| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Marion County Solar Project | Marion County Solar Project, LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 50.2 GWh | - | May 2026 | Solar |
| Trumbull Energy Center | Clean Energy Future - Trumbull, LLC. | Warren, OH | PJM Interconnection, LLC (PJM) | 569.2 GWh | - | May 2026 | Natural Gas |
| Montpelier Solar Project | Montpelier Solar, LLC | Montpelier, OH | PJM Interconnection, LLC (PJM) | 32.3 GWh | - | May 2026 | Solar |
| Cadence Solar Energy Center | Cadence Solar Energy LLC | Marysville, OH | PJM Interconnection, LLC (PJM) | 170.5 GWh | - | May 2026 | Solar |
| Oberlin (OH) | City of Oberlin - (OH) | Oberlin, OH | PJM Interconnection, LLC (PJM) | 593.0 MWh | Dec 1947 | Dec 2025 | Natural Gas : 87.7% Distillate Fuel Oil : 12.3% |
| Bryan (OH) | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 3.2 GWh | Apr 1948 | Dec 2025 | Natural Gas : 94.5% Distillate Fuel Oil : 5.5% |
| O H Hutchings | Kimura Power LLC | Miamisburg, OH | PJM Interconnection, LLC (PJM) | 397.0 MWh | Jun 1948 | Dec 2024 | Natural Gas |
| Orrville | City of Orrville - (OH) | Orrville, OH | PJM Interconnection, LLC (PJM) | 29.3 GWh | Dec 1948 | Dec 2025 | Bituminous Coal : 54.3% Natural Gas : 45.7% |
| Painesville | City of Painesville - (OH) | Painesville, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Dec 1948 | Dec 2025 | Bituminous Coal : 70.1% Natural Gas : 22.3% Distillate Fuel Oil : 7.6% |
| Anadarko | City of Woodsfield - (OH) | Woodsfield, OH | PJM Interconnection, LLC (PJM) | 42.0 MWh | Dec 1948 | Dec 2024 | Distillate Fuel Oil |
| Cleveland Works | Cleveland Cliffs | Cleveland, OH | PJM Interconnection, LLC (PJM) | 380.5 GWh | Dec 1949 | May 2026 | Blast Furnace Gas : 55.0% Natural Gas : 45.0% |
| Pixelle Specialty Solutions LLC - Chilli | US Paper Mill Company | Chillicothe, OH | PJM Interconnection, LLC (PJM) | 272.9 GWh | Jan 1952 | Jun 2025 | Black Liquor : 41.8% Natural Gas : 41.1% Wood/Wood Waste Solids : 14.2% Tire-derived Fuels : 2.1% Distillate Fuel Oil : 0.7% |
| Dover (OH) | City of Dover - (OH) | Dover, OH | PJM Interconnection, LLC (PJM) | 55.0 GWh | Dec 1953 | Dec 2025 | Bituminous Coal : 99.1% Natural Gas : 0.9% |
| Hamilton (OH) | City of Hamilton - (OH) | Hamilton, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Feb 1954 | Dec 2025 | Natural Gas |
| Kyger Creek | Ohio Valley Electric Corp | Cheshire, OH | PJM Interconnection, LLC (PJM) | 5.0 TWh | Jan 1955 | May 2026 | Bituminous Coal : 98.7% Subbituminous Coal : 1.1% |
| FirstEnergy Bay Shore | Walleye Power, LLC | Oregon, OH | PJM Interconnection, LLC (PJM) | 1.0 TWh | Jul 1955 | Dec 2024 | Petroleum Coke : 99.8% |
| Miami Fort | Luminant Miami Fort | North Bend, OH | PJM Interconnection, LLC (PJM) | 6.5 TWh | Oct 1960 | May 2026 | Bituminous Coal : 99.8% |
| Dick's Creek | Luminant Dick's Creek | Monroe, OH | PJM Interconnection, LLC (PJM) | 15.0 GWh | Aug 1965 | Dec 2025 | Natural Gas |
| Richland (OH) | Richland-Stryker Generation LLC | Defiance, OH | PJM Interconnection, LLC (PJM) | 367.5 GWh | Nov 1965 | Dec 2025 | Natural Gas |
| Cardinal | Cardinal Operating Company | Brillant, OH | PJM Interconnection, LLC (PJM) | 9.7 TWh | Jan 1967 | May 2026 | Bituminous Coal : 99.6% |
| Tait Electric Generating Station | Kimura Power LLC | Moraine, OH | PJM Interconnection, LLC (PJM) | 957.6 GWh | Apr 1967 | Dec 2025 | Natural Gas : 99.7% |
| Stryker | Richland-Stryker Generation LLC | Stryker, OH | PJM Interconnection, LLC (PJM) | 161.0 MWh | Jan 1968 | Dec 2025 | Distillate Fuel Oil |
| Monument | Kimura Power LLC | Dayton, OH | PJM Interconnection, LLC (PJM) | 114.0 MWh | May 1968 | Dec 2024 | Distillate Fuel Oil |
| Sidney (OH) | Kimura Power LLC | Sidney, OH | PJM Interconnection, LLC (PJM) | 91.0 MWh | Jun 1968 | Dec 2024 | Distillate Fuel Oil |
| Yankee Street | Kimura Power LLC | Centerville, OH | PJM Interconnection, LLC (PJM) | 29.0 GWh | Jun 1969 | Dec 2025 | Natural Gas : 94.6% Solar : 3.4% Distillate Fuel Oil : 2.0% |
| Piqua Power Plant | City of Piqua - (OH) | Piqua, OH | PJM Interconnection, LLC (PJM) | 529.0 MWh | Dec 1971 | Dec 2025 | Distillate Fuel Oil |
| Niles Power Plant | Niles Power, LLC | Niles, OH | PJM Interconnection, LLC (PJM) | 182.0 MWh | Jun 1972 | Dec 2025 | Distillate Fuel Oil |
| West Lorain | Vermillion Power LLC | Lorain, OH | PJM Interconnection, LLC (PJM) | 1.3 TWh | May 1973 | Dec 2025 | Natural Gas : 99.5% Distillate Fuel Oil : 0.5% |
| Gavin Power, LLC | Gavin Power, LLC | Cheshire, OH | PJM Interconnection, LLC (PJM) | 13.2 TWh | Sep 1974 | May 2026 | Bituminous Coal : 99.6% |
| Davis Besse | Energy Harbor Nuclear Generation LLC | Oak Harbor, OH | PJM Interconnection, LLC (PJM) | 7.1 TWh | Oct 1977 | May 2026 | Nuclear |
| Morton Salt Rittman | Morton Salt Inc | Rittman, OH | PJM Interconnection, LLC (PJM) | 14.3 GWh | Sep 1978 | Dec 2025 | Natural Gas |
| Racine | Eagle Creek Renewable Energy, LLC | Racine, OH | PJM Interconnection, LLC (PJM) | 190.0 GWh | Aug 1982 | Dec 2025 | Water |
| Greenup Hydro | City of Hamilton - (OH) | Franklin Furnace, OH | PJM Interconnection, LLC (PJM) | 265.6 GWh | Nov 1982 | Dec 2025 | Water |
| Toledo Ref Power Recovery Train | Toledo Refining Company | Oregon, OH | PJM Interconnection, LLC (PJM) | 81.5 MWh | May 1986 | Jul 2025 | Petroleum Coke |
| Auglaize Hydro | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 6.1 GWh | Nov 1986 | Dec 2025 | Water |
| Perry | Energy Harbor Nuclear Generation LLC | Perry, OH | PJM Interconnection, LLC (PJM) | 11.0 TWh | Oct 1987 | May 2026 | Nuclear |
| Woodsdale | Duke Energy Kentucky Inc | Trenton, OH | PJM Interconnection, LLC (PJM) | 463.4 GWh | Apr 1992 | May 2026 | Natural Gas : 97.5% Distillate Fuel Oil : 2.5% |
| St Marys | City of St Marys - (OH) | St. Marys, OH | PJM Interconnection, LLC (PJM) | 434.0 MWh | Jul 1992 | Dec 2025 | Distillate Fuel Oil |
| Sauder Power Plant | Sauder Woodworking Co | Archbold, OH | PJM Interconnection, LLC (PJM) | 7.4 GWh | Sep 1993 | Apr 2025 | Wood/Wood Waste Solids : 99.3% Natural Gas : 0.7% |
| Hamilton Hydro | City of Hamilton - (OH) | HAMILTON, OH | PJM Interconnection, LLC (PJM) | 8.8 GWh | Apr 1994 | Dec 2025 | Water |
| Prospect Municipal | American Mun Power-Ohio, Inc | Prospect, OH | PJM Interconnection, LLC (PJM) | 81.0 MWh | Jan 1998 | Dec 2025 | Distillate Fuel Oil |
| Wellington | American Mun Power-Ohio, Inc | Wellington, OH | PJM Interconnection, LLC (PJM) | 46.0 MWh | Jan 1998 | Dec 2025 | Distillate Fuel Oil |
| Versailles Peaking | American Mun Power-Ohio, Inc | Versailles, OH | PJM Interconnection, LLC (PJM) | 288.0 MWh | May 1999 | Dec 2025 | Distillate Fuel Oil |
| Jackson Cntr Peaking | American Mun Power-Ohio, Inc | Jackson Center, OH | PJM Interconnection, LLC (PJM) | 98.0 MWh | May 1999 | Dec 2025 | Distillate Fuel Oil |
| Napoleon Peaking | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 242.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Dover Peaking | American Mun Power-Ohio, Inc | Dover, OH | PJM Interconnection, LLC (PJM) | 547.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Orrville Peaking | American Mun Power-Ohio, Inc | Orrville, OH | PJM Interconnection, LLC (PJM) | 271.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Bryan Peaking | American Mun Power-Ohio, Inc | Bryan, OH | PJM Interconnection, LLC (PJM) | 597.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Hamilton Peaking | American Mun Power-Ohio, Inc | Hamilton, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2000 | Dec 2025 | Natural Gas |
| Bowling Green Peaking | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 2.3 GWh | May 2000 | Dec 2025 | Natural Gas |
| Shelby North | American Mun Power-Ohio, Inc | Shelby, OH | PJM Interconnection, LLC (PJM) | 66.0 MWh | May 2000 | Dec 2025 | Distillate Fuel Oil |
| Shelby South | City of Shelby - (OH) | Shelby, OH | PJM Interconnection, LLC (PJM) | 111.0 MWh | May 2000 | Dec 2025 | Distillate Fuel Oil |
| Madison | Duke Energy Indiana, LLC | Trenton, OH | PJM Interconnection, LLC (PJM) | 1.0 TWh | May 2000 | Dec 2024 | Natural Gas |
| Greenville Electric Generating Station | Buckeye Power, Inc | Greenville, OH | PJM Interconnection, LLC (PJM) | 105.0 GWh | May 2000 | Dec 2024 | Natural Gas : 99.6% |
| Bowling Green Generating Station | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 2.8 GWh | May 2000 | Dec 2025 | Natural Gas |
| Galion Generating Station | American Mun Power-Ohio, Inc | Galion, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | May 2000 | Dec 2025 | Natural Gas |
| Napoleon Peaking Station | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 2.6 GWh | May 2000 | Dec 2025 | Natural Gas |
| Cleveland Peaking | American Mun Power-Ohio, Inc | Cleveland, OH | PJM Interconnection, LLC (PJM) | 547.0 MWh | Jun 2000 | Dec 2025 | Distillate Fuel Oil |
| Montpelier | American Mun Power-Ohio, Inc | Montpelier, OH | PJM Interconnection, LLC (PJM) | 466.0 MWh | Jun 2000 | Dec 2025 | Distillate Fuel Oil |
| Edgerton | American Mun Power-Ohio, Inc | Edgerton, OH | PJM Interconnection, LLC (PJM) | 182.0 MWh | Jul 2000 | Dec 2025 | Distillate Fuel Oil |
| Ashtabula | DTE Ashtabula, LLC | Ashtabula, OH | PJM Interconnection, LLC (PJM) | 159.0 GWh | Jan 2001 | May 2026 | Natural Gas |
| Darby Power, LLC | Darby Power, LLC | Mt Sterling, OH | PJM Interconnection, LLC (PJM) | 543.9 GWh | Apr 2001 | Dec 2025 | Natural Gas : 98.7% Distillate Fuel Oil : 1.3% |
| Seville | American Mun Power-Ohio, Inc | Seville, OH | PJM Interconnection, LLC (PJM) | 260.0 MWh | May 2001 | Dec 2025 | Distillate Fuel Oil |
| Galion | American Mun Power-Ohio, Inc | Galion, OH | PJM Interconnection, LLC (PJM) | 262.0 MWh | Jun 2001 | Dec 2025 | Distillate Fuel Oil |
| Broshco Fabricated Products | Broshco Fabricated Products | Mansfield, OH | PJM Interconnection, LLC (PJM) | 198.0 MWh | Aug 2001 | Mar 2026 | Natural Gas |
| Troy Energy LLC | Troy Energy LLC | Luckey, OH | PJM Interconnection, LLC (PJM) | 1.3 TWh | May 2002 | Dec 2025 | Natural Gas : 99.8% |
| Washington Energy Facility | Dynegy Washington Energy Facility | Beverly, OH | PJM Interconnection, LLC (PJM) | 4.4 TWh | May 2002 | May 2026 | Natural Gas |
| Robert P Mone Plant | Buckeye Power, Inc | Convoy, OH | PJM Interconnection, LLC (PJM) | 327.9 GWh | Jun 2002 | Dec 2025 | Natural Gas : 98.0% Distillate Fuel Oil : 2.0% |
| Summit Street Power Plant | Kent State University | Kent, OH | PJM Interconnection, LLC (PJM) | 30.5 GWh | Dec 2002 | May 2026 | Natural Gas |
| Rolling Hills Generating | Rolling Hills Generating LLC | Wilkesville, OH | PJM Interconnection, LLC (PJM) | 2.0 TWh | May 2003 | Dec 2025 | Natural Gas |
| Hanging Rock Energy Facility | Dynegy Hanging Rock Energy Facility | Ironton, OH | PJM Interconnection, LLC (PJM) | 9.9 TWh | May 2003 | May 2026 | Natural Gas |
| Waterford Power, LLC | Waterford Power, LLC | Waterford, OH | PJM Interconnection, LLC (PJM) | 6.6 TWh | Jul 2003 | May 2026 | Natural Gas |
| Bowling Green Wind | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 3.3 GWh | Sep 2003 | Mar 2025 | Wind |
| Central Utility Plant Cincinnati | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 223.0 GWh | May 2004 | May 2026 | Natural Gas : 98.7% Distillate Fuel Oil : 1.3% |
| Genoa Diesel Generating Station | Village of Genoa - (OH) | Genoa, OH | PJM Interconnection, LLC (PJM) | 239.0 MWh | Nov 2004 | Dec 2025 | Distillate Fuel Oil |
| East Campus Utility Plant | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 526.3 MWh | Jun 2006 | May 2026 | Distillate Fuel Oil |
| Renick Run Pumping Station 03-04 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 1.0 MWh | Aug 2006 | Dec 2025 | Distillate Fuel Oil |
| Bay View Backup Power Facility | COT/Division of Water Reclamation | Toledo, OH | PJM Interconnection, LLC (PJM) | 629.0 MWh | Dec 2006 | Dec 2024 | Distillate Fuel Oil : 99.1% Natural Gas : 0.9% |
| Dodge Park Engine No 1 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 1.0 MWh | Dec 2007 | Dec 2025 | Distillate Fuel Oil |
| PS ST-8 Engine No 1 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 2.0 MWh | Dec 2007 | Dec 2025 | Distillate Fuel Oil |
| ST-1/1A Engine No 1 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 3.0 MWh | Dec 2007 | Dec 2025 | Distillate Fuel Oil |
| Haverhill North Cogeneration Facility | SunCoke Energy, Inc. | Franklin Furnace, OH | PJM Interconnection, LLC (PJM) | 320.2 GWh | Nov 2008 | Dec 2025 | Other Gas : 85.7% Natural Gas : 14.3% |
| Toledo Air National Guard | 180th Fighter Wing | Swanton, OH | PJM Interconnection, LLC (PJM) | 296.0 MWh | Dec 2009 | Dec 2025 | Solar |
| Wyandot Solar Farm | Wyandot Solar LLC | Upper Sandusky, OH | PJM Interconnection, LLC (PJM) | 10.7 GWh | Mar 2010 | May 2026 | Solar |
| North American - Erie Generating Station | North American -- Erie, LLC | Milan, OH | PJM Interconnection, LLC (PJM) | 10.0 GWh | Mar 2010 | Dec 2025 | Landfill Gas |
| Suburban Landfill Gas Recovery | WM Renewable Energy LLC | Glenford, OH | PJM Interconnection, LLC (PJM) | 32.9 GWh | Dec 2010 | Dec 2025 | Landfill Gas |
| Parking Lot Array | Cincinnati Zoo & Botanical Garden | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 1.4 GWh | Apr 2011 | Dec 2025 | Solar |
| Collinwood BioEnergy Facility | Collinwood BioEnergy | Cleveland, OH | PJM Interconnection, LLC (PJM) | 2.8 GWh | Apr 2011 | Dec 2024 | Other Biomass Gas |
| Paulding Wind Farm II | Paulding Wind Farm II LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 312.0 GWh | Jun 2011 | May 2026 | Wind |
| LE Wind Turbine 1 | Lincoln Electric Company | Euclid, OH | PJM Interconnection, LLC (PJM) | 1.8 GWh | Jun 2011 | Dec 2025 | Wind |
| Blue Creek Wind Project | Avangrid Power LLC | Paulding, OH | PJM Interconnection, LLC (PJM) | 808.5 GWh | Nov 2011 | May 2026 | Wind |
| Middletown Coke Company, LLC | SunCoke Energy, Inc. | Middletown, OH | PJM Interconnection, LLC (PJM) | 360.0 GWh | Nov 2011 | Oct 2025 | Other Gas : 99.1% Natural Gas : 0.9% |
| Napoleon Solar I | Enfinity BNB Napoleon Solar LLC | Napoleon, OH | PJM Interconnection, LLC (PJM) | 10.9 GWh | Nov 2011 | Dec 2025 | Solar |
| Fremont Energy Center | American Mun Power-Ohio, Inc | Fremont, OH | PJM Interconnection, LLC (PJM) | 4.2 TWh | Dec 2011 | May 2026 | Natural Gas |
| Bryan Solar Field | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Dresden Energy Facility | Appalachian Power Co | Dresden, OH | PJM Interconnection, LLC (PJM) | 3.8 TWh | Jan 2012 | May 2026 | Natural Gas |
| Cooper Farms VW Project | Cooper Hatchery Inc. | Van Wert, OH | PJM Interconnection, LLC (PJM) | 12.8 GWh | Feb 2012 | Dec 2024 | Wind |
| AMP Napoleon Solar Facility | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 4.2 GWh | Aug 2012 | Dec 2025 | Solar |
| Euclid Farm, Stamco N-54 | Case Western Reserve University | Euclid, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Sep 2012 | Dec 2025 | Wind |
| Oberlin Spear Point Solar One | Oberlin College | Oberlin, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | Oct 2012 | Dec 2025 | Solar |