
| #130 | Angelo Solar | San Angelo, TX | 491.8 GWh |
| #131 | Great Valley Solar Portfolio Holdings, L | Cantua Creek, CA | 491.5 GWh |
| #132 | Scarlet Solar (CA) | Fresno, CA | 482.6 GWh |
| #133 | Delilah Solar Energy II LLC | Bogota, TX | 486.4 GWh |
| #134 | Parliament Solar | Waller, TX | 485.1 GWh |
| #135 | Proxima | Crows Landing, CA | 464.5 GWh |
| #136 | Sparta Solar | Pawnee, TX | 481.0 GWh |
| #137 | Townsite Solar Project Hybrid | Boulder City, NV | 465.2 GWh |
| #138 | Taygete II Energy Project | Coyanosa, TX | 474.4 GWh |
| #139 | Decatur Solar | Climax, GA | 474.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Long Lake Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allen | Memphis, TN | 5.4 TWh | 49.5 mi |
| Batesville Generation Facility | Batesville, MS | 5.3 TWh | 40.3 mi |
| Crossroads Energy Center | Clarksdale, MS | 64.7 GWh | 20 mi |
| Dam 2 | Dumas, AR | 385.1 GWh | 52.1 mi |
| Delta Wind Farm (MS) | Dundee, MS | 513.7 GWh | 12.7 mi |
| Flat Fork Solar | Wheatley, AR | 338.9 GWh | 39.9 mi |
| Forrest City- Eldridge Road | Forrest City, AR | 2.0 GWh | 40.8 mi |
| Forrest City- Prison Site | Forrest City, AR | 1.8 GWh | 36.9 mi |
| L L Wilkins | Clarksdale, MS | 166.0 MWh | 19.9 mi |
| SR Panola I, LLC | Batesville, MS | 10.4 GWh | 37.6 mi |
| SR Panola II, LLC | Batesville, MS | 6.7 GWh | 41.1 mi |
| SR Panola III, LLC | Batesville, MS | 7.6 GWh | 37.6 mi |
| Stuttgart Solar | Stuttgart, AR | 149.5 GWh | 47 mi |
| Sunflower County | Ruleville, MS | 158.3 GWh | 49.3 mi |
| TVA Southaven Combined Cycle | Southaven, MS | 5.4 TWh | 48.9 mi |
| Walnut Bend Solar Station PV | Moro, AR | 205.5 GWh | 37.9 mi |
| West Memphis Solar Station | Crawfordsville, AR | 316.2 GWh | 50.6 mi |
| Wildflower Solar, LLC (MS) | DeSoto, MS | 199.8 GWh | 42 mi |
| Wildwood Solar Plant | Tutwiler, MS | 103.6 GWh | 40.1 mi |
| Woodruff Electric Cooperative | Forrest City, AR | 2.1 GWh | 41.2 mi |