Wever Solar (150MW)
1538 330th Ave, Wever, IA 52628Plant Summary Information
Wever Solar (150MW) is ranked #2 out of 28 solar farms in Iowa in terms of total annual net electricity generation.
Wever Solar (150MW) generated 33.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Wever Solar (150MW) |
|---|---|
| Utility Name | Interstate Power and Light Co |
| Location | Lee County, IA |
| Initial Operation Date | November 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 260.5 GWh |
| Annual Consumption | 914.3 k MMBtu |
| Ranked #2,168 out of 12,613 Power Plants Nationwide | |
| Ranked #323 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #75 out of 281 Iowa Power Plants | |
| Ranked #2 out of 28 Iowa Solar Power Plants | |
| Fuel Types | Solar |
Map of Wever Solar (150MW)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wever Solar (150MW).
Monthly Net Generation for Wever Solar (150MW)
Monthly Plant Fuel Consumption for Wever Solar (150MW)
Wever Solar (150MW) Details
| Summary Information | |
|---|---|
| Plant Name | Wever Solar (150MW) (67538) |
| Plant Address | 1538 330th Ave, Wever, IA 52628 |
| Utility | Interstate Power and Light Co (9417) |
| Latitude, Longitude | 40.73456, -91.27675 |
| Generation Dates on File | Nov 2024 to Dec 2025 |
| Initial Operation Date | November 2024 |
| Annual Generation | 260.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | ITC Midwest LLC (56161) |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 182.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Wever Solar (150MW) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #313 | Maverick Solar 4, LLC | Desert Center, CA | 265.7 GWh |
| #314 | Elara Solar | Pearsall, TX | 265.6 GWh |
| #315 | Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh |
| #316 | Sunshine Valley Solar | Armagosa, NV | 264.1 GWh |
| #317 | Antelope Expansion 2 | Lancaster, CA | 263.8 GWh |
| #318 | Wild Springs | New Underwood, SD | 263.7 GWh |
| #319 | Catalina Solar LLC | Rosamond, CA | 262.2 GWh |
| #320 | CA Flats Solar 130, LLC | Shandon, CA | 261.8 GWh |
| #321 | Quartz Solar, LLC | Wynne, AR | 261.0 GWh |
| #322 | Milford Solar 1 | Milford, UT | 260.7 GWh |
| #324 | Hunter Solar LLC (UT) | Clawson, UT | 259.6 GWh |
| #325 | West Line Solar, LLC | City of Eloy, AZ | 258.6 GWh |
| #326 | Quinto Solar PV Project | Gustine, CA | 257.0 GWh |
| #327 | Emerald Grove | Crane, TX | 256.3 GWh |
| #328 | Oak Solar | Gaston, NC | 256.0 GWh |
| #329 | Onion River | Sheboygan Cedar Grove, WI | 255.7 GWh |
| #330 | Bellflower Solar 1 | Lewisville, IN | 255.7 GWh |
| #331 | SR Snipesville III | Denton, GA | 255.5 GWh |
| #332 | Playa Solar 2 | North Las Vegas, NV | 255.1 GWh |
| #333 | East Line Solar | Coolidge, AZ | 254.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wever Solar (150MW).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bloomfield | Bloomfield, IA | 16.0 MWh | 60.2 mi |
| Burlington (IA) | Burlington, IA | 16.3 GWh | 8.4 mi |
| Bushnell | Bushnell, IL | 49.0 MWh | 42 mi |
| Cardinal Point Wind | Sciota, IL | 510.3 GWh | 29.3 mi |
| Earp Solar, LLC | Monmouth, IL | 75.8 GWh | 33.6 mi |
| Galesburg Solar Array | Oquawka, IL | 2.5 GWh | 21.4 mi |
| Johnson County Hills Solar | Iowa City, IA | 5.6 GWh | 59.5 mi |
| Kahoka | Kahoka, MO | 5.0 MWh | 31.7 mi |
| Keokuk | Keokuk, IA | 888.3 GWh | 23.9 mi |
| Louisa | Muscatine, IA | 4.5 TWh | 41.4 mi |
| McDonough Solar 1, LLC CSG | Blandinsville, IL | 3.8 GWh | 25.5 mi |
| Mt Pleasant | Mt Pleasant, IA | 33.0 MWh | 21.8 mi |
| Muscatine Plant #1 | Muscatine, IA | 748.1 GWh | 46.8 mi |
| NLMU Wind | New London, IA | 4.3 GWh | 16.4 mi |
| Pleasantville Solar Park | Ipava, IL | 27.7 GWh | 55.4 mi |
| Roquette America | Keokuk, IA | 207.4 GWh | 24.6 mi |
| Sullivan B Community Solar LLC | Macomb, IL | 3.2 GWh | 38 mi |
| Wapello Solar LLC | Wapello, IA | 206.3 GWh | 29.4 mi |
| West Liberty | West Liberty, IA | 38.0 MWh | 57.7 mi |
| Wilton | Wilton, IA | 9.0 MWh | 60.4 mi |