CH Resources Syracuse
300 Belle Island Road, Solvay, NY 13209Plant Summary Information
CH Resources Syracuse is ranked #76 out of 111 natural gas power plants in New York in terms of total annual net electricity generation.
CH Resources Syracuse is comprised of 2 generators and generated 437.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | CH Resources Syracuse |
---|---|
Utility Name | Lakeside Syracuse LLC |
Location | Onondaga County, NY |
Initial Operation Date | January 1994 |
Last Update | Dec 2024 |
Annual Generation | 16.1 GWh |
Annual Consumption | 136.9 k MMBtu |
Ranked #5,460 out of 12,299 Power Plants Nationwide | |
Ranked #1,428 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #229 out of 912 New York Power Plants | |
Ranked #76 out of 111 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of CH Resources Syracuse
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CH Resources Syracuse.
Monthly Net Generation for CH Resources Syracuse
CH Resources Syracuse Details
Summary Information | |
---|---|
Plant Name | CH Resources Syracuse (10621) |
Plant Address | 300 Belle Island Road, Solvay, NY 13209 |
Utility | Lakeside Syracuse LLC (58337) |
Latitude, Longitude | 43.0667, -76.2246 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | January 1994 |
Annual Generation | 16.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-43-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Onondaga CountyWater Authority |
Ash Impoundment | No |
Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NIAGARA MOHAWK DBA NATIONAL GRID |
Natural Gas Storage | No |
Generator GEN1 Details Operating January 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | NYISO Zone C |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NYISO Zone C |
Nameplate Capacity | 65.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 57.4 MW |
Winter Capacity | 73.1 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1994 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating January 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC01 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | NYISO Zone C |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NYISO Zone C |
Nameplate Capacity | 37.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 28.8 MW |
Winter Capacity | 28.8 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1994 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
CH Resources Syracuse Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1418 | DCO Burlington | Burlington, NJ | 16.8 GWh |
#1419 | Coffeyville | Coffeyville, KS | 16.8 GWh |
#1420 | Anson County Generation Facility | Lilesville, NC | 17.7 GWh |
#1421 | Digital Fairfield | Trumbull, CT | 16.5 GWh |
#1422 | Chowchilla II | Chowchilla, CA | 16.5 GWh |
#1423 | Certain Solar - Staten Island | Staten Island, NY | 16.4 GWh |
#1424 | Equinix San Jose | San Jose, CA | 16.4 GWh |
#1425 | CCCSD Wastewater Treatment Plnt | Martinez, CA | 16.4 GWh |
#1426 | One Patriot | Foxborough, MA | 16.3 GWh |
#1427 | Alabama Pine Pulp | Perdue Hill, AL | 404.2 GWh |
#1429 | POET Biorefining-Hanlontown, LLC | Hanlontown, IA | 16.1 GWh |
#1430 | Hagood | Charleston Heights, SC | 17.9 GWh |
#1431 | Altice - Hicksville | Hicksville, NY | 16.0 GWh |
#1432 | Altice - Parsippany | Parsippany-Troy Hills, NJ | 15.9 GWh |
#1433 | US Gypsum Oakfield | Oakfield, NY | 15.8 GWh |
#1434 | Haworth Water Treatment Plant | Haworth, NJ | 15.8 GWh |
#1435 | KSR028 Merced Fuel Cell | San Leandro, CA | 15.7 GWh |
#1436 | Medtronic - New Haven 2 | North Haven, CT | 15.7 GWh |
#1437 | J K Spruce | San Antonio, TX | 6.0 TWh |
#1438 | Western Sugar Coop - Scottsbluff | Scottsbluff, NE | 15.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CH Resources Syracuse.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anheuser-Busch Baldwinsville | Baldwinsville, NY | 2.8 GWh | 11.2 mi |
CAMILLUS A (CSG) | Camillus, NY | 1.1 GWh | 4.5 mi |
CAMILLUS B (CSG) | Camillus, NY | 1.0 GWh | 4.5 mi |
Carr Street Generating Station | East Syracuse, NY | 168.7 GWh | 7.2 mi |
Cicero Energy Storage 1 LLC | East Syracuse, NY | 7.0 GWh | 8.9 mi |
Cicero Energy Storage 2 LLC | East Syracuse, NY | 7.4 GWh | 9 mi |
Clay Solar CSG | Clay, NY | 8.4 GWh | 8.9 mi |
Clemons Road Solar | Minoa, NY | 1.0 GWh | 10.8 mi |
Manilus | Manilus, NY | 6.3 GWh | 10.2 mi |
NY Sorrell Hill II CSG | Baldwinsville, NY | 481.0 MWh | 8.6 mi |
NY Van Buren II CSG | Warners, NY | 2.9 GWh | 4.2 mi |
Onondaga County - Metro Water Board | Clay, NY | 1.1 GWh | 8.1 mi |
Onondaga County - Oak Orchard WWTP | Clay, NY | 2.5 GWh | 8.7 mi |
Onondaga County Resource Recovery | Jamesville, NY | 204.7 GWh | 7 mi |
Onondaga County- Jamesville | Jamesville, NY | 1.9 GWh | 9.8 mi |
Phoenix Hydro Project | Phoenix, NY | 9.1 GWh | 11.7 mi |
Source Power II - Taft CSG | East Syracuse, NY | 5.5 GWh | 10 mi |
Summit - Cicero | Brewerton, NY | 6.9 GWh | 10.6 mi |
Summit - Lysander (CSG) | Lysander, NY | 5.9 GWh | 7.1 mi |
Sunvestment Energy Group NY 63 LLC | East Syracuse, NY | 3.1 GWh | 9.3 mi |