Campbell Hill Windpower
1068 Cole Creek Road, Glenrock, WY 82637Plant Summary Information
Campbell Hill Windpower is ranked #33 out of 74 power plants in Wyoming in terms of total annual net electricity generation.
Campbell Hill Windpower generated 31.3 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Campbell Hill Windpower |
|---|---|
| Utility Name | Duke Energy Renewables Services |
| Location | Converse County, WY |
| Initial Operation Date | December 2009 |
| Last Update | Oct 2025 |
| Annual Generation | 254.3 GWh |
| Annual Consumption | 938.1 k MMBtu |
| Ranked #2,189 out of 12,553 Power Plants Nationwide | |
| Ranked #655 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #33 out of 74 Wyoming Power Plants | |
| Ranked #19 out of 32 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Duke Energy DEGS Campbell Hill (2013 to 2021) Duke Energy Renewables Services (2022 to 2024) |
Map of Campbell Hill Windpower
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Campbell Hill Windpower.
Monthly Net Generation for Campbell Hill Windpower
Campbell Hill Windpower Details
| Summary Information | |
|---|---|
| Plant Name | Campbell Hill Windpower (57090) |
| Plant Address | 1068 Cole Creek Road, Glenrock, WY 82637 |
| Utility | Duke Energy Renewables Services (65411) |
| Latitude, Longitude | 43.01455, -105.999 |
| Generation Dates on File | Dec 2009 to Oct 2025 |
| Initial Operation Date | December 2009 |
| Annual Generation | 254.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator CHWF Details Operating December 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 99 MW |
| Summer Capacity | 99 MW |
| Winter Capacity | 99 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 66 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 66 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Campbell Hill Windpower Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #645 | Wapsipinicon Wind Project | Dexter, MN | 259.7 GWh |
| #646 | Rocky Ridge Wind Project | Hobart, OK | 259.5 GWh |
| #647 | Laurel Mountain Hybrid | Belington, WV | 256.6 GWh |
| #648 | Stillwater Wind, LLC | Reed Point, MT | 258.3 GWh |
| #649 | EcoGrove Wind LLC | Lena, IL | 258.0 GWh |
| #650 | Sendero | Hebbronville, TX | 257.7 GWh |
| #651 | Copenhagen Wind Farm | Copenhagen, NY | 257.6 GWh |
| #652 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 257.3 GWh |
| #653 | FPL Energy Vansycle LLC (OR) | Touchet, OR | 257.0 GWh |
| #654 | Kibby Wind Facility | Chain of Ponds, ME | 255.3 GWh |
| #656 | Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh |
| #657 | Broken Bow Wind II, LLC | Broken Bow, NE | 253.6 GWh |
| #658 | South Trent Wind Farm | Sweetwater, TX | 252.5 GWh |
| #659 | San Roman Wind I, LLC | Los Fresnos, TX | 252.1 GWh |
| #660 | Apple Blossom Wind Farm | Pigeon, MI | 252.1 GWh |
| #661 | Ironwood Wind | Spearville, KS | 251.7 GWh |
| #662 | Pheasant Run Wind LLC | Pigeon, MI | 251.5 GWh |
| #663 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
| #664 | Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh |
| #665 | Notrees Windpower Hybrid | Goldsmith, TX | 246.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Campbell Hill Windpower.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 48.6 mi |
| Anticline Wind | Casper, WY | 307.4 GWh | 19.8 mi |
| Barber Creek | Gillette, WY | 273.0 MWh | 50.2 mi |
| Casper Wind Farm | Evansville, WY | 5.7 GWh | 14.4 mi |
| Cedar Springs I | Douglas, WY | 701.1 GWh | 26.6 mi |
| Cedar Springs II | Douglas, WY | 632.2 GWh | 32.2 mi |
| Cedar Springs III | Douglas, WY | 484.0 GWh | 21.4 mi |
| Cedar Springs Wind IV | Douglas, WY | 786.1 GWh | 15.7 mi |
| Dave Johnston | Glen Rock, WY | 4.6 TWh | 16.6 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 67.6 mi |
| Fremont Canyon | Alcova, WY | 227.7 GWh | 54.9 mi |
| Glendo | Glendo, WY | 87.7 GWh | 65.1 mi |
| Glenrock | Glenrock, WY | 401.0 GWh | 8.3 mi |
| Hartzog | Wright, WY | 178.0 MWh | 61 mi |
| Kortes | Sinclair, WY | 155.4 GWh | 73.4 mi |
| Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh | 20.9 mi |
| Rolling Hills | Glenrock, WY | 244.8 GWh | 7.9 mi |
| Seminoe | Sinclair, WY | 137.0 GWh | 75.2 mi |
| TB Flats | Medicine Bow, WY | 1.3 TWh | 59.1 mi |
| Top of the World Windpower Project | Glenrock, WY | 457.4 GWh | 12.3 mi |