Harquahala Generating Project
2530 North 491 Ave, Tonopah, AZ 85354Plant Summary Information
Harquahala Generating Project is ranked #9 out of 177 power plants in Arizona in terms of total annual net electricity generation.
Harquahala Generating Project is comprised of 6 generators and generated 698.8 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Harquahala Generating Project |
|---|---|
| Utility Name | New Harquahala Generating Co, LLC |
| Location | Maricopa County, AZ |
| Initial Operation Date | June 2004 |
| Last Update | Jun 2026 |
| Annual Generation | 3.1 TWh |
| Annual Consumption | 25.2 M MMBtu |
| Ranked #373 out of 13,094 Power Plants Nationwide | |
| Ranked #215 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #9 out of 177 Arizona Power Plants | |
| Ranked #7 out of 35 Arizona Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Harquahala Generating Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harquahala Generating Project.
Monthly Net Generation for Harquahala Generating Project
Monthly Plant Fuel Consumption for Harquahala Generating Project
Harquahala Generating Project Details
| Summary Information | |
|---|---|
| Plant Name | Harquahala Generating Project (55372) |
| Plant Address | 2530 North 491 Ave, Tonopah, AZ 85354 |
| Utility | New Harquahala Generating Co, LLC (32790) |
| Latitude, Longitude | 33.47596, -113.11343 |
| Generation Dates on File | Sep 2004 to Jun 2026 |
| Initial Operation Date | June 2004 |
| Annual Generation | 3.1 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 01-81-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Salt River Project (SRP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Central Arizona Project/Well |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 525.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | EL PASO NATURAL GAS COMPANY LLC |
| Natural Gas Storage | No |
Generator CTG1 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | BLK1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 281.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 239.9 MW |
| Winter Capacity | 244 MW |
| Minimum Load | 135.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Ultrasupercritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | BLK1 |
| Ownership | Jointly Owned |
| Duct Burners | No |
| Nameplate Capacity | 144 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 119.8 MW |
| Winter Capacity | 121.8 MW |
| Minimum Load | 88.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Pulverized Coal Technology | No |
| Ultrasupercritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CTG3 Details Operating August 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | BLK3 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 281.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 226.2 MW |
| Winter Capacity | 245.2 MW |
| Minimum Load | 135.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Ultrasupercritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG3 Details Operating August 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | BLK3 |
| Ownership | Jointly Owned |
| Duct Burners | No |
| Nameplate Capacity | 144 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 115.5 MW |
| Winter Capacity | 120.4 MW |
| Minimum Load | 87.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Pulverized Coal Technology | No |
| Ultrasupercritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CTG2 Details Operating September 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | BLK2 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 281.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 226.6 MW |
| Winter Capacity | 247.8 MW |
| Minimum Load | 137.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Ultrasupercritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG2 Details Operating September 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | BLK2 |
| Ownership | Jointly Owned |
| Duct Burners | No |
| Nameplate Capacity | 144 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 114.9 MW |
| Winter Capacity | 121.1 MW |
| Minimum Load | 85.9 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Ultrasupercritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
Harquahala Generating Project Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Capital Power Corporation | 1200-10423 101 Street NW, Edmonton, AB T5H 0E9 | Generator CTG1 | 50.00% |
| BlackRock Inc. | 40 East 52nd St., New York, NY 10022 | Generator CTG1 | 50.00% |
| Capital Power Corporation | 1200-10423 101 Street NW, Edmonton, AB T5H 0E9 | Generator CTG2 | 50.00% |
| BlackRock Inc. | 40 East 52nd St., New York, NY 10022 | Generator CTG2 | 50.00% |
| Capital Power Corporation | 1200-10423 101 Street NW, Edmonton, AB T5H 0E9 | Generator CTG3 | 50.00% |
| BlackRock Inc. | 40 East 52nd St., New York, NY 10022 | Generator CTG3 | 50.00% |
| Capital Power Corporation | 1200-10423 101 Street NW, Edmonton, AB T5H 0E9 | Generator STG1 | 50.00% |
| BlackRock Inc. | 40 East 52nd St., New York, NY 10022 | Generator STG1 | 50.00% |
| Capital Power Corporation | 1200-10423 101 Street NW, Edmonton, AB T5H 0E9 | Generator STG2 | 50.00% |
| BlackRock Inc. | 40 East 52nd St., New York, NY 10022 | Generator STG2 | 50.00% |
| Capital Power Corporation | 1200-10423 101 Street NW, Edmonton, AB T5H 0E9 | Generator STG3 | 50.00% |
| BlackRock Inc. | 40 East 52nd St., New York, NY 10022 | Generator STG3 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #205 | Red Oak Power LLC | Sayreville, NJ | 3.2 TWh |
| #206 | Intermountain Power Project | Delta, UT | 4.9 TWh |
| #207 | Polk | Mulberry, FL | 3.2 TWh |
| #208 | Rocky Mountain Energy Center | Keenesburg, CO | 3.2 TWh |
| #209 | Wildcat Point Generation Facility | Conowingo, MD | 3.2 TWh |
| #210 | Arlington Valley Energy Facility | Arlington, AZ | 3.2 TWh |
| #211 | Bergen Generating Station | Ridgefield, NJ | 3.2 TWh |
| #212 | High Bridge | St. Paul, MN | 3.2 TWh |
| #213 | Rhode Island State Energy Center | Johnston, RI | 3.1 TWh |
| #214 | Pastoria Energy Facility, LLC | Lebec, CA | 3.1 TWh |
| #216 | Gila River Power Block 3 | Gila Bend, AZ | 3.1 TWh |
| #217 | Marshall (NC) | Terrell, NC | 7.7 TWh |
| #218 | R D Morrow | Purvis, MS | 3.1 TWh |
| #219 | Birdsboro Power | Birdsboro, PA | 3.1 TWh |
| #220 | Wolf Hollow I LP | Granbury, TX | 3.1 TWh |
| #221 | Quail Run Energy Center | Odessa, TX | 3.1 TWh |
| #222 | Cosumnes Power Plant | Herald, CA | 3.1 TWh |
| #223 | Northeastern | Oologah, OK | 4.0 TWh |
| #224 | Ingleside Cogeneration | Houston, TX | 3.1 TWh |
| #225 | Harry Allen | Las Vegas, NV | 3.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harquahala Generating Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agave | Arlington, AZ | 303.6 GWh | 19 mi |
| Arlington Valley Energy Facility | Arlington, AZ | 3.2 TWh | 15.9 mi |
| Arlington Valley Solar Energy I | Arlington, AZ | 106.2 GWh | 17.1 mi |
| Arlington Valley Solar Energy II | Arlington, AZ | 336.0 GWh | 20 mi |
| Badger 1 | Tonopah, AZ | 29.6 GWh | 17.4 mi |
| Harquahala 2 | Tonopah, AZ | 845.1 GWh | 1.1 mi |
| Harquahala Sun Solar Project | Tonopah, AZ | 464.4 GWh | 2.7 mi |
| Mesquite Generating Station Block 1 | Arlington, AZ | 3.0 TWh | 17 mi |
| Mesquite Generating Station Block 2 | Arlington, AZ | 3.8 TWh | 17 mi |
| Mesquite Solar 1 | Tonopah, AZ | 392.2 GWh | 15.2 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 253.7 GWh | 15.3 mi |
| Mesquite Solar 3, LLC | Tonopah, AZ | 443.8 GWh | 13.5 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 140.8 GWh | 15.2 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 124.9 GWh | 15.3 mi |
| Palo Verde | Wintersburg, AZ | 31.2 TWh | 15.7 mi |
| Papago PV | Tonopah, AZ | 123.5 GWh | 4.2 mi |
| Red Hawk | Arlington, AZ | 5.1 TWh | 18.5 mi |
| Saddle Mountain Solar I | Tonopah, AZ | 33.3 GWh | 7.8 mi |
| Sun Pond | Tonopah, AZ | 70.0 GWh | 18.1 mi |
| Sun Streams, LLC | Arlington, AZ | 369.0 GWh | 18.3 mi |