Foote Creek Rim
180 Ex 373 N 2 Mile Rte 13, McFadden, WY 82083Plant Summary Information
Foote Creek Rim is ranked #17 out of 70 power plants in Wyoming in terms of total annual net electricity generation.
Foote Creek Rim generated 197.5 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Foote Creek Rim |
|---|---|
| Utility Name | PacifiCorp |
| Location | Carbon County, WY |
| Initial Operation Date | December 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 642.4 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #1,087 out of 12,332 Power Plants Nationwide | |
| Ranked #244 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #17 out of 70 Wyoming Power Plants | |
| Ranked #8 out of 28 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of Foote Creek Rim
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Foote Creek Rim.
Monthly Net Generation for Foote Creek Rim
Monthly Plant Fuel Consumption for Foote Creek Rim
Foote Creek Rim Details
| Summary Information | |
|---|---|
| Plant Name | Foote Creek Rim (67916) |
| Plant Address | 180 Ex 373 N 2 Mile Rte 13, McFadden, WY 82083 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 41.6283, -106.2013 |
| Generation Dates on File | Dec 2024 to Mar 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 642.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 135.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 134.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 134.8 MW |
| Winter Capacity | 134.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 43 |
| Turbine Details | |
| Number Of Turbines | 43 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V136-4.2 |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 136 |
Foote Creek Rim Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #234 | Sholes Wind Energy Center | Randolph, NE | 655.3 GWh |
| #235 | Wildcat Ranch Wind Project | Morton, TX | 654.5 GWh |
| #236 | Minonk Wind Farm | Minonk, IL | 651.1 GWh |
| #237 | Reading Wind Project | Reading, KS | 649.6 GWh |
| #238 | California Ridge Wind Energy LLC | Fithian, IL | 649.5 GWh |
| #239 | Heart of Texas Wind Project | Brady, TX | 648.6 GWh |
| #240 | Raymond Wind Farm, LLC | Lyford, TX | 647.9 GWh |
| #241 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 645.8 GWh |
| #242 | Jayhawk Wind Energy Center | Hepler, KS | 645.0 GWh |
| #243 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 643.9 GWh |
| #245 | Frontier Windpower II | Blackwell, OK | 640.9 GWh |
| #246 | King Plains Wind Project | Garber, OK | 634.3 GWh |
| #247 | Meadow Lake Wind Farm VI LLC | Remington, IN | 634.2 GWh |
| #248 | Horizon Hill Wind Project | Crescent, OK | 634.0 GWh |
| #249 | Brady Wind Energy Center | Dickinson, ND | 632.3 GWh |
| #250 | Cimarron Bend III | Minneola, KS | 631.0 GWh |
| #251 | Sweetwater Wind 4 LLC | Roscoe, TX | 630.2 GWh |
| #252 | Castle Gap Wind | Goldthwaite, TX | 630.2 GWh |
| #253 | Aragonne Wind LLC | Santa Rosa, NM | 627.7 GWh |
| #254 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Foote Creek Rim.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 68.9 mi |
| Boswell Wind | Rock River, WY | 1.2 TWh | 26.4 mi |
| Corriedale Wind Energy | Cheyenne, WY | 222.6 GWh | 72.5 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 28.8 mi |
| Ekola Flats | Hanna, WY | 765.2 GWh | 22.5 mi |
| Fremont Canyon | Alcova, WY | 227.7 GWh | 66.1 mi |
| Happy Jack Windpower Project | Cheyenne, WY | 63.3 GWh | 70.9 mi |
| High Plains | Rock River, WY | 274.1 GWh | 10.3 mi |
| Kortes | Sinclair, WY | 155.4 GWh | 51.4 mi |
| McFadden Ridge | Rock River, WY | 84.1 GWh | 12.7 mi |
| Medicine Bow | Medicine Bow, WY | 11.1 GWh | 14.5 mi |
| Rock Creek Wind | McFadden, WY | 427.8 GWh | 7.1 mi |
| Roundhouse Renewable Energy II | Granite, WY | 395.8 GWh | 74.1 mi |
| Roundhouse Wind Energy Project | Cheyenne, WY | 896.7 GWh | 67.6 mi |
| Seminoe | Sinclair, WY | 137.0 GWh | 51.5 mi |
| Seven Mile Hill | Medicine Bow, WY | 399.8 GWh | 22.1 mi |
| Silver Sage Windpower | Cheyenne, WY | 101.4 GWh | 70.1 mi |
| Sinclair Oil Refinery | Sinclair, WY | 5.6 GWh | 48 mi |
| TB Flats | Medicine Bow, WY | 1.4 TWh | 38 mi |
| Whiskey Hill Solar | Walden, CO | 2.3 GWh | 56.6 mi |