669 Main Street, Watertown, NY 13601Plant Summary Information
Glen Park Hydroelectric Project is ranked #16 out of 148 hydroelectric power plants in New York in terms of total annual net electricity generation.
Glen Park Hydroelectric Project is comprised of 3 generators and generated 21.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Glen Park Hydroelectric Project |
|---|---|
| Utility Name | Eagle Creek Renewable Energy, LLC |
| Location | Jefferson County, NY |
| Initial Operation Date | October 1999 |
| Last Update | Dec 2025 |
| Annual Generation | 72.4 GWh |
| Annual Consumption | 286.0 k MMBtu |
| Ranked #3,834 out of 13,081 Power Plants Nationwide | |
| Ranked #397 out of 1,311 Water Power Plants Nationwide | |
| Ranked #107 out of 1,045 New York Power Plants | |
| Ranked #16 out of 148 New York Water Power Plants | |
| Fuel Types | Water |
| Previous Operators |
Northbrook New York LLC (2013 to 2015) Black River Hydroelectric, LLC (2016 to 2020) Eagle Creek Renewable Energy, LLC (2021 to 2025) |
Map of Glen Park Hydroelectric Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Glen Park Hydroelectric Project.
Monthly Net Generation for Glen Park Hydroelectric Project
Monthly Plant Fuel Consumption for Glen Park Hydroelectric Project
Glen Park Hydroelectric Project Details
| Summary Information | |
|---|---|
| Plant Name | Glen Park Hydroelectric Project (50512) |
| Plant Address | 669 Main Street, Watertown, NY 13601 |
| Utility | Eagle Creek Renewable Energy, LLC (57280) |
| Latitude, Longitude | 44.00061, -75.96116 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | October 1999 |
| Annual Generation | 72.4 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 86-711-000 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 99-230-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Black River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating October 1999
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 14.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 14.5 MW |
| Winter Capacity | 14.5 MW |
| Minimum Load | 2.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 1999 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
Generator GEN2 Details Operating October 1999
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 14.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 14.5 MW |
| Winter Capacity | 14.5 MW |
| Minimum Load | 2.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 1999 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
Generator GEN3 Details Operating October 1999
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 3.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 3.6 MW |
| Winter Capacity | 3.6 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 1999 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
Glen Park Hydroelectric Project Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Black River Hydroelectric, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator GEN1 | 100.00% |
| Black River Hydroelectric, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator GEN2 | 100.00% |
| Black River Hydroelectric, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator GEN3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #387 | Skelton | Dayton, ME | 77.2 GWh |
| #388 | Fishing Creek | Great Falls, SC | 76.8 GWh |
| #389 | Roosevelt | Roosevelt, AZ | 76.0 GWh |
| #390 | Madison Dam | Ennis, MT | 75.6 GWh |
| #391 | Drop 4 | Holtville, CA | 74.9 GWh |
| #392 | Worumbo Hydro Station | Lisbon Falls, ME | 74.3 GWh |
| #393 | Packwood | Packwood, WA | 73.8 GWh |
| #394 | Friant Hydro Facility | Friant, CA | 73.5 GWh |
| #395 | Narrows PH | Grass Valley, CA | 73.4 GWh |
| #396 | McNary Dam Fish Attraction Project | Plymouth, WA | 72.5 GWh |
| #398 | Cougar | Lowell, OR | 72.3 GWh |
| #399 | Blanchard | Royalton, MN | 72.0 GWh |
| #400 | Balch 1 | Balch Camp, CA | 71.2 GWh |
| #401 | Stevenson | Monroe, CT | 70.8 GWh |
| #402 | Stevens Creek | Martinez, GA | 70.8 GWh |
| #403 | Dearborn | Great Falls, SC | 70.2 GWh |
| #404 | West Enfield Hydro | West Enfield, ME | 70.2 GWh |
| #405 | Cornell | Chippewa Falls, WI | 69.9 GWh |
| #406 | Brunswick Hydro | Brunswick, ME | 69.6 GWh |
| #407 | Kelly Ridge | Oroville, CA | 69.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Glen Park Hydroelectric Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ASA Clayton NY Solar I LLC | Clayton, NY | 2.6 GWh | 13.3 mi |
| Beebee Island Hydro Plant | Watertown, NY | 40.1 GWh | 3.1 mi |
| Black River | Black River, NY | 32.5 GWh | 7.4 mi |
| Carthage A | Carthage, NY | 7.6 GWh | 14.8 mi |
| Carthage B | Carthage, NY | 5.3 GWh | 14.9 mi |
| Copenhagen Wind Farm | Copenhagen, NY | 250.2 GWh | 14.4 mi |
| DANC LFGTE Facility | Rodman, NY | 25.5 GWh | 12.7 mi |
| Deferiet | Deferiet, NY | 40.2 GWh | 14.2 mi |
| Dexter Plant | Dexter, NY | 6.9 GWh | 4 mi |
| Diamond Island Plant | Watertown, NY | 1.8 GWh | 4 mi |
| Ellisburg | Adams, NY | 6.3 GWh | 15.2 mi |
| FFP - NY Game Farm CSG | Dexter, NY | 901.0 MWh | 2.5 mi |
| Jefferson-Lewis BOCES Solar | Watertown, NY | 2.6 GWh | 2.1 mi |
| Kamargo | Black River, NY | 21.3 GWh | 8.2 mi |
| Mereand CSG | Watertown, NY | 3.3 GWh | 2.8 mi |
| OYA Wayside Drive | Watertown, NY | 10.4 GWh | 2.3 mi |
| Sewalls | Watertown, NY | 11.7 GWh | 3.7 mi |
| St. Lawrence University - Sutton | Watertown, NY | 2.4 GWh | 6.5 mi |
| Tubolino CSG | Adams, NY | 4.2 GWh | 14 mi |
| Watertown | Watertown, NY | 19.2 GWh | 4.6 mi |