Foote Creek Rim
1529 WY Hwy 13, McFadden, WY 82083Plant Summary Information
Foote Creek Rim is ranked #16 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
Foote Creek Rim generated 111.8 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Foote Creek Rim |
|---|---|
| Utility Name | PacifiCorp |
| Location | Carbon County, WY |
| Initial Operation Date | December 2024 |
| Last Update | Jun 2026 |
| Annual Generation | 623.2 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,118 out of 13,094 Power Plants Nationwide | |
| Ranked #260 out of 1,369 Wind Power Plants Nationwide | |
| Ranked #16 out of 69 Wyoming Power Plants | |
| Ranked #8 out of 27 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of Foote Creek Rim
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Foote Creek Rim.
Monthly Net Generation for Foote Creek Rim
Monthly Plant Fuel Consumption for Foote Creek Rim
Foote Creek Rim Details
| Summary Information | |
|---|---|
| Plant Name | Foote Creek Rim (67916) |
| Plant Address | 1529 WY Hwy 13, McFadden, WY 82083 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 41.6283, -106.2013 |
| Generation Dates on File | Dec 2024 to Jun 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 623.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 135.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 134.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 134.8 MW |
| Winter Capacity | 134.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 43 |
| Turbine Details | |
| Number Of Turbines | 43 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V136-4.2 |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 136 |
Foote Creek Rim Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #250 | Horseshoe Bend Wind LLC | Arlington, OR | 634.9 GWh |
| #251 | Peyton Creek Wind Farm II | Bay City, TX | 634.2 GWh |
| #252 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 633.6 GWh |
| #253 | Patriot Wind Farm | Bishop, TX | 633.3 GWh |
| #254 | Brady II Wind Energy Center | Dickinson, ND | 631.6 GWh |
| #255 | Heart of Texas Wind Project | Brady, TX | 631.3 GWh |
| #256 | Willow Creek Wind (OK) | Morrison, OK | 627.8 GWh |
| #257 | Kelly Creek Wind Project | Cabery, IL | 627.4 GWh |
| #258 | Sweetwater Wind 4 LLC | Roscoe, TX | 626.4 GWh |
| #259 | Bloom Wind | Minneola, KS | 625.9 GWh |
| #261 | Mammoth Plains | Oakwood, OK | 623.0 GWh |
| #262 | Minonk Wind Farm | Minonk, IL | 622.9 GWh |
| #263 | Gopher Creek Wind Farm | Fluvanna, TX | 622.6 GWh |
| #264 | Vienna Wind Farm | Marshalltown, IA | 621.7 GWh |
| #265 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 616.4 GWh |
| #266 | Mesteno | Rio Grande City, TX | 614.9 GWh |
| #267 | Castle Gap Wind | Goldthwaite, TX | 614.8 GWh |
| #268 | Prairie Wind Farm | Montezuma, IA | 613.7 GWh |
| #269 | Marengo Wind Plant | Dayton, WA | 612.6 GWh |
| #270 | Pattern Panhandle Wind LLC | Panhandle, TX | 611.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Foote Creek Rim.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 107.2 GWh | 68.9 mi |
| Boswell Wind | Rock River, WY | 1.2 TWh | 26.4 mi |
| Corriedale Wind Energy | Cheyenne, WY | 224.6 GWh | 72.5 mi |
| Dunlap | Medicine Bow, WY | 416.7 GWh | 28.8 mi |
| Ekola Flats | Medicine Bow, WY | 787.9 GWh | 22.5 mi |
| Fremont Canyon | Alcova, WY | 233.5 GWh | 66.1 mi |
| Happy Jack Windpower Project | Cheyenne, WY | 67.1 GWh | 70.9 mi |
| High Plains | Rock River, WY | 341.2 GWh | 10.3 mi |
| Kortes | Sinclair, WY | 105.7 GWh | 51.4 mi |
| Laramie River Station | Wheatland, WY | 7.9 TWh | 75.5 mi |
| McFadden Ridge | Rock River, WY | 104.8 GWh | 12.7 mi |
| Rock Creek Wind | McFadden, WY | 565.9 GWh | 7.1 mi |
| Roundhouse Renewable Energy II | Granite, WY | 402.2 GWh | 74.1 mi |
| Roundhouse Wind Energy Project | Cheyenne, WY | 909.9 GWh | 67.6 mi |
| Seminoe | Sinclair, WY | 84.5 GWh | 51.5 mi |
| Seven Mile Hill | Hanna, WY | 458.3 GWh | 22.1 mi |
| Silver Sage Windpower | Cheyenne, WY | 105.8 GWh | 70.1 mi |
| Sinclair Oil Refinery | Sinclair, WY | 5.9 GWh | 48 mi |
| TB Flats | Medicine Bow, WY | 1.4 TWh | 38 mi |
| Whiskey Hill Solar | Walden, CO | 2.1 GWh | 56.6 mi |