Jicarilla Solar 2
405 Indian Rte J36, Dulce, NM 87528Plant Summary Information
Jicarilla Solar 2 is ranked #48 out of 138 power plants in New Mexico in terms of total annual net electricity generation.
Jicarilla Solar 2 generated 30.3 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Jicarilla Solar 2 |
|---|---|
| Utility Name | Repsol Renewables NA |
| Location | Rio Arriba County, NM |
| Initial Operation Date | April 2022 |
| Last Update | Mar 2026 |
| Annual Generation | 131.2 GWh |
| Annual Consumption | 485.3 k MMBtu |
| Ranked #3,123 out of 12,332 Power Plants Nationwide | |
| Ranked #735 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #48 out of 138 New Mexico Power Plants | |
| Ranked #16 out of 86 New Mexico Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Jicarilla Solar 2 LLC (2021 to 2023) Repsol Renewables NA (2024 to 2024) |
Map of Jicarilla Solar 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jicarilla Solar 2.
Monthly Net Generation for Jicarilla Solar 2
Monthly Plant Fuel Consumption for Jicarilla Solar 2
Jicarilla Solar 2 Details
| Summary Information | |
|---|---|
| Plant Name | Jicarilla Solar 2 (65103) |
| Plant Address | 405 Indian Rte J36, Dulce, NM 87528 |
| Utility | Repsol Renewables NA (65265) |
| Latitude, Longitude | 36.14105, -107.17123 |
| Generation Dates on File | Mar 2022 to Mar 2026 |
| Initial Operation Date | April 2022 |
| Annual Generation | 131.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of New Mexico (PNM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator JICS2 Details Operating April 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 62.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Jicarilla Solar 2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #725 | Stoneridge Solar, LLC | Thorndale, TX | 133.2 GWh |
| #726 | Blue Cypress Solar Energy Center | Vero Beach, FL | 133.1 GWh |
| #727 | Paddock Solar | Beloit, WI | 132.9 GWh |
| #728 | Camino Solar Hybrid | Rosamond, CA | 132.8 GWh |
| #729 | Rutherford Farm | Forest City, NC | 132.8 GWh |
| #730 | Wheatridge Hybrid | Morrow, OR | 654.8 GWh |
| #731 | Interstate Solar Energy Center | Ft. Pierce, FL | 132.4 GWh |
| #732 | North Star Solar | Mendota, CA | 132.4 GWh |
| #733 | First City Solar Energy Center | McDavid, FL | 131.5 GWh |
| #734 | Azalea Springs Solar Park | Lufkin, TX | 131.3 GWh |
| #736 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 131.2 GWh |
| #737 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 129.9 GWh |
| #738 | Desper Solar | Louisa, VA | 129.6 GWh |
| #739 | Anhinga Solar Energy Center | Green Cove Springs, FL | 129.5 GWh |
| #740 | Granite Mountain Solar West, LLC | Cedar City, UT | 129.4 GWh |
| #741 | Crawfish River | Jefferson, WI | 129.1 GWh |
| #742 | Foxglove Solar | Middletown, VA | 129.1 GWh |
| #743 | Sweetbay Solar Center | North of Indiantown, FL | 129.0 GWh |
| #744 | Blevins Solar & Storage | TX | 124.0 GWh |
| #745 | Hecate Energy Beacon Solar 1 | Cantil, CA | 128.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jicarilla Solar 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Abiquiu Dam | Abiquiu, NM | 24.3 GWh | 42.3 mi |
| Alcalde Solar Array | Alcalde, NM | 5.6 GWh | 63.2 mi |
| Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 685.4 GWh | 24.9 mi |
| Atrisco Solar LLC | Rio Rancho, NM | 732.6 GWh | 68 mi |
| Cibola | Seboyeta, NM | 19.2 GWh | 65.1 mi |
| City of Rio Rancho WWTP | Rio Rancho, NM | 2.7 GWh | 69.5 mi |
| Cuba 2.5ac, LLC | Cuba, NM | 5.9 GWh | 15.2 mi |
| Encino Solar Energy Center | Rio Rancho Estates, NM | 140.3 GWh | 57.1 mi |
| Jicarilla Solar 1 LLC | Dulce, NM | 116.9 GWh | 13.5 mi |
| Los Alamos PV Site | Los Alamos, NM | 447.0 MWh | 51.5 mi |
| Navajo Dam | Farmington, NM | 72.0 GWh | 52.1 mi |
| NMRD Data Center III, LLC | Rio Ranchero, NM | 133.3 GWh | 56.1 mi |
| Quail Ranch Solar and BESS | Rio Rancho, NM | 87.9 GWh | 67.4 mi |
| Red Mesa Wind LLC | Seboyeta, NM | 162.1 GWh | 61.4 mi |
| Rio Rancho High School | Rio Rancho, NM | 2.2 GWh | 66.8 mi |
| Sandoval Solar Energy Center | Rio Rancho, NM | 15.6 GWh | 62.6 mi |
| Shallow Basket | Dulce, NM | 230.1 GWh | 10.9 mi |
| Sue Cleveland High School | Rio Rancho, NM | 2.3 GWh | 64 mi |
| Syncarpha El Rito | El Rito, NM | 3.5 GWh | 56.2 mi |
| TAG | Rio Rancho, NM | 176.5 GWh | 62.5 mi |