Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| St. Joseph Hospital | St. Joseph Hospital (NY) | Yonkers, NY | New York Independent System Operator (NYIS) | 16.0 MWh | Dec 1959 | Dec 2024 | Distillate Fuel Oil |
| Mt. Sinai- Morningside | Mt. Sinai- Morningside | New York, NY | New York Independent System Operator (NYIS) | 17.0 MWh | Dec 1959 | Dec 2024 | Distillate Fuel Oil |
| Regeneron Tarrytown | Bloom Energy | Tarrytown, NY | New York Independent System Operator (NYIS) | 12.3 GWh | Sep 2018 | Dec 2024 | Natural Gas |
| Washington St Community Solar Farm #4 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jan 2020 | Dec 2024 | Solar |
| Washington St Community Solar Farm #1 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jan 2020 | Dec 2024 | Solar |
| Washington St Community Solar Farm #3 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Mar 2020 | Dec 2024 | Solar |
| Gaskill Rd Community Solar Farm CSG | Scale Sustainable I, LLC | Owego, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Big Tree Community Solar Farm | Generate Capital | Wales, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2021 | Dec 2024 | Solar |
| Dryden Rd #2 Community Solar Farm CSG | Scale Sustainable I, LLC | Dryden, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Woodoak Drive Community Solar Farm CSG | Scale Sustainable I, LLC | Tusten, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Burritt Rd Community Solar Farm | Generate Capital | Parma, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jan 2020 | Dec 2024 | Solar |
| CMR Solar LLC | CMR Solar, LLC | Pine Bush, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Apr 2019 | Dec 2024 | Solar |
| Telegraph Rd #1 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Nov 2021 | Dec 2024 | Solar |
| Telegraph Rd #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2021 | Dec 2024 | Solar |
| Route 19 #1 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 3.9 GWh | May 2022 | Dec 2024 | Solar |
| Route 19 #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 8.6 GWh | May 2022 | Dec 2024 | Solar |
| Frey Rd #1 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| County Route 11 Community Solar Farm | KSI II Consolidated, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Nov 2020 | Dec 2024 | Solar |
| Furnace Rd Community Solar Farm | KSI II Consolidated, LLC | Ontario, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Yellow Mills Rd #1 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Yellow Mills Rd #2 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2022 | Dec 2024 | Solar |
| Yellow Mills Rd #3 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Frey Rd #2 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Route 22 Community Solar Farm CSG | KSI II Consolidated, LLC | Plattsburgh, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Sep 2021 | Dec 2024 | Solar |
| Villa Roma Rd #1 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jan 2020 | Dec 2024 | Solar |
| Villa Roma Rd #2 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Villa Roma Rd #3 CSG | Scale Sustainable I, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 519.0 MWh | Nov 2019 | Dec 2024 | Solar |
| Villa Roma Rd #4 CSG | Scale Sustainable I, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Boas Rd #1 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2019 | Dec 2024 | Solar |
| Boas Rd #2 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2019 | Dec 2024 | Solar |
| Boas Rd #3 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jul 2019 | Dec 2024 | Solar |
| Boas Rd #4 Community Solar Farm | Generate Capital | Mooers, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2020 | Dec 2024 | Solar |
| Kearsarge Johnstown 1 CSG | Kearsarge Johnstown 1 LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2018 | Dec 2024 | Solar |
| Kearsarge Johnstown 2 CSG | Kearsarge Johnstown 2 LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2018 | Dec 2024 | Solar |
| ATT Jericho | Bloom Energy | Huntington, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| MER Queens | Bloom Energy | Elmhurst, NY | New York Independent System Operator (NYIS) | 9.7 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| Route 14A CDG Solar North and South LLC | Route 14A CDG Solar North and South, LLC | Geneva, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Newfield Community Solar LLC | Newfield Solar LLC | Newfield, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Dec 2018 | Dec 2024 | Solar |
| Montefiore Mount Vernon Hospital | Montefiore Mount Vernon Hospital | Mount Vernon, NY | New York Independent System Operator (NYIS) | 12.0 MWh | Dec 1975 | Dec 2024 | Distillate Fuel Oil |
| CBP Solar | Powerflex | Buchanan, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2018 | Dec 2024 | Solar |
| Kinder Morgan Fordham | Powerflex | Staten Island, NY | New York Independent System Operator (NYIS) | 3.9 GWh | May 2018 | Dec 2024 | Solar |
| Rockland Bakery Inc. | Rockland Bakery Inc. | Nanuet, NY | New York Independent System Operator (NYIS) | 21.0 MWh | Dec 1995 | Dec 2024 | Natural Gas : 90.7% Distillate Fuel Oil : 9.3% |
| Steel Sun 2: 2303-III-9 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Steel Sun 2: 2303-III-4 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Apr 2019 | Dec 2024 | Solar |
| Steel Sun 2: 2303-III-2 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Homer Street West | CleanCapital Holdings | Olean, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| Homer Street East | CleanCapital Holdings | Olean, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Apr 2019 | Dec 2024 | Solar |
| Harbec Energy | Harbec Energy | Ontario, NY | New York Independent System Operator (NYIS) | 598.0 MWh | Nov 2001 | Dec 2024 | Natural Gas : 97.3% Wind : 2.7% |
| West Valley West | BQ Energy LLC | West Valley, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2022 | Dec 2024 | Solar |
| West Valley East | BQ Energy LLC | West Valley, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2022 | Dec 2024 | Solar |
| Greenville CSG | Altus Power America Management, LLC | Port Jervis, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2019 | Dec 2024 | Solar |
| Chester CSG | Altus Power America Management, LLC | Chester, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jun 2019 | Dec 2024 | Solar |
| Westtown CSG | Altus Power America Management, LLC | Westtown, NY | ISO New England (ISNE) | 3.2 GWh | Apr 2019 | Dec 2024 | Solar |
| Ulster County Solar | Ulster Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Apr 2018 | Dec 2024 | Solar |
| Franklin Solar Site | Helios NY I, LLC | Malone, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Malone Solar Site | Helios NY I, LLC | Malone, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Sugarhill Road - Solitude Solar CSG | Standard Solar | Rexford, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Aug 2019 | Dec 2024 | Solar |
| RIT Henrietta Solar 1, LLC | SolRiver Capital LLC | Rochester, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2018 | Dec 2024 | Solar |
| Hickory Grove #1 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Hickory Grove #2 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Podunk Road CSG | Altus Power America Management, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2019 | Dec 2024 | Solar |
| Garnet Solar (NY) | AEP Onsite Partners, LLC | Johnsburg, NY | New York Independent System Operator (NYIS) | 2.8 GWh | May 2018 | Dec 2024 | Solar |
| Chambers Road Solar | Altus Power America Management, LLC | Big Flats, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2020 | Dec 2024 | Solar |
| Burrstone Energy Center | Burrstone Energy Center | New Hartford, NY | New York Independent System Operator (NYIS) | 10.0 GWh | Jul 2009 | Dec 2024 | Natural Gas |
| Finchville Solar, LLC Hybrid CSG | AES Distributed Energy | Mt. Hope, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Sep 2020 | Dec 2024 | Solar |
| RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Ransomville Solar 1, LLC | AES Distributed Energy | Ransomville, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Johnstown Solar 1, LLC | AES Distributed Energy | Gloversville, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Hollygrove CSG | Nautilus Solar Solutions | Red Creek, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2018 | Dec 2024 | Solar |
| Guildlerland CSG | Nautilus Solar Solutions | Guilderland, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2018 | Dec 2024 | Solar |
| Howland CSG | Nautilus Solar Solutions | Sandy Creek, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2018 | Dec 2024 | Solar |
| Gifford CSG | Nautilus Solar Solutions | Schenectady, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2018 | Dec 2024 | Solar |
| Czub CSG | Nautilus Solar Solutions | Schagticoke, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Mereand CSG | Nautilus Solar Solutions | Watertown, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Aegis CSG | Nautilus Solar Solutions | Canadaigua, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2018 | Dec 2024 | Solar |
| Pearl CSG | Nautilus Solar Solutions | Batavia, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Bethlehem Solar | Nautilus Solar Solutions | New Scotland, NY | New York Independent System Operator (NYIS) | 2.2 GWh | May 2019 | Dec 2024 | Solar |
| Frog Hollow CSG | Nautilus Solar Solutions | Ellenville, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Sep 2019 | Dec 2024 | Solar |
| Dover CSG | Nautilus Solar Solutions | Dover Plains, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Aug 2019 | Dec 2024 | Solar |
| Howell CSG | Nautilus Solar Solutions | Middletown, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Jan 2020 | Dec 2024 | Solar |
| Strauss CSG | Nautilus Solar Solutions | Geneva, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Aug 2019 | Dec 2024 | Solar |
| Ellsworth I CSG | Nautilus Solar Solutions | Mechanicville, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Allis Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Jun 2020 | Dec 2024 | Solar |
| Beals Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Apr 2020 | Dec 2024 | Solar |
| AES Tonawanda Solar LLC | AES Distributed Energy | Tonawanda, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Dec 2019 | Dec 2024 | Solar |
| NY 26 Carthage CSG | Standard Solar | Carthage, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Feb 2020 | Dec 2024 | Solar |
| Knaggs Brothers Farm | Dynamic Energy Holdings LLC | Altamont, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Kings Plaza Total Energy Plant (TEP) | Veolia North America | Brooklyn, NY | New York Independent System Operator (NYIS) | 22.4 GWh | Aug 2007 | Dec 2024 | Natural Gas |
| Barneveld Solar | Citizens Enterprises Corporation | Barneveld, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Apr 2019 | Dec 2024 | Solar |
| 100 Brook Hill Drive Solar | Diamond Properties | West Nyack, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Nov 2015 | Dec 2024 | Solar |
| Hobart & William Smith College Gates Rd. | Dynamic Energy Holdings LLC | Geneva, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Lansing Renewables, LLC | Lansing Renewables, LLC | Lansing, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Oct 2020 | Dec 2024 | Solar |
| Hales Mills Solar, LLC | Hales Mills Solar, LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Sep 2020 | Dec 2024 | Solar |
| Owlville Creek Solar 2, LLC | Owlville Creek Solar 2, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Owlville Creek Solar, LLC | Owlville Creek Solar, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2020 | Dec 2024 | Solar |
| Riley Road LLC | Green Street Power Partners | New Windsor, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jul 2019 | Dec 2024 | Solar |
| Hope Solar Farm LLC | Green Street Power Partners | Troy, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Catlin Solar 1 LLC | Green Street Power Partners | Beaver Dams, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Saratoga Solar LLC | Green Street Power Partners | Milton, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Nov 2019 | Dec 2024 | Solar |
| Pearl II | Nautilus Solar Solutions | Batavia, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2018 | Dec 2024 | Solar |