TVA Southaven Combined Cycle
2882 Stateline Rd, Southaven, MS 38671Plant Summary Information
TVA Southaven Combined Cycle is ranked #4 out of 54 power plants in Mississippi in terms of total annual net electricity generation.
TVA Southaven Combined Cycle is comprised of 6 generators and generated 1.4 TWh during the 3-month period between December 2025 to March 2026.
| Plant Name | TVA Southaven Combined Cycle |
|---|---|
| Utility Name | Tennessee Valley Authority |
| Location | DeSoto County, MS |
| Initial Operation Date | May 2003 |
| Last Update | Mar 2026 |
| Annual Generation | 5.2 TWh |
| Annual Consumption | 39.1 M MMBtu |
| Ranked #209 out of 12,332 Power Plants Nationwide | |
| Ranked #94 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #4 out of 54 Mississippi Power Plants | |
| Ranked #3 out of 28 Mississippi Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of TVA Southaven Combined Cycle
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TVA Southaven Combined Cycle.
Monthly Net Generation for TVA Southaven Combined Cycle
Monthly Plant Fuel Consumption for TVA Southaven Combined Cycle
TVA Southaven Combined Cycle Details
| Summary Information | |
|---|---|
| Plant Name | TVA Southaven Combined Cycle (55269) |
| Plant Address | 2882 Stateline Rd, Southaven, MS 38671 |
| Utility | Tennessee Valley Authority (18642) |
| Latitude, Longitude | 34.9939, -90.0378 |
| Generation Dates on File | Mar 2003 to Mar 2026 |
| Initial Operation Date | May 2003 |
| Annual Generation | 5.2 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 00-31-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Wells |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name | Other - Please explain in pipeline notes below. |
| Pipeline Notes | Texal Gas Transmission, LLC |
| Natural Gas Storage | No |
Generator CTG1 Details Operating May 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | SCC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 179.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157 MW |
| Winter Capacity | 187 MW |
| Minimum Load | 129.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CTG2 Details Operating May 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | SCC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 179.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157 MW |
| Winter Capacity | 187 MW |
| Minimum Load | 129.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CTG3 Details Operating May 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | SCC3 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 179.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157 MW |
| Winter Capacity | 187 MW |
| Minimum Load | 129.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator STG1 Details Operating May 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | SCC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 103 MW |
| Winter Capacity | 110 MW |
| Minimum Load | 75.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG2 Details Operating May 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | SCC2 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 103 MW |
| Winter Capacity | 110 MW |
| Minimum Load | 75.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG3 Details Operating May 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | SCC3 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 103 MW |
| Winter Capacity | 110 MW |
| Minimum Load | 75.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
TVA Southaven Combined Cycle Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Tennessee Valley Authority | WT 4B-K 400 W Summit Hill Drive, Knoxville, TN 37902 | Generator STG3 | 10.00% |
| Southaven Power LLC | 2882 Stateline Rd, Southaven, MS 38671 | Generator STG3 | 90.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #84 | Carroll County Energy | Carrollton, OH | 5.5 TWh |
| #85 | Waterford Power, LLC | Waterford, OH | 5.5 TWh |
| #86 | Cane Run | Louisville, KY | 5.5 TWh |
| #87 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.6 TWh |
| #88 | Doswell Energy Center | Ashland, VA | 5.5 TWh |
| #89 | St Joseph Energy Center | New Carlisle, IN | 5.4 TWh |
| #90 | Guadalupe Generating Station | Marion, TX | 5.3 TWh |
| #91 | Red Hawk | Arlington, AZ | 5.2 TWh |
| #92 | Belews Creek | Belews Creek, NC | 7.6 TWh |
| #93 | Jack County | Bridgeport, TX | 5.2 TWh |
| #95 | Central Alabama Generating Station | Billingsley, AL | 5.1 TWh |
| #96 | Hamilton Liberty | Towanda, PA | 5.1 TWh |
| #97 | Kiamichi Energy Facility | Kiowa, OK | 5.1 TWh |
| #98 | TalenEnergy Montour | Washingtonville, PA | 5.1 TWh |
| #99 | Batesville Generation Facility | Batesville, MS | 5.1 TWh |
| #100 | Tenaska Virginia Generating Station | Scottsville, VA | 5.1 TWh |
| #101 | Channel Energy Center LLC | Pasadena, TX | 5.1 TWh |
| #102 | Wolf Hollow II | Granbury, TX | 5.1 TWh |
| #103 | Brandy Branch | Baldwin, FL | 5.0 TWh |
| #104 | Fayette Energy Facility | Masontown, PA | 5.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TVA Southaven Combined Cycle.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allen | Memphis, TN | 5.8 TWh | 8.4 mi |
| Big Cypress Solar, LLC | Crawfordsville, AR | 429.0 GWh | 28.6 mi |
| Crossover Wind | Wynne, AR | 331.0 GWh | 43.7 mi |
| Delta Wind Farm (MS) | Dundee, MS | 510.9 GWh | 41.5 mi |
| Driver Solar | Osceola, AR | 343.3 GWh | 44.8 mi |
| Forrest City- Eldridge Road | Forrest City, AR | 2.0 GWh | 43.6 mi |
| Forrest City- Prison Site | Forrest City, AR | 1.8 GWh | 43.5 mi |
| IKEA Memphis 508 | Cordova, TN | 934.0 MWh | 19.1 mi |
| Millington Solar Farm | Millington, TN | 94.0 GWh | 26.8 mi |
| Quartz Solar, LLC | Wynne, AR | 297.5 GWh | 45.1 mi |
| Rivercrest SD | Wilson, AR | 2.2 GWh | 43.3 mi |
| Somerville Solar | Somerville, TN | 3.2 GWh | 42 mi |
| Sr Byhalia, LLC | Byhalia, MS | 10.1 GWh | 23 mi |
| SR Canadaville, LLC | Collierville, TN | 36.1 GWh | 25.9 mi |
| SR Innovation - NIKE PV | Memphis, TN | 3.4 GWh | 21.6 mi |
| SR Panola II, LLC | Batesville, MS | 3.9 GWh | 45.7 mi |
| West Memphis Solar Station | Crawfordsville, AR | 335.5 GWh | 19.1 mi |
| Wildberry | Moscow, TN | 24.5 GWh | 38.1 mi |
| Wildflower Solar, LLC (MS) | DeSoto, MS | 196.1 GWh | 8.6 mi |
| Woodruff Electric Cooperative | Forrest City, AR | 2.2 GWh | 44.7 mi |