Wever Solar (150MW)
1538 330th Ave, Wever, IA 52628Plant Summary Information
Wever Solar (150MW) is ranked #2 out of 28 solar farms in Iowa in terms of total annual net electricity generation.
Wever Solar (150MW) generated 44.4 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Wever Solar (150MW) |
|---|---|
| Utility Name | Interstate Power and Light Co |
| Location | Lee County, IA |
| Initial Operation Date | November 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 265.1 GWh |
| Annual Consumption | 967.8 k MMBtu |
| Ranked #2,152 out of 12,637 Power Plants Nationwide | |
| Ranked #318 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #74 out of 281 Iowa Power Plants | |
| Ranked #2 out of 28 Iowa Solar Power Plants | |
| Fuel Types | Solar |
Map of Wever Solar (150MW)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wever Solar (150MW).
Monthly Net Generation for Wever Solar (150MW)
Monthly Plant Fuel Consumption for Wever Solar (150MW)
Wever Solar (150MW) Details
| Summary Information | |
|---|---|
| Plant Name | Wever Solar (150MW) (67538) |
| Plant Address | 1538 330th Ave, Wever, IA 52628 |
| Utility | Interstate Power and Light Co (9417) |
| Latitude, Longitude | 40.73456, -91.27675 |
| Generation Dates on File | Nov 2024 to Feb 2026 |
| Initial Operation Date | November 2024 |
| Annual Generation | 265.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | ITC Midwest LLC (56161) |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 182.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Wever Solar (150MW) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #308 | Maverick Solar 6, LLC | Desert Center, CA | 269.3 GWh |
| #309 | Pleasant Creek Unit 2 | Palo, IA | 273.0 GWh |
| #310 | Kiowa County Solar Project, LLC | Snyder, OK | 272.8 GWh |
| #311 | Boulder Solar Power, LLC | Boulder City, NV | 272.4 GWh |
| #312 | Rancho Seco Solar II, LLC | Twin Cities, CA | 271.2 GWh |
| #313 | Wilmot Energy Center LLC | Tucson, AZ | 268.1 GWh |
| #314 | Prairie Ronde Solar Farm | Opelousas, LA | 268.9 GWh |
| #315 | Dougherty County Solar, LLC | Albany, GA | 268.3 GWh |
| #316 | Central Line Solar, LLC | Coolidge, AZ | 267.2 GWh |
| #317 | Panoche Valley Solar Farm | Paicines, CA | 266.7 GWh |
| #319 | Elara Solar | Pearsall, TX | 264.8 GWh |
| #320 | Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh |
| #321 | Wild Springs | New Underwood, SD | 264.0 GWh |
| #322 | Resurgence Solar | Boron, CA | 250.8 GWh |
| #323 | CA Flats Solar 130, LLC | Shandon, CA | 263.0 GWh |
| #324 | Catalina Solar LLC | Rosamond, CA | 262.2 GWh |
| #325 | Sunshine Valley Solar | Armagosa, NV | 260.3 GWh |
| #326 | Hornshadow Solar II, LLC | Castle Dale, UT | 260.0 GWh |
| #327 | Milford Solar 1 | Milford, UT | 259.9 GWh |
| #328 | Speedway Solar, LLC | Morrison Town, IN | 258.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wever Solar (150MW).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bloomfield | Bloomfield, IA | 16.0 MWh | 60.2 mi |
| Burlington (IA) | Burlington, IA | 21.0 GWh | 8.4 mi |
| Bushnell | Bushnell, IL | 49.0 MWh | 42 mi |
| Cardinal Point Wind | Sciota, IL | 514.1 GWh | 29.3 mi |
| Earp Solar, LLC | Monmouth, IL | 75.9 GWh | 33.6 mi |
| Galesburg Solar Array | Oquawka, IL | 2.5 GWh | 21.4 mi |
| Johnson County Hills Solar | Iowa City, IA | 5.6 GWh | 59.5 mi |
| Kahoka | Kahoka, MO | 5.0 MWh | 31.7 mi |
| Keokuk | Keokuk, IA | 888.3 GWh | 23.9 mi |
| Louisa | Muscatine, IA | 4.6 TWh | 41.4 mi |
| McDonough Solar 1, LLC CSG | Blandinsville, IL | 3.8 GWh | 25.5 mi |
| Mt Pleasant | Mt Pleasant, IA | 33.0 MWh | 21.8 mi |
| Muscatine Plant #1 | Muscatine, IA | 774.6 GWh | 46.8 mi |
| NLMU Wind | New London, IA | 4.3 GWh | 16.4 mi |
| Pleasantville Solar Park | Ipava, IL | 66.6 GWh | 55.4 mi |
| Roquette America | Keokuk, IA | 236.3 GWh | 24.6 mi |
| Sullivan B Community Solar LLC | Macomb, IL | 3.2 GWh | 38 mi |
| Wapello Solar LLC | Wapello, IA | 203.5 GWh | 29.4 mi |
| West Liberty | West Liberty, IA | 38.0 MWh | 57.7 mi |
| Wilton | Wilton, IA | 9.0 MWh | 60.4 mi |