TX Hereford Wind
4501 FM 1259, Hereford, TX 88116Plant Summary Information
TX Hereford Wind is ranked #95 out of 228 wind farms in Texas in terms of total annual net electricity generation.
TX Hereford Wind generated 168.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | TX Hereford Wind |
|---|---|
| Utility Name | Boralex US Operations LLC |
| Location | Deaf Smith County, TX |
| Initial Operation Date | December 2014 |
| Last Update | May 2026 |
| Annual Generation | 587.2 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #1,161 out of 13,081 Power Plants Nationwide | |
| Ranked #285 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #225 out of 852 Texas Power Plants | |
| Ranked #95 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2023) Boralex US Operations LLC (2024 to 2025) |
Map of TX Hereford Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TX Hereford Wind.
Monthly Net Generation for TX Hereford Wind
Monthly Plant Fuel Consumption for TX Hereford Wind
TX Hereford Wind Details
| Summary Information | |
|---|---|
| Plant Name | TX Hereford Wind (58773) |
| Plant Address | 4501 FM 1259, Hereford, TX 88116 |
| Utility | Boralex US Operations LLC (66100) |
| Latitude, Longitude | 34.74806, -102.17444 |
| Generation Dates on File | Jan 2015 to May 2026 |
| Initial Operation Date | December 2014 |
| Annual Generation | 587.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Sharyland Utilities LP (17008) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating December 2014
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 87 |
| Turbine Details | |
| Number Of Turbines | 87 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.85-82.5 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
TX Hereford Wind Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Boralex US Wind TNM LLC | c/o Corporate Service Company, 251 Little Falls Drive, Wilmington, DE 19808 | 50.00% |
| Axium Great Plains Wind, LLC | 527 Madison Avenue, 21st Floor,, New York, NY 10022 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #275 | Wild Horse | Ellensburg, WA | 603.3 GWh |
| #276 | Ledyard Windpower, LLC | Lakota, IA | 602.6 GWh |
| #277 | Raymond Wind Farm, LLC | Lyford, TX | 599.5 GWh |
| #278 | Logans Gap Wind LLC | Comanche, TX | 599.2 GWh |
| #279 | King Creek Wind Farm 1, LLC | Throckmorton, TX | 597.5 GWh |
| #280 | Dakota Range III Wind Project | Summit, SD | 594.1 GWh |
| #281 | Caney River Wind Project | Howard, KS | 593.7 GWh |
| #282 | Indiana Crossroads Wind Farm II | Wolcott, IN | 593.3 GWh |
| #283 | Langford Wind Power | Christoval, TX | 589.1 GWh |
| #284 | Pilot Hill Wind Farm | Herscher, IL | 588.6 GWh |
| #286 | Foxtail Wind, LLC | Forbes, ND | 587.0 GWh |
| #287 | Boiling Springs Wind Farm | Woodward, OK | 586.6 GWh |
| #288 | Alta Farms II Wind Project, LLC | Clinton, IL | 584.0 GWh |
| #289 | FPL Energy Ashtabula Wind LLC | Luverne, ND | 583.0 GWh |
| #290 | North Hurlburt Wind LLC | Arlington, OR | 581.3 GWh |
| #291 | Panorama Wind, LLC | Grover, CO | 581.0 GWh |
| #292 | Reloj del Sol Wind Farm | San Ygnacio, TX | 580.4 GWh |
| #293 | Chevelon Butte Wind Farm | Winslow, AZ | 579.2 GWh |
| #294 | Jumbo Hill Wind Project | Andrews, TX | 579.1 GWh |
| #295 | Rattlesnake Power, LLC | Brady, TX | 578.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TX Hereford Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Astra Wind Farm | Happy, TX | 529.4 GWh | 7.1 mi |
| Bethel Wind Farm LLC | Dimmitt, TX | 1.1 TWh | 20.8 mi |
| Canadian Breaks, LLC | Vega, TX | 792.9 GWh | 32.2 mi |
| Golden Spread Panhandle Wnd Rch | Wilderado, TX | 196.8 GWh | 34.3 mi |
| Grady Wind Energy Center, LLC | Clovis, NM | 861.4 GWh | 52.1 mi |
| Harrington | Amarillo, TX | 2.2 TWh | 45 mi |
| Hart Wind | Hart, TX | 704.4 GWh | 26.4 mi |
| Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh | 40.5 mi |
| Hornet Solar (TX) | Tulia, TX | 1.6 TWh | 21.5 mi |
| Mariah del Norte | Friona, TX | 840.8 GWh | 23.6 mi |
| Nichols | Amarillo, TX | 1.7 TWh | 44.2 mi |
| Plant X | Earth, TX | 815.7 GWh | 42.4 mi |
| Plant X Solar | Earth, TX | 79.1 GWh | 42.3 mi |
| Spinning Spur Wind II | Adrian, TX | 381.2 GWh | 46.5 mi |
| Spinning Spur Wind III | Adrian, TX | 718.6 GWh | 48.8 mi |
| Spinning Spur Wind LLC | Vegas, TX | 347.0 GWh | 33.9 mi |
| Tolk | Muleshoe, TX | 3.1 TWh | 44.9 mi |
| TX Jumbo Road Wind | Hereford, TX | 545.7 GWh | 4.9 mi |
| UL Advanced Wind Turbine Test Facility | Canyon, TX | 12.0 GWh | 26.8 mi |
| Wildorado Wind LLC | Vega, TX | 672.5 GWh | 38.3 mi |