Pavant Solar, LLC
1325 W 8900 N, Fillmore, UT 84631Plant Summary Information
Pavant Solar, LLC is ranked #48 out of 121 power plants in Utah in terms of total annual net electricity generation.
Pavant Solar, LLC generated 36.5 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Pavant Solar, LLC |
|---|---|
| Utility Name | Onward Energy |
| Location | Millard County, UT |
| Initial Operation Date | December 2015 |
| Last Update | Aug 2026 |
| Annual Generation | 112.1 GWh |
| Annual Consumption | 423.2 k MMBtu |
| Ranked #3,445 out of 13,301 Power Plants Nationwide | |
| Ranked #927 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #48 out of 121 Utah Power Plants | |
| Ranked #28 out of 57 Utah Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Dominion Renewable Energy (2014 to 2020) Onward Energy (2021 to 2025) |
Map of Pavant Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pavant Solar, LLC.
Monthly Net Generation for Pavant Solar, LLC
Monthly Plant Fuel Consumption for Pavant Solar, LLC
Pavant Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Pavant Solar, LLC (59702) |
| Plant Address | 1325 W 8900 N, Fillmore, UT 84631 |
| Utility | Onward Energy (60453) |
| Latitude, Longitude | 38.96052, -112.36327 |
| Generation Dates on File | Dec 2015 to Aug 2026 |
| Initial Operation Date | December 2015 |
| Annual Generation | 112.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 15-479-001 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG15-115-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 46.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 45 |
| DC Net Capacity | 62.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Pavant Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #917 | Hecate Energy Beacon Solar 3 | Cantil, CA | 114.6 GWh |
| #918 | Marion County Solar Project | Marion, OH | 114.5 GWh |
| #919 | Antelope DSR 1 | Lancaster, CA | 114.3 GWh |
| #920 | Alpine Solar | Lancaster, CA | 114.1 GWh |
| #921 | Hawtree Solar | Warrenton, NC | 113.8 GWh |
| #922 | BT Cooke Solar, LLC | Gainsville, TX | 113.7 GWh |
| #923 | Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 111.6 GWh |
| #924 | Walker Springs I | Gainestown, AL | 113.1 GWh |
| #925 | Silver State Solar Power North | Primm, NV | 113.0 GWh |
| #926 | Hecate Energy Beacon Solar 4 | Cantil, CA | 112.4 GWh |
| #928 | Kellam Solar | Ben Wheeler, TX | 110.2 GWh |
| #929 | Swamp Cabbage | LaBelle, FL | 109.8 GWh |
| #930 | Renegade Solar Energy LLC | Rock, MI | 109.7 GWh |
| #931 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 109.4 GWh |
| #932 | Sumrall II Solar Farm | Sumrall, MS | 109.0 GWh |
| #933 | Broad River Solar, LLC | Mooresboro, NC | 108.9 GWh |
| #934 | BT Signal Ranch | Quinlan, TX | 108.9 GWh |
| #935 | Ranchland Solar, LLC | Moyock, NC | 108.8 GWh |
| #936 | Envoy Solar, LLC | Mexico, MO | 108.5 GWh |
| #937 | Vancourt Solar Interconnections | La Feria, TX | 107.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pavant Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blundell | Milford, UT | 271.2 GWh | 41.9 mi |
| Cove Fort | Cove Fort, UT | 142.1 GWh | 30 mi |
| Escalante Solar I, LLC | Milford, UT | 210.8 GWh | 47.1 mi |
| Escalante Solar II, LLC | Milford, UT | 204.9 GWh | 48 mi |
| Escalante Solar III, LLC | Milford, UT | 202.0 GWh | 46.4 mi |
| Granite Peak Solar Plant | Milford, UT | 6.1 GWh | 51.2 mi |
| Greenville Solar Plant | Milford, UT | 3.3 GWh | 52.7 mi |
| Gunnison Solar | Gunnison, UT | 3.8 GWh | 33.4 mi |
| Hydro Plant No 3 | east of Ephraim, UT | 1.5 GWh | 57.7 mi |
| Intermountain Power Project | Delta, UT | 5.5 TWh | 39.7 mi |
| Manti Lower | Manti, UT | 1.1 GWh | 44.7 mi |
| Milford 2 | Milford, UT | 6.9 GWh | 52.1 mi |
| Milford Solar 1 | Milford, UT | 250.7 GWh | 48 mi |
| Milford Wind Corridor I LLC | Milford, UT | 373.9 GWh | 42.6 mi |
| Milford Wind Corridor Stage II LLC | Milford, UT | 166.3 GWh | 40.1 mi |
| Pavant Solar II LLC | Fillmore, UT | 85.9 GWh | 14 mi |
| Pavant Solar III | Filmore, UT | 44.2 GWh | 13.4 mi |
| Sigurd Solar LLC | Sigurd, UT | 209.8 GWh | 20.7 mi |
| Smithfield 1 | Milford, UT | 12.8 GWh | 52.2 mi |
| Upper Beaver | Beaver, UT | 8.1 GWh | 48.2 mi |