| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Toledo Air National Guard | 180th Fighter Wing | Swanton, OH | PJM Interconnection, LLC (PJM) | 296.0 MWh | Dec 2009 | Dec 2025 | Solar |
| AEUG Union Solar, LLC | Acciona Energy USA Global, LLC | West Mansfield, OH | PJM Interconnection, LLC (PJM) | 664.8 GWh | Oct 2024 | May 2026 | Solar |
| IGS CMH4, LLC | Altus Power America Management, LLC | Madison, OH | PJM Interconnection, LLC (PJM) | 6.4 GWh | Jun 2023 | Dec 2025 | Solar |
| IGS PCW1 | Altus Power America Management, LLC | Rossford, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Jun 2023 | Dec 2025 | Solar |
| IGS AKC1 | Altus Power America Management, LLC | Akron, OH | PJM Interconnection, LLC (PJM) | 4.4 GWh | Jun 2023 | Dec 2025 | Solar |
| Jackson Cntr Peaking | American Mun Power-Ohio, Inc | Jackson Center, OH | PJM Interconnection, LLC (PJM) | 98.0 MWh | May 1999 | Dec 2025 | Distillate Fuel Oil |
| Edgerton | American Mun Power-Ohio, Inc | Edgerton, OH | PJM Interconnection, LLC (PJM) | 182.0 MWh | Jul 2000 | Dec 2025 | Distillate Fuel Oil |
| Shelby North | American Mun Power-Ohio, Inc | Shelby, OH | PJM Interconnection, LLC (PJM) | 66.0 MWh | May 2000 | Dec 2025 | Distillate Fuel Oil |
| Montpelier | American Mun Power-Ohio, Inc | Montpelier, OH | PJM Interconnection, LLC (PJM) | 466.0 MWh | Jun 2000 | Dec 2025 | Distillate Fuel Oil |
| Bowling Green Peaking | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 2.3 GWh | May 2000 | Dec 2025 | Natural Gas |
| Hamilton Peaking | American Mun Power-Ohio, Inc | Hamilton, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2000 | Dec 2025 | Natural Gas |
| Galion | American Mun Power-Ohio, Inc | Galion, OH | PJM Interconnection, LLC (PJM) | 262.0 MWh | Jun 2001 | Dec 2025 | Distillate Fuel Oil |
| Orrville Peaking | American Mun Power-Ohio, Inc | Orrville, OH | PJM Interconnection, LLC (PJM) | 271.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Dover Peaking | American Mun Power-Ohio, Inc | Dover, OH | PJM Interconnection, LLC (PJM) | 547.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Napoleon Peaking | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 242.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Versailles Peaking | American Mun Power-Ohio, Inc | Versailles, OH | PJM Interconnection, LLC (PJM) | 288.0 MWh | May 1999 | Dec 2025 | Distillate Fuel Oil |
| Cleveland Peaking | American Mun Power-Ohio, Inc | Cleveland, OH | PJM Interconnection, LLC (PJM) | 547.0 MWh | Jun 2000 | Dec 2025 | Distillate Fuel Oil |
| Wellington | American Mun Power-Ohio, Inc | Wellington, OH | PJM Interconnection, LLC (PJM) | 46.0 MWh | Jan 1998 | Dec 2025 | Distillate Fuel Oil |
| Bryan Peaking | American Mun Power-Ohio, Inc | Bryan, OH | PJM Interconnection, LLC (PJM) | 597.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Seville | American Mun Power-Ohio, Inc | Seville, OH | PJM Interconnection, LLC (PJM) | 260.0 MWh | May 2001 | Dec 2025 | Distillate Fuel Oil |
| Bowling Green Generating Station | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 2.8 GWh | May 2000 | Dec 2025 | Natural Gas |
| Galion Generating Station | American Mun Power-Ohio, Inc | Galion, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | May 2000 | Dec 2025 | Natural Gas |
| Napoleon Peaking Station | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 2.6 GWh | May 2000 | Dec 2025 | Natural Gas |
| Monroeville RTO BTM | American Mun Power-Ohio, Inc | Monroeville, OH | PJM Interconnection, LLC (PJM) | 124.0 MWh | Mar 2020 | Dec 2025 | Distillate Fuel Oil |
| Niles RTO BTM | American Mun Power-Ohio, Inc | Niles, OH | PJM Interconnection, LLC (PJM) | 283.0 MWh | Jan 2020 | Dec 2025 | Distillate Fuel Oil |
| Woodville RTO BTM | American Mun Power-Ohio, Inc | Woodville, OH | PJM Interconnection, LLC (PJM) | 130.0 MWh | Sep 2020 | Dec 2025 | Distillate Fuel Oil |
| Fremont Energy Center | American Mun Power-Ohio, Inc | Fremont, OH | PJM Interconnection, LLC (PJM) | 4.2 TWh | Dec 2011 | May 2026 | Natural Gas |
| Wadsworth IPS RTO BTM | American Mun Power-Ohio, Inc | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 534.0 MWh | Jul 2023 | Dec 2025 | Distillate Fuel Oil |
| Wadsworth HBS RTO BTM | American Mun Power-Ohio, Inc | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 606.0 MWh | Jan 2020 | Dec 2025 | Distillate Fuel Oil |
| Bowling Green Wind | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 3.3 GWh | Sep 2003 | Mar 2025 | Wind |
| Prospect Municipal | American Mun Power-Ohio, Inc | Prospect, OH | PJM Interconnection, LLC (PJM) | 81.0 MWh | Jan 1998 | Dec 2025 | Distillate Fuel Oil |
| AMP Napoleon Solar Facility | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 4.2 GWh | Aug 2012 | Dec 2025 | Solar |
| Dresden Energy Facility | Appalachian Power Co | Dresden, OH | PJM Interconnection, LLC (PJM) | 3.8 TWh | Jan 2012 | May 2026 | Natural Gas |
| Powell Creek Solar | Avangrid Power LLC | Miller City, OH | PJM Interconnection, LLC (PJM) | 304.7 GWh | Mar 2025 | May 2026 | Solar |
| Blue Creek Wind Project | Avangrid Power LLC | Paulding, OH | PJM Interconnection, LLC (PJM) | 808.5 GWh | Nov 2011 | May 2026 | Wind |
| Blue Harvest Solar Park | Blue Harvest Solar Park LLC | Continental, OH | PJM Interconnection, LLC (PJM) | 98.6 GWh | Nov 2023 | May 2026 | Solar |
| Broshco Fabricated Products | Broshco Fabricated Products | Mansfield, OH | PJM Interconnection, LLC (PJM) | 198.0 MWh | Aug 2001 | Mar 2026 | Natural Gas |
| Greenville Electric Generating Station | Buckeye Power, Inc | Greenville, OH | PJM Interconnection, LLC (PJM) | 105.0 GWh | May 2000 | Dec 2024 | Natural Gas : 99.6% |
| Robert P Mone Plant | Buckeye Power, Inc | Convoy, OH | PJM Interconnection, LLC (PJM) | 327.9 GWh | Jun 2002 | Dec 2025 | Natural Gas : 98.0% Distillate Fuel Oil : 2.0% |
| Cadence Solar Energy Center | Cadence Solar Energy LLC | Marysville, OH | PJM Interconnection, LLC (PJM) | 170.5 GWh | - | May 2026 | Solar |
| Cardinal | Cardinal Operating Company | Brillant, OH | PJM Interconnection, LLC (PJM) | 9.7 TWh | Jan 1967 | May 2026 | Bituminous Coal : 99.6% |
| Carroll County Energy | Carroll County Energy LLC | Carrollton, OH | PJM Interconnection, LLC (PJM) | 5.5 TWh | Nov 2017 | May 2026 | Natural Gas |
| Euclid Farm, Stamco N-54 | Case Western Reserve University | Euclid, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Sep 2012 | Dec 2025 | Wind |
| Celina Solar Project #1, LLC | Celina Solar Project #1, LLC | Celina, OH | PJM Interconnection, LLC (PJM) | 6.5 GWh | Nov 2012 | Dec 2025 | Solar |
| Parking Lot Array | Cincinnati Zoo & Botanical Garden | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 1.4 GWh | Apr 2011 | Dec 2025 | Solar |
| Akron WRF | City of Akron - (OH) | Akron, OH | PJM Interconnection, LLC (PJM) | 5.6 GWh | Apr 2014 | May 2026 | Other Biomass Gas |
| Bryan (OH) | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 3.2 GWh | Apr 1948 | Dec 2025 | Natural Gas : 94.5% Distillate Fuel Oil : 5.5% |
| Bryan Solar Field | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Auglaize Hydro | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 6.1 GWh | Nov 1986 | Dec 2025 | Water |
| ST-1/1A Engine No 1 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 3.0 MWh | Dec 2007 | Dec 2025 | Distillate Fuel Oil |
| PS ST-8 Engine No 1 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 2.0 MWh | Dec 2007 | Dec 2025 | Distillate Fuel Oil |
| Dodge Park Engine No 1 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 1.0 MWh | Dec 2007 | Dec 2025 | Distillate Fuel Oil |
| Renick Run Pumping Station 03-04 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 1.0 MWh | Aug 2006 | Dec 2025 | Distillate Fuel Oil |
| Cuyahoga Falls 1 | City of Cuyahoga Falls - (OH) | Cuyahoga Falls, OH | PJM Interconnection, LLC (PJM) | 866.0 MWh | Jun 2018 | Dec 2025 | Distillate Fuel Oil |
| Dover (OH) | City of Dover - (OH) | Dover, OH | PJM Interconnection, LLC (PJM) | 55.0 GWh | Dec 1953 | Dec 2025 | Bituminous Coal : 99.1% Natural Gas : 0.9% |
| Greenup Hydro | City of Hamilton - (OH) | Franklin Furnace, OH | PJM Interconnection, LLC (PJM) | 265.6 GWh | Nov 1982 | Dec 2025 | Water |
| Hamilton (OH) | City of Hamilton - (OH) | Hamilton, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Feb 1954 | Dec 2025 | Natural Gas |
| Hamilton Hydro | City of Hamilton - (OH) | HAMILTON, OH | PJM Interconnection, LLC (PJM) | 8.8 GWh | Apr 1994 | Dec 2025 | Water |
| Oberlin (OH) | City of Oberlin - (OH) | Oberlin, OH | PJM Interconnection, LLC (PJM) | 593.0 MWh | Dec 1947 | Dec 2025 | Natural Gas : 87.7% Distillate Fuel Oil : 12.3% |
| Orrville | City of Orrville - (OH) | Orrville, OH | PJM Interconnection, LLC (PJM) | 29.3 GWh | Dec 1948 | Dec 2025 | Bituminous Coal : 54.3% Natural Gas : 45.7% |
| Painesville | City of Painesville - (OH) | Painesville, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Dec 1948 | Dec 2025 | Bituminous Coal : 70.1% Natural Gas : 22.3% Distillate Fuel Oil : 7.6% |
| Piqua Power Plant | City of Piqua - (OH) | Piqua, OH | PJM Interconnection, LLC (PJM) | 529.0 MWh | Dec 1971 | Dec 2025 | Distillate Fuel Oil |
| Shelby South | City of Shelby - (OH) | Shelby, OH | PJM Interconnection, LLC (PJM) | 111.0 MWh | May 2000 | Dec 2025 | Distillate Fuel Oil |
| Progress Drive Generation Station | City of Shelby - (OH) | Shelby, OH | PJM Interconnection, LLC (PJM) | 22.0 MWh | Jun 2016 | Dec 2025 | Distillate Fuel Oil |
| St Marys | City of St Marys - (OH) | St. Marys, OH | PJM Interconnection, LLC (PJM) | 434.0 MWh | Jul 1992 | Dec 2025 | Distillate Fuel Oil |
| Anadarko | City of Woodsfield - (OH) | Woodsfield, OH | PJM Interconnection, LLC (PJM) | 42.0 MWh | Dec 1948 | Dec 2024 | Distillate Fuel Oil |
| Trumbull Energy Center | Clean Energy Future - Trumbull, LLC. | Warren, OH | PJM Interconnection, LLC (PJM) | 569.2 GWh | - | May 2026 | Natural Gas |
| Middletown- Ohio | Clean Energy Future-Lordstown, LLC | Lordstown, OH | PJM Interconnection, LLC (PJM) | 6.5 TWh | Sep 2018 | May 2026 | Natural Gas |
| Clearview Solar 1 | Clearview Solar I, LLC | Quincy, OH | PJM Interconnection, LLC (PJM) | 280.9 GWh | Nov 2024 | May 2026 | Solar |
| Cleveland Works | Cleveland Cliffs | Cleveland, OH | PJM Interconnection, LLC (PJM) | 380.5 GWh | Dec 1949 | May 2026 | Blast Furnace Gas : 55.0% Natural Gas : 45.0% |
| Clinton Solar (OH) | Clinton Solar (OH) LLC | Martinsville, OH | PJM Interconnection, LLC (PJM) | 48.6 GWh | Sep 2025 | May 2026 | Solar |
| Collinwood BioEnergy Facility | Collinwood BioEnergy | Cleveland, OH | PJM Interconnection, LLC (PJM) | 2.8 GWh | Apr 2011 | Dec 2024 | Other Biomass Gas |
| Cooper Farms VW Project | Cooper Hatchery Inc. | Van Wert, OH | PJM Interconnection, LLC (PJM) | 12.8 GWh | Feb 2012 | Dec 2024 | Wind |
| Cleveland Thermal | Corix Cleveland Thermal Generating LP | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jan 2017 | Dec 2025 | Natural Gas |
| Bay View Backup Power Facility | COT/Division of Water Reclamation | Toledo, OH | PJM Interconnection, LLC (PJM) | 629.0 MWh | Dec 2006 | Dec 2024 | Distillate Fuel Oil : 99.1% Natural Gas : 0.9% |
| CU Solar Plant | CU Solar LLC | Cedarville, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Mar 2013 | Dec 2025 | Solar |
| CZ Solar Warren, LLC | CZ Solar Warren, LLC | Lebanon, OH | PJM Interconnection, LLC (PJM) | 32.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Darby Power, LLC | Darby Power, LLC | Mt Sterling, OH | PJM Interconnection, LLC (PJM) | 543.9 GWh | Apr 2001 | Dec 2025 | Natural Gas : 98.7% Distillate Fuel Oil : 1.3% |
| DG AMP 1048 Wadsworth | DG AMP Solar, LLC | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 10.4 GWh | Nov 2019 | Dec 2025 | Solar |
| DG AMP Solar Piqua Manier | DG AMP Solar, LLC | Piqua, OH | PJM Interconnection, LLC (PJM) | 20.0 GWh | Jun 2019 | Dec 2025 | Solar |
| DG AMP Solar Orrville 3 | DG AMP Solar, LLC | Orrville, OH | PJM Interconnection, LLC (PJM) | 3.2 GWh | Jan 2018 | Dec 2025 | Solar |
| DG AMP Solar Versailles | DG AMP Solar, LLC | Versailles, OH | PJM Interconnection, LLC (PJM) | 2.6 GWh | Dec 2017 | Dec 2025 | Solar |
| DG AMP Solar Brewster | DG AMP Solar, LLC | Brewster, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Nov 2018 | Dec 2025 | Solar |
| DG AMP Solar Jackson Center | DG AMP Solar, LLC | Jackson Center, OH | PJM Interconnection, LLC (PJM) | 2.7 GWh | Jan 2018 | Dec 2025 | Solar |
| DG AMP Solar Bowling Green | DG AMP Solar, LLC | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 38.7 GWh | Dec 2016 | Dec 2025 | Solar |
| DG AMP Rittman Rd | DG AMP Solar, LLC | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 3.4 GWh | Apr 2020 | Dec 2025 | Solar |
| DG AMP Solar Piqua Staunton | DG AMP Solar, LLC | Piqua, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | Aug 2018 | Dec 2025 | Solar |
| Buckeye Solar | Dominion Renewable Energy | Williamsport, OH | PJM Interconnection, LLC (PJM) | 188.7 GWh | Dec 2024 | May 2026 | Solar |
| Pickaway Solar | Dominion Renewable Energy | Williamsport, OH | PJM Interconnection, LLC (PJM) | 185.6 GWh | Dec 2024 | May 2026 | Solar |
| Hardin Solar Energy LLC | Dominion Renewable Energy | Alger, OH | PJM Interconnection, LLC (PJM) | 303.7 GWh | Jan 2021 | May 2026 | Solar |
| Ashtabula | DTE Ashtabula, LLC | Ashtabula, OH | PJM Interconnection, LLC (PJM) | 159.0 GWh | Jan 2001 | May 2026 | Natural Gas |
| Madison | Duke Energy Indiana, LLC | Trenton, OH | PJM Interconnection, LLC (PJM) | 1.0 TWh | May 2000 | Dec 2024 | Natural Gas |
| Woodsdale | Duke Energy Kentucky Inc | Trenton, OH | PJM Interconnection, LLC (PJM) | 463.4 GWh | Apr 1992 | May 2026 | Natural Gas : 97.5% Distillate Fuel Oil : 2.5% |
| Hanging Rock Energy Facility | Dynegy Hanging Rock Energy Facility | Ironton, OH | PJM Interconnection, LLC (PJM) | 9.9 TWh | May 2003 | May 2026 | Natural Gas |
| Washington Energy Facility | Dynegy Washington Energy Facility | Beverly, OH | PJM Interconnection, LLC (PJM) | 4.4 TWh | May 2002 | May 2026 | Natural Gas |
| Racine | Eagle Creek Renewable Energy, LLC | Racine, OH | PJM Interconnection, LLC (PJM) | 190.0 GWh | Aug 1982 | Dec 2025 | Water |
| Fox Squirrel Solar | EDF Renewable Asset Holdings, Inc. | Mt Sterling, OH | PJM Interconnection, LLC (PJM) | 1.2 TWh | Nov 2023 | May 2026 | Solar |
| Brown County LFGTE Power Station | Energy Developments, Inc d/b/a EDL | Georgetown, OH | PJM Interconnection, LLC (PJM) | 26.4 GWh | May 2017 | Dec 2025 | Landfill Gas |
| Energy Developments, Hancock | Energy Developments, Inc d/b/a EDL | Findlay, OH | PJM Interconnection, LLC (PJM) | 17.8 GWh | Aug 2014 | Dec 2025 | Landfill Gas |
| Davis Besse | Energy Harbor Nuclear Generation LLC | Oak Harbor, OH | PJM Interconnection, LLC (PJM) | 7.1 TWh | Oct 1977 | May 2026 | Nuclear |