South Plains Wind Phase I
1700 State Highway 207, Floydada, TX 79241Plant Summary Information
South Plains Wind Phase I is ranked #74 out of 224 wind farms in Texas in terms of total annual net electricity generation.
South Plains Wind Phase I generated 141.4 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | South Plains Wind Phase I |
|---|---|
| Utility Name | Evergreen Wind, LLC |
| Location | Floyd County, TX |
| Initial Operation Date | November 2015 |
| Last Update | Sep 2025 |
| Annual Generation | 668.2 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #1,049 out of 12,539 Power Plants Nationwide | |
| Ranked #227 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #196 out of 799 Texas Power Plants | |
| Ranked #74 out of 224 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
First Wind O&M, LLC (2013 to 2019) Evergreen Wind, LLC (2020 to 2024) |
Map of South Plains Wind Phase I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for South Plains Wind Phase I.
Monthly Net Generation for South Plains Wind Phase I
South Plains Wind Phase I Details
| Summary Information | |
|---|---|
| Plant Name | South Plains Wind Phase I (59384) |
| Plant Address | 1700 State Highway 207, Floydada, TX 79241 |
| Utility | Evergreen Wind, LLC (59155) |
| Latitude, Longitude | 34.08056, -101.32361 |
| Generation Dates on File | Dec 2015 to Sep 2025 |
| Initial Operation Date | November 2015 |
| Annual Generation | 668.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Sharyland Utilities LP (17008) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 1 Details Operating November 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 100 |
| Turbine Details | |
| Number Of Turbines | 100 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V100-2.0 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
South Plains Wind Phase I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #217 | Wildcat Wind Farm I, LLC | Elwood, IN | 673.8 GWh |
| #218 | Streator Cayuga Ridge South | Odell, IL | 673.4 GWh |
| #219 | Bearkat | St. Lawrence, TX | 673.1 GWh |
| #220 | Griffin Trail Wind | E Seymour, TX | 672.9 GWh |
| #221 | Windy Flats Wind Project | Centerville, WA | 671.6 GWh |
| #222 | Cedar Point Wind | Limon, CO | 671.2 GWh |
| #223 | Seiling Wind I | Seiling, OK | 669.0 GWh |
| #224 | California Ridge Wind Energy LLC | Fithian, IL | 668.6 GWh |
| #225 | Ledyard Windpower, LLC | Lakota, IA | 668.2 GWh |
| #226 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 668.2 GWh |
| #228 | Broadview Energy JN, LLC | Texico, NM | 665.7 GWh |
| #229 | Chickasaw Wind Farm | New Hampton, IA | 660.3 GWh |
| #230 | Brazos Wind Farm | Fluvanna, TX | 658.7 GWh |
| #231 | Minonk Wind Farm | Minonk, IL | 651.1 GWh |
| #232 | Wildcat Ranch Wind Project | Morton, TX | 649.0 GWh |
| #233 | Aragonne Wind LLC | Santa Rosa, NM | 645.5 GWh |
| #234 | Sweetwater Wind 4 LLC | Roscoe, TX | 644.6 GWh |
| #235 | Reading Wind Project | Reading, KS | 644.1 GWh |
| #236 | Sugar Creek Wind One LLC | TBD, IL | 642.8 GWh |
| #237 | Meadow Lake Wind Farm VI LLC | Remington, IN | 639.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding South Plains Wind Phase I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Station | Abernathy, TX | 267.1 GWh | 33.3 mi |
| BESSP1, LLC. | Shallowater, TX | 9.5 GWh | 45.7 mi |
| Briscoe Wind Farm | Silverton, TX | 451.1 GWh | 24.8 mi |
| Cotton Plains Wind Farm | Floydada, TX | 186.6 GWh | 7.9 mi |
| Elk Station | Abernathy, TX | 1.3 TWh | 33.3 mi |
| Hale Community Wind Farm | Plainview, TX | 1.9 TWh | 26.2 mi |
| Hart Wind | Hart, TX | 140.9 GWh | 46.5 mi |
| Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh | 27.4 mi |
| Hornet Solar (TX) | Tulia, TX | 911.5 GWh | 46.4 mi |
| Jones | Lubbock, TX | 2.7 TWh | 45.3 mi |
| Longhorn Wind | Silverton, TX | 725.3 GWh | 16.5 mi |
| Lorenzo Wind | Lorenzo, TX | 334.1 GWh | 28.8 mi |
| McAdoo Wind Energy LLC | McAdoo, TX | 363.6 GWh | 30.5 mi |
| Old Settler Wind | Floydada, TX | 539.5 GWh | 7.9 mi |
| Pleasant Hill Wind Energy Project | Lorenzo, TX | 39.9 GWh | 25.4 mi |
| Ralls Wind Farm | Ralls, TX | 10.6 GWh | 29.2 mi |
| South Plains II | Lockney, TX | 945.8 GWh | 8.7 mi |
| Ty Cooke | Lubbock, TX | 3.7 GWh | 47 mi |
| Wake Wind Energy Center | Floydada, TX | 883.8 GWh | 21.8 mi |
| Whirlwind Energy Center | Floydada, TX | 101.5 GWh | 13 mi |