Faraday Solar
7474 S 18150 W, Fairfield, UT 84013Plant Summary Information
Faraday Solar is ranked #9 out of 7,015 solar farms nationwide in terms of total annual net electricity generation.
Faraday Solar generated 350.8 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Faraday Solar |
|---|---|
| Utility Name | Faraday Solar B LLC |
| Location | Utah County, UT |
| Initial Operation Date | September 2025 |
| Last Update | May 2026 |
| Annual Generation | 1.0 TWh |
| Annual Consumption | 3.5 M MMBtu |
| Ranked #733 out of 13,081 Power Plants Nationwide | |
| Ranked #9 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #7 out of 120 Utah Power Plants | |
| Ranked #1 out of 56 Utah Solar Power Plants | |
| Fuel Types | Solar |
Map of Faraday Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Faraday Solar.
Monthly Net Generation for Faraday Solar
Monthly Plant Fuel Consumption for Faraday Solar
Faraday Solar Details
| Summary Information | |
|---|---|
| Plant Name | Faraday Solar (69748) |
| Plant Address | 7474 S 18150 W, Fairfield, UT 84013 |
| Utility | Faraday Solar B LLC (67640) |
| Latitude, Longitude | 40.0936, -112.0833 |
| Generation Dates on File | Jun 2025 to May 2026 |
| Initial Operation Date | September 2025 |
| Annual Generation | 1.0 TWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG24-24-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator FARPV Details Operating September 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 525 MW |
| Summer Capacity | 525 MW |
| Winter Capacity | 525 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 682.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Faraday Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Gemini Solar Hybrid | Unincorporated, NV | 2.1 TWh |
| #2 | Hornet Solar (TX) | Tulia, TX | 1.6 TWh |
| #3 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #4 | Fox Squirrel Solar | Mt Sterling, OH | 1.2 TWh |
| #5 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #6 | Roseland Solar Project, LLC | Riesel, TX | 1.1 TWh |
| #7 | Aktina Solar | El Campo, TX | 1.1 TWh |
| #8 | Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh |
| #10 | 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh |
| #11 | Hecate Energy Outpost Solar LLC | Laredo, TX | 979.9 GWh |
| #12 | Mockingbird Solar Center | Brookston, TX | 970.1 GWh |
| #13 | Topaz Solar Farm | Santa Margarita, CA | 967.4 GWh |
| #14 | Double Back Diamond | Virden, IL | 961.4 GWh |
| #15 | Danish Fields Solar, LLC | El Campo, TX | 926.2 GWh |
| #16 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 907.0 GWh |
| #17 | Harquahala 2 | Tonopah, AZ | 850.8 GWh |
| #18 | Old 300 Solar Center, LLC | Needville, TX | 888.4 GWh |
| #19 | Solar Star 1 | Rosamond, CA | 886.6 GWh |
| #20 | Box Canyon (AZ) | Florence, AZ | 872.3 GWh |
| #21 | Desert Quartzite | Blythe, CA | 855.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Faraday Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bartholomew | Springville, UT | 1.6 GWh | 31.3 mi |
| BYU Central Heating Plant | Provo, UT | 115.9 GWh | 25.4 mi |
| Clover Creek Solar Community Solar | Mona, UT | 197.9 GWh | 20.3 mi |
| Copperton Solar Plant No. 1 | Bingham Canyon, UT | 7.3 GWh | 33.4 mi |
| Currant Creek | Mona, UT | 2.6 TWh | 21.3 mi |
| Deer Creek (UT) | Heber, UT | 22.2 GWh | 36.3 mi |
| Granite | Salt lake City, UT | 4.2 GWh | 39.6 mi |
| Lake Side Power Plant | Vineyard, UT | 6.3 TWh | 23.9 mi |
| Little Cottonwood | Sandy, UT | 8.6 GWh | 37.1 mi |
| Nebo Power Station | Payson, UT | 622.1 GWh | 18.8 mi |
| Payson | Payson, UT | 6.0 MWh | 18.8 mi |
| Provo Power Plant | Provo, UT | 4.4 GWh | 24.5 mi |
| Snowbird Power Plant | Snowbird, UT | 14.6 GWh | 40.7 mi |
| Spanish Fork | Spanish Fork, UT | 14.5 GWh | 25.3 mi |
| Spanish Fork Community Solar | Spanish Fork, UT | 7.4 GWh | 23.9 mi |
| Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 43.1 GWh | 26.5 mi |
| Stairs | Salt Lake City, UT | 4.1 GWh | 40.5 mi |
| Trans-Jordan Generating Station | South Jordan, UT | 35.2 GWh | 31.6 mi |
| West Valley Generation Project | West Valley City, UT | 383.2 GWh | 39.7 mi |
| Whitehead | Springville, UT | 11.4 GWh | 25.2 mi |