Campbell Hill Windpower
1068 Cole Creek Road, Glenrock, WY 82637Plant Summary Information
Campbell Hill Windpower is ranked #32 out of 73 power plants in Wyoming in terms of total annual net electricity generation.
Campbell Hill Windpower generated 35.0 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Campbell Hill Windpower |
|---|---|
| Utility Name | Duke Energy Renewables Services |
| Location | Converse County, WY |
| Initial Operation Date | December 2009 |
| Last Update | Sep 2025 |
| Annual Generation | 263.4 GWh |
| Annual Consumption | 953.1 k MMBtu |
| Ranked #2,128 out of 12,539 Power Plants Nationwide | |
| Ranked #640 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #32 out of 73 Wyoming Power Plants | |
| Ranked #19 out of 31 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Duke Energy DEGS Campbell Hill (2013 to 2021) Duke Energy Renewables Services (2022 to 2024) |
Map of Campbell Hill Windpower
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Campbell Hill Windpower.
Monthly Net Generation for Campbell Hill Windpower
Campbell Hill Windpower Details
| Summary Information | |
|---|---|
| Plant Name | Campbell Hill Windpower (57090) |
| Plant Address | 1068 Cole Creek Road, Glenrock, WY 82637 |
| Utility | Duke Energy Renewables Services (65411) |
| Latitude, Longitude | 43.01455, -105.999 |
| Generation Dates on File | Dec 2009 to Sep 2025 |
| Initial Operation Date | December 2009 |
| Annual Generation | 263.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator CHWF Details Operating December 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 99 MW |
| Summer Capacity | 99 MW |
| Winter Capacity | 99 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 66 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 66 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Campbell Hill Windpower Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #630 | Steele Flats Wind Project LLC | Diller, NE | 269.1 GWh |
| #631 | Notrees Windpower Hybrid | Goldsmith, TX | 264.5 GWh |
| #632 | Hatchet Ridge Wind Project | Burney, CA | 268.2 GWh |
| #633 | Shiloh III Wind Project LLC | Birds Landing, CA | 265.2 GWh |
| #634 | Bull Creek Wind | O'Donnell, TX | 265.2 GWh |
| #635 | Mehoopany Wind Energy LLC | Noxen, PA | 265.0 GWh |
| #636 | Gray County Wind Energy | Montezuma, KS | 264.1 GWh |
| #637 | Mendota Hills, LLC | Paw Paw, IL | 263.7 GWh |
| #638 | Harvest Wind Project | Roosevelt, WA | 263.7 GWh |
| #639 | Borderlands Wind, LLC | Quemado, NM | 263.6 GWh |
| #641 | Windstar 1 | Tehachapi, CA | 263.0 GWh |
| #642 | Blue Canyon Windpower V LLC | Carnegie, OK | 262.8 GWh |
| #643 | Apple Blossom Wind Farm | Pigeon, MI | 262.4 GWh |
| #644 | Copenhagen Wind Farm | Copenhagen, NY | 262.1 GWh |
| #645 | Lake Winds Energy Park | Ludington, MI | 262.1 GWh |
| #646 | Kibby Wind Facility | Chain of Ponds, ME | 261.9 GWh |
| #647 | Rising Tree Wind Farm III | Mojave, CA | 261.4 GWh |
| #648 | Keenan II Renewable Energy Co LLC | Woodward, OK | 260.6 GWh |
| #649 | Wapsipinicon Wind Project | Dexter, MN | 259.7 GWh |
| #650 | Rocky Ridge Wind Project | Hobart, OK | 259.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Campbell Hill Windpower.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 48.6 mi |
| Anticline Wind | Casper, WY | 274.8 GWh | 19.8 mi |
| Barber Creek | Gillette, WY | 273.0 MWh | 50.2 mi |
| Casper Wind Farm | Evansville, WY | 5.7 GWh | 14.4 mi |
| Cedar Springs I | Douglas, WY | 692.7 GWh | 26.6 mi |
| Cedar Springs II | Douglas, WY | 611.5 GWh | 32.2 mi |
| Cedar Springs III | Douglas, WY | 483.8 GWh | 21.4 mi |
| Cedar Springs Wind IV | Douglas, WY | 683.4 GWh | 15.7 mi |
| Dave Johnston | Glen Rock, WY | 4.6 TWh | 16.6 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 67.6 mi |
| Fremont Canyon | Alcova, WY | 227.7 GWh | 54.9 mi |
| Glendo | Glendo, WY | 87.7 GWh | 65.1 mi |
| Glenrock | Glenrock, WY | 401.0 GWh | 8.3 mi |
| Hartzog | Wright, WY | 178.0 MWh | 61 mi |
| Kortes | Sinclair, WY | 155.4 GWh | 73.4 mi |
| Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh | 20.9 mi |
| Rolling Hills | Glenrock, WY | 244.8 GWh | 7.9 mi |
| Seminoe | Sinclair, WY | 137.0 GWh | 75.2 mi |
| TB Flats | Medicine Bow, WY | 1.3 TWh | 59.1 mi |
| Top of the World Windpower Project | Glenrock, WY | 461.0 GWh | 12.3 mi |