TAI Huntsville Solar Hybrid
1 Cottonvalley Drive NW, Huntsville, AL 35810Plant Summary Information
TAI Huntsville Solar Hybrid is ranked #6 out of 13 solar farms in Alabama in terms of total annual net electricity generation.
TAI Huntsville Solar Hybrid generated 13.3 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | TAI Huntsville Solar Hybrid |
|---|---|
| Utility Name | TAI Huntsville Solar, LLC |
| Location | Madison County, AL |
| Initial Operation Date | July 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 62.0 GWh |
| Annual Consumption | 233.0 k MMBtu |
| Ranked #3,912 out of 12,332 Power Plants Nationwide | |
| Ranked #993 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #61 out of 76 Alabama Power Plants | |
| Ranked #6 out of 13 Alabama Solar Power Plants | |
| Fuel Types | Solar |
Map of TAI Huntsville Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TAI Huntsville Solar Hybrid.
Monthly Net Generation for TAI Huntsville Solar Hybrid
Monthly Plant Fuel Consumption for TAI Huntsville Solar Hybrid
TAI Huntsville Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | TAI Huntsville Solar Hybrid (67488) |
| Plant Address | 1 Cottonvalley Drive NW, Huntsville, AL 35810 |
| Utility | TAI Huntsville Solar, LLC (66218) |
| Latitude, Longitude | 34.82955, -86.63035 |
| Generation Dates on File | Jul 2024 to Mar 2026 |
| Initial Operation Date | July 2024 |
| Annual Generation | 62.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF 23-895-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Huntsville - (AL) (9094) AL |
| Grid Voltage | 46.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating July 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 32.4 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 32.4 MW |
| Winter Capacity | 32.4 MW |
| Minimum Load | 32.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 39.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
TAI Huntsville Solar Hybrid Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #983 | Avalon Solar | Pima, AZ | 64.6 GWh |
| #984 | Innovative Solar 43, LLC | Ivanhoe, NC | 64.5 GWh |
| #985 | Hayhurst Texas Solar | Orla, TX | 64.0 GWh |
| #986 | Dry Bridge Solar (Brown University) | North Kingstown, RI | 63.9 GWh |
| #987 | Hayhurst New Mexico Solar | Malaga, NM | 63.5 GWh |
| #988 | San Luis Valley Solar Ranch | Mosca, CO | 63.4 GWh |
| #989 | Pawpaw Solar Plant | Butler, GA | 63.2 GWh |
| #990 | Little Bear Solar 1, LLC | Mendota, CA | 62.6 GWh |
| #991 | Avra Valley Solar | Marana, AZ | 62.5 GWh |
| #992 | Solar Borrego I | Borrego Springs, CA | 62.2 GWh |
| #994 | Gulf Coast Solar Center I | Valparaiso, FL | 61.4 GWh |
| #995 | Innovative Solar 67 | Willard, NC | 61.0 GWh |
| #996 | AES Waikoloa Solar Hybrid | Waikoloa Village, HI | 59.3 GWh |
| #997 | Wildwood Solar Plant | Tutwiler, MS | 60.0 GWh |
| #998 | Edwards Sanborn E3 | Mojave, CA | 57.0 GWh |
| #999 | SR Lambert II | Georgetown, SC | 59.2 GWh |
| #1000 | Bison Solar LLC | Wellington, CO | 58.6 GWh |
| #1001 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 56.1 GWh |
| #1002 | RE Garland A | Rosamond, CA | 58.2 GWh |
| #1003 | SR Lambert I, LLC | Georgetown, SC | 58.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TAI Huntsville Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Browns Ferry | Decatur, AL | 30.4 TWh | 29.1 mi |
| Chattooga Gore | Menlo, GA | 5.4 GWh | 70.9 mi |
| Colbert | Tuscumbia, AL | 320.6 GWh | 69.4 mi |
| Cumblerland Land Holdings, LLC | Elkmont, AL | 27.2 GWh | 15.8 mi |
| Decatur Energy Center | Decatur, AL | 3.1 TWh | 26.2 mi |
| Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 9.6 GWh | 30.3 mi |
| Elora Solar | Elora, TN | 318.8 GWh | 22.9 mi |
| Guntersville | Guntersville, AL | 454.8 GWh | 31.2 mi |
| Lewis Smith Dam | Jasper, AL | 219.0 GWh | 67.2 mi |
| Morgan Energy Center | Decatur, AL | 4.5 TWh | 27.9 mi |
| MTSU Power Co-Gen Plant | Murfreesboro, TN | 34.1 GWh | 72.2 mi |
| Nickajack | New Hope, TN | 491.2 GWh | 58.4 mi |
| Redstone Arsenal Hybrid | Huntsville, AL | 16.9 GWh | 15.1 mi |
| River Bend Solar, LLC (AL) | Florence, AL | 150.8 GWh | 68.7 mi |
| Sand Valley Power Station | Collinsville, AL | 27.2 GWh | 54.9 mi |
| SR Bell Buckle | Shelbyville, TN | 68.8 GWh | 52.1 mi |
| Tims Ford | Winchester, TN | 37.3 GWh | 32.3 mi |
| Weiss Dam | Leesburg, AL | 184.0 GWh | 67.5 mi |
| Wheeler Dam | Town Creek, AL | 1.2 TWh | 42.7 mi |
| Wilson Dam | Muscle Shoals, AL | 2.1 TWh | 56.5 mi |