Noble Solar
9630 Doyle Rd, Krum, TX 76249Plant Summary Information
Noble Solar is ranked #27 out of 5,173 solar farms nationwide in terms of total annual net electricity generation.
Noble Solar generated 129.3 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Noble Solar |
---|---|
Utility Name | BT Noble Solar, LLC |
Location | Denton County, TX |
Initial Operation Date | September 2022 |
Last Update | Feb 2024 |
Annual Generation | 616.2 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,149 out of 11,455 Power Plants Nationwide | |
Ranked #27 out of 5,173 Solar Power Plants Nationwide | |
Ranked #194 out of 726 Texas Power Plants | |
Ranked #8 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Noble Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Noble Solar.
Monthly Net Generation for Noble Solar
Noble Solar Details
Summary Information | |
---|---|
Plant Name | Noble Solar (65271) |
Plant Address | 9630 Doyle Rd Krum, TX 76249 |
Utility | BT Noble Solar, LLC (64568) |
Latitude, Longitude | 33.26151, -97.23806 |
Generation Dates on File | Sep 2022 to Feb 2024 |
Initial Operation Date | September 2022 |
Annual Generation | 616.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator NBSTG Details Operating October 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 125 |
---|---|
Maximum Charge Rate | 125 MW |
Maximum Discharge Rate | 125 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 41.2 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Frequency Regulation | Yes |
Ramping Spinning Reserve | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
Generator NBSLR Details Operating September 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 275 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 275 MW |
Winter Capacity | 275 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 353.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Noble Solar Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#17 | Silver State Solar Power South | Primm Valley, NV | 682.3 GWh |
#18 | Mount Signal Solar Farm V | Calexico, CA | 671.5 GWh |
#19 | Arrow Canyon Solar Hybrid | Moapa, NV | 663.1 GWh |
#20 | Stateline Solar | Nipton, CA | 649.1 GWh |
#21 | Copper Mountain Solar 3 | Boulder City, NV | 636.0 GWh |
#22 | Genesis Solar Energy Project | Blythe, CA | 633.2 GWh |
#23 | Mojave Solar Project | Hinkley, CA | 631.7 GWh |
#24 | Blythe Mesa Solar II | Blythe, CA | 615.3 GWh |
#25 | Moapa Southern Paiute | Moapa, NV | 625.4 GWh |
#26 | IP Radian, LLC | Brookesmith, TX | 621.7 GWh |
#28 | AV Solar Ranch One | Lancaster, CA | 607.0 GWh |
#29 | Slate Hybrid | Stratford, CA | 574.4 GWh |
#30 | Galloway 1 Solar Farm | Paint Rock, TX | 593.8 GWh |
#31 | SE Athos II, LLC | Desert Center, CA | 590.5 GWh |
#32 | Sun Valley Solar Project | Abbott, TX | 588.6 GWh |
#33 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 587.5 GWh |
#34 | Aktina Solar | El Campo, TX | 587.2 GWh |
#35 | Azure Sky Solar | Haskell, TX | 578.6 GWh |
#36 | Bighorn Solar 1 | Pueblo, CO | 584.0 GWh |
#37 | Taygete Energy Project LLC | Coyanosa, TX | 570.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Noble Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BT Cooke Solar, LLC | Gainsville, TX | 132.6 GWh | 20.2 mi |
CoServ Community Solar Station | Aubrey, TX | 2.3 GWh | 15 mi |
Denton Energy Center | Denton, TX | 319.8 GWh | 3.6 mi |
DFW Gas Recovery | Lewsiville, TX | 81.8 GWh | 23.1 mi |
Farmers Branch Renewable Energy Facility | Lewisville, TX | 25.0 GWh | 22.7 mi |
North Gainesville Solar | Gainesville, TX | 9.8 GWh | 27.7 mi |
Spencer | Denton, TX | 23.3 GWh | 8.8 mi |
State Farm Insur Support Center Central | Irving, TX | 13.0 MWh | 27.7 mi |
Toyota HQ Plan | Plano, TX | 11.8 GWh | 26 mi |
Verizon Hidden Ridge Solar Project | Irving, TX | 3.0 MWh | 31.3 mi |
WAL202 | Frisco, TX | 80.0 MWh | 27.6 mi |
WAL266 | Grapevine, TX | 259.0 MWh | 25.1 mi |
WAL2883 | Plano, TX | 250.0 MWh | 27.8 mi |
WAL2980 | Fort Worth, TX | 337.7 MWh | 25.5 mi |
WAL3777 | Frisco, TX | 169.5 MWh | 21.2 mi |
WAL5080 | Hurst, TX | 332.0 MWh | 28.7 mi |
WAL5311 | Mckinney, TX | 252.3 MWh | 29.2 mi |
WAL5316 | Saginaw, TX | 320.8 MWh | 27.6 mi |
WAL5764 | Fort Worth, TX | 273.2 MWh | 22.7 mi |
Wildcat Creek Wind Farm LLC | Gainesville, TX | 606.9 GWh | 20.6 mi |