Smoky Hills Wind Project Phase I
223 North Highway 14, Lincoln, KS 67455Plant Summary Information
Smoky Hills Wind Project Phase I is ranked #49 out of 170 power plants in Kansas in terms of total annual net electricity generation.
Smoky Hills Wind Project Phase I generated 75.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Smoky Hills Wind Project Phase I |
---|---|
Utility Name | Smoky Hills Wind Farm I LLC |
Location | Lincoln County, KS |
Initial Operation Date | January 2008 |
Last Update | Dec 2024 |
Annual Generation | 250.8 GWh |
Annual Consumption | 941.1 k MMBtu |
Ranked #2,130 out of 12,299 Power Plants Nationwide | |
Ranked #662 out of 1,353 Wind Power Plants Nationwide | |
Ranked #49 out of 170 Kansas Power Plants | |
Ranked #39 out of 50 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Smoky Hills Wind Project Phase I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Smoky Hills Wind Project Phase I.
Monthly Net Generation for Smoky Hills Wind Project Phase I
Smoky Hills Wind Project Phase I Details
Summary Information | |
---|---|
Plant Name | Smoky Hills Wind Project Phase I (56488) |
Plant Address | 223 North Highway 14, Lincoln, KS 67455 |
Utility | Smoky Hills Wind Farm I LLC (55886) |
Latitude, Longitude | 38.87994, -98.16016 |
Generation Dates on File | Jan 2008 to Dec 2024 |
Initial Operation Date | January 2008 |
Annual Generation | 250.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 07-83-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Westar Energy Inc (22500) KS |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 100.8 MW |
Summer Capacity | 100.8 MW |
Winter Capacity | 100.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 56 |
Turbine Details | |
Number Of Turbines | 56 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V80-1.8 |
Design Wind Speed | 24 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 328 |
Smoky Hills Wind Project Phase I Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#652 | Laurel Mountain Hybrid | Belington, WV | 253.1 GWh |
#653 | FPL Energy Vansycle LLC (OR) | Touchet, OR | 257.0 GWh |
#654 | Criterion | Oakland, MD | 256.6 GWh |
#655 | Sigel Wind Park | Harbor Beach, MI | 256.1 GWh |
#656 | South Peak Wind | Geyser, MT | 255.7 GWh |
#657 | Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh |
#658 | Cimarron Windpower II | Cimarron, KS | 253.9 GWh |
#659 | South Trent Wind Farm | Sweetwater, TX | 252.5 GWh |
#660 | Brookfield | Pigeon, MI | 252.1 GWh |
#661 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
#663 | Rockland Wind Farm | American Falls, ID | 250.6 GWh |
#664 | Blackstone Wind Farm LLC | Ransom, IL | 250.1 GWh |
#665 | Crystal Lake 3 LLC | Britt, IA | 249.6 GWh |
#666 | Rising Tree Wind Farm | Mojave, CA | 249.0 GWh |
#667 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 248.2 GWh |
#668 | Golden Hills Wind | Livermore, CA | 247.4 GWh |
#669 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 247.4 GWh |
#670 | Coram Energy LLC (4.5MW) | Tehachapi, CA | 246.4 GWh |
#671 | Farmers City Wind LLC | Tarkio, MO | 246.4 GWh |
#672 | Klondike Windpower II | Wasco, OR | 245.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Smoky Hills Wind Project Phase I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beloit | Beloit, KS | 192.0 MWh | 40 mi |
Beloit Solar LLC | Beloit, KS | 4.6 GWh | 39.5 mi |
Cloud County Wind Farm | Concordia, KS | 328.0 GWh | 46.8 mi |
Ellinwood | Ellinwood, KS | 118.0 MWh | 42.9 mi |
Great Bend - Sunflower | Great Bend, KS | 51.9 GWh | 50.2 mi |
Hoisington | Hoisington, KS | 32.0 MWh | 41.7 mi |
Hutchinson Energy Center | Hutchinson, KS | 29.1 GWh | 56.7 mi |
Kansas Ethanol, LLC | Lyons, KS | 116.3 GWh | 41.1 mi |
Lincoln | Lincoln, KS | 22.0 MWh | 10.9 mi |
Lindsborg | Lindsborg, KS | 2.4 GWh | 32 mi |
McPherson 2 | McPherson, KS | 15.2 GWh | 44 mi |
McPherson 3 | McPherson, KS | 14.5 GWh | 45 mi |
Minneapolis City of | Minneapolis, KS | 99.0 MWh | 29.4 mi |
Osborne | Osborne, KS | 15.7 MWh | 48.1 mi |
Post Rock Wind Power Project, LLC | Ellsworth, KS | 390.1 GWh | 7.9 mi |
Russell Downtown | Russell, KS | 87.0 MWh | 37.5 mi |
Russell Energy Center | Russell, KS | 700.0 MWh | 36.6 mi |
Smoky Hills Wind Project Phase II | Lincoln, KS | 414.3 GWh | 1 mi |
Solomon-DS&O | Solomon, KS | 2.4 GWh | 42.5 mi |
Sterling | Sterling, KS | 32.0 MWh | 46.1 mi |