TAI Huntsville Solar Hybrid
1 Cottonvalley Drive NW, Huntsville, AL 35810Plant Summary Information
TAI Huntsville Solar Hybrid is ranked #6 out of 11 solar farms in Alabama in terms of total annual net electricity generation.
TAI Huntsville Solar Hybrid generated 17.8 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | TAI Huntsville Solar Hybrid |
|---|---|
| Utility Name | TAI Huntsville Solar, LLC |
| Location | Madison County, AL |
| Initial Operation Date | July 2024 |
| Last Update | Oct 2025 |
| Annual Generation | 62.0 GWh |
| Annual Consumption | 232.4 k MMBtu |
| Ranked #3,873 out of 12,553 Power Plants Nationwide | |
| Ranked #937 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #61 out of 74 Alabama Power Plants | |
| Ranked #6 out of 11 Alabama Solar Power Plants | |
| Fuel Types | Solar |
Map of TAI Huntsville Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TAI Huntsville Solar Hybrid.
Monthly Net Generation for TAI Huntsville Solar Hybrid
TAI Huntsville Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | TAI Huntsville Solar Hybrid (67488) |
| Plant Address | 1 Cottonvalley Drive NW, Huntsville, AL 35810 |
| Utility | TAI Huntsville Solar, LLC (66218) |
| Latitude, Longitude | 34.82955, -86.63035 |
| Generation Dates on File | Jul 2024 to Oct 2025 |
| Initial Operation Date | July 2024 |
| Annual Generation | 62.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF 23-895-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Huntsville - (AL) (9094) AL |
| Grid Voltage | 46.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating July 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 32.4 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 32.4 MW |
| Winter Capacity | 32.4 MW |
| Minimum Load | 32.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 39.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
TAI Huntsville Solar Hybrid Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #927 | Waiawa Solar Power Hybrid | Waipahu, HI | 58.2 GWh |
| #928 | Hayhurst Texas Solar | Orla, TX | 64.0 GWh |
| #929 | Lake Placid Solar Power Plant | Lake Placid, FL | 63.5 GWh |
| #930 | Hayhurst New Mexico Solar | Malaga, NM | 63.5 GWh |
| #931 | Pawpaw Solar Plant | Butler, GA | 63.2 GWh |
| #932 | Innovative Solar 43, LLC | Ivanhoe, NC | 63.1 GWh |
| #933 | Bakeoven Solar | Maupin, OR | 62.9 GWh |
| #934 | AES Waikoloa Solar Hybrid | Waikoloa Village, HI | 60.8 GWh |
| #935 | Avra Valley Solar | Marana, AZ | 62.5 GWh |
| #936 | Solar Borrego I | Borrego Springs, CA | 62.2 GWh |
| #938 | Oberon IB | Odessa, TX | 62.0 GWh |
| #939 | Innovative Solar 67 | Willard, NC | 61.9 GWh |
| #940 | Gulf Coast Solar Center I | Valparaiso, FL | 60.9 GWh |
| #941 | Cuyama Solar, LLC | Cuyama, CA | 60.8 GWh |
| #942 | EE Waianae Solar Project | Waianae, HI | 60.6 GWh |
| #943 | Jones Farm Solar | Millington, MD | 59.4 GWh |
| #944 | Bison Solar LLC | Wellington, CO | 59.1 GWh |
| #945 | Milagro Solar I | Santa Teresa, NM | 58.5 GWh |
| #946 | RE Garland A | Rosamond, CA | 58.2 GWh |
| #947 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 55.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TAI Huntsville Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Browns Ferry | Decatur, AL | 29.6 TWh | 29.1 mi |
| Chattooga Gore | Menlo, GA | 5.4 GWh | 70.9 mi |
| Colbert | Tuscumbia, AL | 320.6 GWh | 69.4 mi |
| Cumblerland Land Holdings, LLC | Elkmont, AL | 27.2 GWh | 15.8 mi |
| Decatur Energy Center | Decatur, AL | 3.7 TWh | 26.2 mi |
| Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 9.6 GWh | 30.3 mi |
| Elora Solar | Elora, TN | 315.2 GWh | 22.9 mi |
| Guntersville | Guntersville, AL | 454.8 GWh | 31.2 mi |
| Lewis Smith Dam | Jasper, AL | 219.0 GWh | 67.2 mi |
| Morgan Energy Center | Decatur, AL | 4.7 TWh | 27.9 mi |
| MTSU Power Co-Gen Plant | Murfreesboro, TN | 39.5 GWh | 72.2 mi |
| Nickajack | New Hope, TN | 491.2 GWh | 58.4 mi |
| Redstone Arsenal Hybrid | Huntsville, AL | 16.9 GWh | 15.1 mi |
| River Bend Solar, LLC (AL) | Florence, AL | 149.7 GWh | 68.7 mi |
| Sand Valley Power Station | Collinsville, AL | 27.2 GWh | 54.9 mi |
| SR Bell Buckle | Shelbyville, TN | 68.6 GWh | 52.1 mi |
| Tims Ford | Winchester, TN | 37.3 GWh | 32.3 mi |
| Weiss Dam | Leesburg, AL | 184.0 GWh | 67.5 mi |
| Wheeler Dam | Town Creek, AL | 1.2 TWh | 42.7 mi |
| Wilson Dam | Muscle Shoals, AL | 2.4 TWh | 56.5 mi |