Richard M Flynn
607 Union Ave, Holtsville, NY 11742Plant Summary Information
Richard M Flynn is ranked #38 out of 1,045 power plants in New York in terms of total annual net electricity generation.
Richard M Flynn is comprised of 2 generators and generated 75.4 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Richard M Flynn |
|---|---|
| Utility Name | New York Power Authority |
| Location | Suffolk County, NY |
| Initial Operation Date | May 1994 |
| Last Update | Dec 2025 |
| Annual Generation | 346.5 GWh |
| Annual Consumption | 3.1 M MMBtu |
| Ranked #1,837 out of 13,081 Power Plants Nationwide | |
| Ranked #637 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #38 out of 1,045 New York Power Plants | |
| Ranked #30 out of 114 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
Map of Richard M Flynn
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Richard M Flynn.
Monthly Net Generation for Richard M Flynn
Monthly Plant Fuel Consumption for Richard M Flynn
Richard M Flynn Details
| Summary Information | |
|---|---|
| Plant Name | Richard M Flynn (7314) |
| Plant Address | 607 Union Ave, Holtsville, NY 11742 |
| Utility | New York Power Authority (15296) |
| Latitude, Longitude | 40.8158, -73.064 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | May 1994 |
| Annual Generation | 346.5 GWh |
| Fuel Types | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Elec & Gas Co (15477) NJ |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | PUBLIC SERVICE ELECTRIC GAS CO |
| Natural Gas Storage | Yes |
| Liquefied Natural Gas Storage | No |
Generator NA1 Details Operating May 1994
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 110 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 139.5 MW |
| Winter Capacity | 160 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1994 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 135.5 MW |
| Net Winter Capacity With Natural Gas | 160 MW |
| Net Summer Capacity With Oil | 135.5 MW |
| Net Winter Capacity With Oil | 160 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator NA2 Details Operating May 1994
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 1 |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1994 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Richard M Flynn Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #627 | Beatrice | Beatrice, NE | 356.4 GWh |
| #628 | Walton County Energy Facility | Monroe, GA | 353.9 GWh |
| #629 | Selkirk Cogen | Selkirk, NY | 346.4 GWh |
| #630 | RED-Rochester, LLC | Rochester, NY | 345.8 GWh |
| #631 | Elwood Energy LLC | Elwood, IL | 345.0 GWh |
| #632 | HO Clarke Generating | Houston, TX | 340.3 GWh |
| #633 | Port Jefferson | Port Jefferson, NY | 416.1 GWh |
| #634 | Lake Catherine | Jones Mill, AR | 336.2 GWh |
| #635 | Big Sandy Peaker Plant | Kenona, WV | 329.8 GWh |
| #636 | Desert Star Energy Center | Boulder City, NV | 328.9 GWh |
| #638 | Clinch River | Cleveland, VA | 323.9 GWh |
| #639 | Plant 31 Paper Mill | West Monroe, LA | 514.8 GWh |
| #640 | Robert P Mone Plant | Convoy, OH | 327.9 GWh |
| #641 | Knox Lee | Longview, TX | 321.3 GWh |
| #642 | Paris Energy Center | Paris, TX | 320.9 GWh |
| #643 | Roseville Energy Park | Roseville, CA | 320.4 GWh |
| #644 | Humboldt Bay | Eureka, CA | 320.0 GWh |
| #645 | Waterford 1 & 2 | Killona, LA | 318.7 GWh |
| #646 | Blythe Energy Inc | Blythe, CA | 315.9 GWh |
| #647 | McIntosh (AL) | McIntosh, AL | 315.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Richard M Flynn.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blydenburgh Solar Project | Haupaugge, NY | 2.8 GWh | 6.2 mi |
| Brentwood Solar | Brentwood, NY | 687.0 MWh | 9.7 mi |
| Brookhaven Landfill Solar Farm 1 | Brookhaven, NY | 1.2 GWh | 7.4 mi |
| Caithness Long Island Energy Center | Yaphank, NY | 2.3 TWh | 6.5 mi |
| Calabro Airport North Solar Project | Shirley, NY | 2.4 GWh | 9.9 mi |
| Calabro Airport South Solar Project | Shirley, NY | 2.2 GWh | 10.8 mi |
| Cohalan | Central Islip, NY | 4.9 GWh | 7.8 mi |
| Deer Park | Deer Park, NY | 3.5 GWh | 7.8 mi |
| Holtsville | Holtsville, NY | 38.7 GWh | 0.1 mi |
| Holtsville Coast Solar Project | Holtsville, NY | 17.0 MWh | 2 mi |
| Holtsville Solar Project | Holtsville, NY | 2.0 GWh | 2 mi |
| Kings Park Solar I | Kings Park, NY | 2.4 GWh | 10.3 mi |
| Kings Park Solar II | Kings Park, NY | 2.5 GWh | 10.3 mi |
| Lincoln Ave Solar Project | Holbrook, NY | 3.0 GWh | 2.6 mi |
| MacArthur Waste to Energy Facility | Ronkonkoma, NY | 52.4 GWh | 3 mi |
| Orbit Bloom Fuel Cell | Medford, NY | 44.4 GWh | 5.1 mi |
| Port Jefferson | Port Jefferson, NY | 416.1 GWh | 9.3 mi |
| Riverhead | Riverhead, NY | 1.7 GWh | 8.8 mi |
| Stony Brook Cogen Plant | Stony Brook, NY | 284.6 GWh | 7.8 mi |
| SWM Fuel Cell | Yaphank, NY | 55.6 GWh | 7.2 mi |