Bryan Peaking
1521 Evansport Rd., Bryan, OH 43506Plant Summary Information
Bryan Peaking is ranked #20 out of 53 distillate fuel oil power plants in Ohio in terms of total annual net electricity generation.
Bryan Peaking is comprised of 6 generators and generated 150.3 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Bryan Peaking |
|---|---|
| Utility Name | American Mun Power-Ohio, Inc |
| Location | Williams County, OH |
| Initial Operation Date | July 1999 |
| Last Update | Dec 2024 |
| Annual Generation | 523.0 MWh |
| Annual Consumption | 6.6 k MMBtu |
| Ranked #11,752 out of 12,637 Power Plants Nationwide | |
| Ranked #527 out of 1,246 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #167 out of 199 Ohio Power Plants | |
| Ranked #20 out of 53 Ohio Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Bryan Peaking
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bryan Peaking.
Monthly Net Generation for Bryan Peaking
Monthly Plant Fuel Consumption for Bryan Peaking
Bryan Peaking Details
| Summary Information | |
|---|---|
| Plant Name | Bryan Peaking (7779) |
| Plant Address | 1521 Evansport Rd., Bryan, OH 43506 |
| Utility | American Mun Power-Ohio, Inc (40577) |
| Latitude, Longitude | 41.4609, -84.527 |
| Generation Dates on File | Jan 2004 to Dec 2024 |
| Initial Operation Date | July 1999 |
| Annual Generation | 523.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Bryan - (OH) (2439) OH |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 1 Details Operating July 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating July 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating July 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1999 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 5 Details Operating July 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1999 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 6 Details Operating July 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1999 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Bryan Peaking Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #517 | Quakertown PA BTM | Quakertown, PA | 544.0 MWh |
| #518 | Ponton Diesel Generating Facility | Amelia, VA | 544.0 MWh |
| #519 | Indiana University of Pennsylvania | Indiana, PA | 21.4 GWh |
| #520 | Rockwood | Brawley, CA | 6.8 GWh |
| #521 | West Campus Cogeneration Facility | Madison, WI | 282.0 GWh |
| #522 | Ocean State Power II | Harrisville, RI | 896.8 GWh |
| #523 | Montpelier | Montpelier, OH | 533.0 MWh |
| #524 | Saint Marys Hospital Power Plant | Rochester, MN | 56.1 GWh |
| #525 | Niles RTO BTM | Niles, OH | 526.0 MWh |
| #526 | Montclair State University Cogen | Little Falls, NJ | 47.5 GWh |
| #528 | Jonesboro City Water & Light Plant | Jonesboro, AR | 78.0 GWh |
| #529 | Bellingham Cogeneration Facility | Bellingham, MA | 367.8 GWh |
| #530 | East Campus Utility Plant | Cincinnati, OH | 519.4 MWh |
| #531 | Wrangell | Wrangell, AK | 518.0 MWh |
| #532 | Lake (WY) | Yellowstone, WY | 515.0 MWh |
| #533 | Algona | Algona, IA | 507.0 MWh |
| #534 | Klawock Power Generation Station | Klawock, AK | 500.0 MWh |
| #535 | Front Street | Chicopee, MA | 497.0 MWh |
| #536 | LNG 1 & 2 | Norwich, CT | 494.0 MWh |
| #537 | Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 85.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bryan Peaking.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AMP Napoleon Solar Facility | Napoleon, OH | 4.6 GWh | 21.9 mi |
| Arche Energy Project, LLC | Fulton, OH | 193.8 GWh | 18.5 mi |
| Auglaize Hydro | Bryan, OH | 6.5 GWh | 16.8 mi |
| Blue Harvest Solar Park | Continental, OH | 99.8 GWh | 28.7 mi |
| Bryan (OH) | Bryan, OH | 2.8 GWh | 1.1 mi |
| Bryan Solar Field | Bryan, OH | 2.5 GWh | 3.2 mi |
| Edgerton | Edgerton, OH | 212.0 MWh | 12.5 mi |
| LafargeHolcim - Paulding Wind Project | Paulding, OH | 5.7 GWh | 19.1 mi |
| Montpelier | Montpelier, OH | 533.0 MWh | 9 mi |
| Montpelier Solar Project | Montpelier, OH | 5.1 GWh | 9.1 mi |
| Napoleon Peaking | Napoleon, OH | 244.0 MWh | 21.9 mi |
| Napoleon Peaking Station | Napoleon, OH | 2.8 GWh | 21.9 mi |
| Napoleon Solar I | Napoleon, OH | 10.8 GWh | 22.9 mi |
| Paulding Wind Farm III | Payne, OH | 318.0 GWh | 26.2 mi |
| Richland (OH) | Defiance, OH | 327.3 GWh | 14.7 mi |
| Sauder Power Plant | Archbold, OH | 7.4 GWh | 12.7 mi |
| Stryker | Stryker, OH | 23.0 MWh | 5.8 mi |
| Timber Road IV | Payne, OH | 389.7 GWh | 26.2 mi |
| Timber Road Solar Park | Payne, OH | 99.9 GWh | 27.5 mi |
| Waterloo Solar, LLC | Waterloo, IN | 592.0 MWh | 26.8 mi |