Crossing Trails Wind Power Project LLC.
TBD, Seibert, CO 80834Plant Summary Information
Crossing Trails Wind Power Project LLC. is ranked #39 out of 283 power plants in Colorado in terms of total annual net electricity generation.
Crossing Trails Wind Power Project LLC. generated 95.4 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Crossing Trails Wind Power Project LLC. |
---|---|
Utility Name | EDP Renewables North America LLC |
Location | Kit Carson County, CO |
Initial Operation Date | April 2021 |
Last Update | Apr 2025 |
Annual Generation | 408.2 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,510 out of 12,299 Power Plants Nationwide | |
Ranked #438 out of 1,353 Wind Power Plants Nationwide | |
Ranked #39 out of 283 Colorado Power Plants | |
Ranked #20 out of 34 Colorado Wind Power Plants | |
Fuel Types | Wind |
Map of Crossing Trails Wind Power Project LLC.
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Crossing Trails Wind Power Project LLC..
Monthly Net Generation for Crossing Trails Wind Power Project LLC.
Crossing Trails Wind Power Project LLC. Details
Summary Information | |
---|---|
Plant Name | Crossing Trails Wind Power Project LLC. (62489) |
Plant Address | TBD, Seibert, CO 80834 |
Utility | EDP Renewables North America LLC (61785) |
Latitude, Longitude | 39.04662, -102.82238 |
Generation Dates on File | Jan 2021 to Apr 2025 |
Initial Operation Date | April 2021 |
Annual Generation | 408.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tri-State G & T Assn, Inc (30151) |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating April 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 104 MW |
Summer Capacity | 104 MW |
Winter Capacity | 104 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 25 |
Turbine Details | |
Number Of Turbines | 25 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V150-4.2 |
Design Wind Speed | 20.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 344.4 |
Crossing Trails Wind Power Project LLC. Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#428 | Cottonwood Wind Energy Center | Blue Hill, NE | 417.9 GWh |
#429 | Post Oak Wind LLC | Abilene, TX | 416.9 GWh |
#430 | Leaning Juniper Wind Power II | Arlington, OR | 416.6 GWh |
#431 | Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh |
#432 | Smoky Hills Wind Project Phase II | Lincoln, KS | 414.3 GWh |
#433 | Senate Wind LLC | Bryson, TX | 413.7 GWh |
#434 | Morning Light Wind Farm | Adair, IA | 413.3 GWh |
#435 | Glass Sands Wind Facility | Sulphur, OK | 412.1 GWh |
#436 | Keechi Wind | Jacksboro, TX | 411.9 GWh |
#437 | Osceola Windpower LLC | Harris, IA | 410.1 GWh |
#439 | Prairie Rose Wind Farm | Hardwick, MN | 408.2 GWh |
#440 | Camp Grove Wind Farm | Wyoming, IL | 406.4 GWh |
#441 | Lost Creek Wind Energy Facility | King City, MO | 404.1 GWh |
#442 | Panther Creek Wind Farm II | Big Spring, TX | 402.1 GWh |
#443 | New Frontier Wind | Ruso, ND | 401.6 GWh |
#444 | Rattlesnake Flat | Ritzville, WA | 401.0 GWh |
#445 | Voyager Wind I | Mojave, CA | 400.9 GWh |
#446 | Quilt Block Wind Farm LLC | Darlington, WI | 400.9 GWh |
#447 | Glenrock | Glenrock, WY | 400.8 GWh |
#448 | Skookumchuck Wind Facility | Rainier, WA | 400.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Crossing Trails Wind Power Project LLC..
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bronco Plains Wind II, LLC | Kit Carson, CO | 702.7 GWh | 12.4 mi |
Bronco Plains Wind, LLC | Flagler, CO | 1.1 TWh | 11.3 mi |
Burlington (CO) | Burlington, CO | 6.0 GWh | 37.7 mi |
Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh | 40 mi |
Cedar Point Wind | Limon, CO | 676.5 GWh | 52.6 mi |
Cheyenne Ridge Wind Farm | Cheyenne Wells, CO | 1.7 TWh | 32.9 mi |
Golden West Power Partners LLC | Calhan, CO | 839.3 GWh | 75 mi |
Grazing Yak Solar | Calhan, CO | 83.7 GWh | 76.9 mi |
Holly | Holly, CO | 3.0 MWh | 80.9 mi |
Kit Carson Windpower | Burlington, CO | 168.5 GWh | 32.2 mi |
Lamar Plant | Lamar, CO | 12.6 GWh | 71.7 mi |
Limon Generating Station | Limon, CO | 216.3 GWh | 48.3 mi |
Limon III Wind LLC | Limon, CO | 689.6 GWh | 40.8 mi |
Limon Wind I | Limon, CO | 581.0 GWh | 46.4 mi |
Limon Wind II | Limon, CO | 486.0 GWh | 45.4 mi |
NSE Camber BH CSG 2, LLC | Ordway, CO | 3.9 GWh | 76.4 mi |
Rush Creek Wind | Matheson, CO | 2.2 TWh | 55.5 mi |
St Francis | St Francis, KS | 19.6 MWh | 73.6 mi |
Titan Solar | Deer Trail, CO | 94.8 GWh | 77.5 mi |
Twin Buttes II Wind | Lamar, CO | 299.3 GWh | 89.3 mi |