San Juan Solar I
Central Consolidated Schools, Kirtland, NM 87417Plant Summary Information
San Juan Solar I is ranked #34 out of 138 power plants in New Mexico in terms of total annual net electricity generation.
San Juan Solar I generated 118.2 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | San Juan Solar I |
---|---|
Utility Name | San Juan Solar I, LLC |
Location | San Juan County, NM |
Initial Operation Date | October 2024 |
Last Update | May 2025 |
Annual Generation | 225.2 GWh |
Annual Consumption | 811.4 k MMBtu |
Ranked #2,274 out of 12,312 Power Plants Nationwide | |
Ranked #285 out of 6,191 Solar Power Plants Nationwide | |
Ranked #34 out of 138 New Mexico Power Plants | |
Ranked #6 out of 84 New Mexico Solar Power Plants | |
Fuel Types | Solar |
Map of San Juan Solar I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for San Juan Solar I.
Monthly Net Generation for San Juan Solar I
San Juan Solar I Details
Summary Information | |
---|---|
Plant Name | San Juan Solar I (66574) |
Plant Address | Central Consolidated Schools, Kirtland, NM 87417 |
Utility | San Juan Solar I, LLC (65626) |
Latitude, Longitude | 36.84253, -108.35136 |
Generation Dates on File | Oct 2024 to May 2025 |
Initial Operation Date | October 2024 |
Annual Generation | 225.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of New Mexico (PNM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator SJSS Details Operating October 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 561.4 |
---|---|
Maximum Charge Rate | 50 MW |
Maximum Discharge Rate | 50 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 45.8 |
Storage Enclosure Type | CS |
Arbitrage | P |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator SANS Details Operating November 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 249.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
San Juan Solar I Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#275 | Robins Air Force Base Solar | Macon, GA | 242.9 GWh |
#276 | SR Snipesville II | Denton, GA | 242.1 GWh |
#277 | Oak Solar | Gaston, NC | 241.8 GWh |
#278 | Oak Trail Solar, LLC | Moyock, NC | 241.8 GWh |
#279 | Galloway 2 Solar Farm | Paint Rock, TX | 241.7 GWh |
#280 | Honeysuckle Solar Farm | New Carlisle, IN | 241.6 GWh |
#281 | Ivanpah 3 | Nipton, CA | 250.6 GWh |
#282 | Greasewood Solar | Fort Stockton, TX | 239.0 GWh |
#283 | San Pablo Raceway | Lancaster, CA | 238.6 GWh |
#284 | Alamo 6 | Fort Stockton, TX | 238.3 GWh |
#286 | Agave | Arlington, AZ | 236.2 GWh |
#287 | RE Mustang LLC | Lemoore, CA | 220.6 GWh |
#288 | East Pecos Solar | McCamey, TX | 232.4 GWh |
#289 | SR Clay, LLC | Fort Gaines, GA | 231.1 GWh |
#290 | Delilah Solar Energy LLC | Bogota, TX | 230.9 GWh |
#291 | Lockhart Solar PV, LLC | Hinkley, CA | 230.6 GWh |
#292 | SR Lumpkin | Lumpkin, GA | 230.3 GWh |
#293 | Assembly Solar II LLC | Lennon, MI | 230.2 GWh |
#294 | Comanche Solar | Pueblo, CO | 229.9 GWh |
#295 | Franklin Solar Hybrid | Twin Falls, ID | 229.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding San Juan Solar I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ames Hydro | Ophir, CO | 6.6 GWh | 75.2 mi |
Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 691.6 GWh | 74.5 mi |
Bluffview | Farmington, NM | 377.8 GWh | 11.5 mi |
City of Gallup Solar | Gallup, NM | 9.0 GWh | 94.3 mi |
Cortez Solar 1, LLC | Cortez, CO | 5.4 GWh | 37.1 mi |
Cortez Solar 2, LLC | Cortez, CO | 9.5 GWh | 39.8 mi |
Cortez Solar 3, LLC | Cortez, CO | 4.5 GWh | 34.3 mi |
Cuba 2.5ac, LLC | Cuba, NM | 5.9 GWh | 96.7 mi |
Four Corners | Fruitland, NM | 7.4 TWh | 12.8 mi |
Jicarilla Solar 1 LLC | Dulce, NM | 93.9 GWh | 69.8 mi |
Jicarilla Solar 2 | Dulce, NM | 121.1 GWh | 81.5 mi |
Latigo Wind Park | Monticello, UT | 150.4 GWh | 91.2 mi |
LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.6 GWh | 33.4 mi |
McPhee | Cortez, CO | 6.1 GWh | 52.1 mi |
Navajo Dam | Farmington, NM | 72.0 GWh | 40.9 mi |
Red Mesa Solar Project | Red Mesa, UT | 193.3 GWh | 61.6 mi |
Tacoma | Durango, CO | 957.0 MWh | 56.5 mi |
Towaoc | Cortez, CO | 9.8 GWh | 42.4 mi |
Vallecito Hydroelectric | Bayfield, CO | 19.1 GWh | 56.4 mi |
Williams Ignacio Natural Gas Plant | Durango, CO | 47.3 GWh | 37.6 mi |