Foote Creek Rim
180 Ex 373 N 2 Mile Rte 13, McFadden, WY 82083Plant Summary Information
Foote Creek Rim is ranked #17 out of 74 power plants in Wyoming in terms of total annual net electricity generation.
Foote Creek Rim generated 211.4 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Foote Creek Rim |
|---|---|
| Utility Name | PacifiCorp |
| Location | Carbon County, WY |
| Initial Operation Date | December 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 650.7 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #1,072 out of 12,637 Power Plants Nationwide | |
| Ranked #237 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #17 out of 74 Wyoming Power Plants | |
| Ranked #8 out of 32 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of Foote Creek Rim
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Foote Creek Rim.
Monthly Net Generation for Foote Creek Rim
Monthly Plant Fuel Consumption for Foote Creek Rim
Foote Creek Rim Details
| Summary Information | |
|---|---|
| Plant Name | Foote Creek Rim (67916) |
| Plant Address | 180 Ex 373 N 2 Mile Rte 13, McFadden, WY 82083 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 41.6283, -106.2013 |
| Generation Dates on File | Dec 2024 to Feb 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 650.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 135.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 134.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 134.8 MW |
| Winter Capacity | 134.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 43 |
| Turbine Details | |
| Number Of Turbines | 43 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V136-4.2 |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 136 |
Foote Creek Rim Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #227 | Maple Ridge Wind Farm | Lowville, NY | 664.3 GWh |
| #228 | Wildcat Ranch Wind Project | Morton, TX | 660.5 GWh |
| #229 | Patriot Wind Farm | Bishop, TX | 659.3 GWh |
| #230 | Brazos Wind Farm | Fluvanna, TX | 658.7 GWh |
| #231 | Coyote Wind LLC | Snyder, TX | 658.5 GWh |
| #232 | Sholes Wind Energy Center | Randolph, NE | 658.0 GWh |
| #233 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 657.8 GWh |
| #234 | Reading Wind Project | Reading, KS | 651.9 GWh |
| #235 | Minonk Wind Farm | Minonk, IL | 651.1 GWh |
| #236 | Raymond Wind Farm, LLC | Lyford, TX | 650.9 GWh |
| #238 | Bearkat | St. Lawrence, TX | 647.3 GWh |
| #239 | California Ridge Wind Energy LLC | Fithian, IL | 643.9 GWh |
| #240 | Castle Gap Wind | Goldthwaite, TX | 643.6 GWh |
| #241 | Limon III Wind LLC | Limon, CO | 643.3 GWh |
| #242 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 642.7 GWh |
| #243 | Heart of Texas Wind Project | Brady, TX | 640.5 GWh |
| #244 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 638.4 GWh |
| #245 | Goodwell Wind Project LLC | Goodwell, OK | 637.5 GWh |
| #246 | Ledyard Windpower, LLC | Lakota, IA | 636.8 GWh |
| #247 | Meadow Lake Wind Farm VI LLC | Remington, IN | 635.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Foote Creek Rim.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 68.9 mi |
| Boswell Wind | Rock River, WY | 1.2 TWh | 26.4 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 28.8 mi |
| Ekola Flats | Hanna, WY | 761.5 GWh | 22.5 mi |
| Foote Creek I | McFadden, WY | 215.5 GWh | 0 mi |
| Foote Creek III | McFadden, WY | 14.6 GWh | 2.8 mi |
| Foote Creek IV | Rock River, WY | 11.6 GWh | 3.4 mi |
| Fremont Canyon | Alcova, WY | 227.7 GWh | 66.1 mi |
| High Plains | Rock River, WY | 274.1 GWh | 10.3 mi |
| Kortes | Sinclair, WY | 155.4 GWh | 51.4 mi |
| McFadden Ridge | Rock River, WY | 84.1 GWh | 12.7 mi |
| Medicine Bow | Medicine Bow, WY | 11.1 GWh | 14.5 mi |
| Rock Creek Wind | McFadden, WY | 369.7 GWh | 7.1 mi |
| Roundhouse Wind Energy Project | Cheyenne, WY | 849.1 GWh | 67.6 mi |
| Seminoe | Sinclair, WY | 137.0 GWh | 51.5 mi |
| Seven Mile Hill | Medicine Bow, WY | 399.8 GWh | 22.1 mi |
| Silver Sage Windpower | Cheyenne, WY | 101.0 GWh | 70.1 mi |
| Sinclair Oil Refinery | Sinclair, WY | 5.4 GWh | 48 mi |
| TB Flats | Medicine Bow, WY | 1.4 TWh | 38 mi |
| Whiskey Hill Solar | Walden, CO | 2.3 GWh | 56.6 mi |