NewYork-Presbyterian Brooklyn Methodist
506 6th Street, Brooklyn, NY 11215Plant Summary Information
NewYork-Presbyterian Brooklyn Methodist is ranked #48 out of 76 distillate fuel oil power plants in New York in terms of total annual net electricity generation.
NewYork-Presbyterian Brooklyn Methodist is comprised of 6 generators and generated 8.6 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | NewYork-Presbyterian Brooklyn Methodist |
|---|---|
| Utility Name | NewYork-Presbyterian Brooklyn Methodist Hospital |
| Location | Kings County, NY |
| Initial Operation Date | January 1991 |
| Last Update | Dec 2024 |
| Annual Generation | 25.0 MWh |
| Annual Consumption | 450 MMBtu |
| Ranked #12,340 out of 12,539 Power Plants Nationwide | |
| Ranked #1,015 out of 1,236 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #920 out of 944 New York Power Plants | |
| Ranked #48 out of 76 New York Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
| Previous Operator |
New York Methodist Hospital (2013 to 2020) NewYork-Presbyterian Brooklyn Methodist Hospital (2021 to 2024) |
Map of NewYork-Presbyterian Brooklyn Methodist
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NewYork-Presbyterian Brooklyn Methodist.
Monthly Net Generation for NewYork-Presbyterian Brooklyn Methodist
NewYork-Presbyterian Brooklyn Methodist Details
| Summary Information | |
|---|---|
| Plant Name | NewYork-Presbyterian Brooklyn Methodist (52091) |
| Plant Address | 506 6th Street, Brooklyn, NY 11215 |
| Utility | NewYork-Presbyterian Brooklyn Methodist Hospital (13484) |
| Latitude, Longitude | 40.6679, -73.9787 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | January 1991 |
| Annual Generation | 25.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Hospitals (622) |
| Sector | Commercial Non-CHP (4) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
| Grid Voltage | 480.00 kV |
| Energy Storage | No |
Generator 01-8N Details Operating January 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2006 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 02-8P Details Operating January 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2006 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 04-6Z Details Standby January 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | No |
|---|---|
| First Operation Date | January 2006 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 05-6Z Details Standby January 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | No |
|---|---|
| First Operation Date | January 2006 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 03-8L Details Operating January 2008
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2008 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CCHEG Details Standby June 2020
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | June 2020 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
NewYork-Presbyterian Brooklyn Methodist Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1005 | Newhalen | Iliamna, AK | 3.2 GWh |
| #1006 | Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 204.8 GWh |
| #1007 | Fennimore | Fennimore, WI | 27.0 MWh |
| #1008 | Osawatomie Power Plant North Sub | Osawatomie, KS | 27.0 MWh |
| #1009 | Ellinwood | Ellinwood, KS | 118.0 MWh |
| #1010 | Summit Street Power Plant | Kent, OH | 31.2 GWh |
| #1011 | Overall Road Station | Farmington, MO | 26.0 MWh |
| #1012 | State Farm | Bloomington, IL | 26.0 MWh |
| #1013 | Sibley No Two | Sibley, IA | 38.0 MWh |
| #1014 | The Bank of New York | New York, NY | 25.0 MWh |
| #1016 | IBM West | Rochester, MN | 25.0 MWh |
| #1017 | Sibley One | Sibley, IA | 42.0 MWh |
| #1018 | Erie | Erie, KS | 24.5 MWh |
| #1019 | Ashland | Ashland, KS | 24.0 MWh |
| #1020 | Wilber | Wilber, NE | 24.0 MWh |
| #1021 | Valley Queen Cheese | Milbank, SD | 24.0 MWh |
| #1022 | West Campus Steam Plant | University Park, PA | 46.3 GWh |
| #1023 | Good Samaritan Hospital | Suffern, NY | 25.0 MWh |
| #1024 | Windom | Windom, MN | 23.0 MWh |
| #1025 | Stryker | Stryker, OH | 23.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NewYork-Presbyterian Brooklyn Methodist.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brooklyn Hospital Center | Brooklyn, NY | 8.0 MWh | 1.6 mi |
| Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 1.9 TWh | 2.2 mi |
| East River | New York, NY | 2.7 TWh | 4.2 mi |
| Gowanus Gas Turbines Generating | Brooklyn, NY | 10.9 GWh | 1.4 mi |
| Joseph J Seymour Power Project | Brooklyn, NY | 104.2 GWh | 1.2 mi |
| Kings Plaza Total Energy Plant (TEP) | Brooklyn, NY | 22.4 GWh | 5 mi |
| Kingsbrook Jewish Medical Center | Brooklyn, NY | 30.0 MWh | 2.4 mi |
| Maimonides Medical Center | Brooklyn, NY | 21.0 MWh | 2.2 mi |
| Mount Sinai Beth Israel | New York, NY | 62.0 MWh | 4.5 mi |
| Narrows Gas Turbines Generating | Brooklyn, NY | 39.6 GWh | 2.6 mi |
| NHH003 Clarkson Fuel Cell | Brooklyn, NY | 8.8 GWh | 2 mi |
| NHH004 Winthrop Fuel Cell | Brooklyn, NY | 8.0 GWh | 1.8 mi |
| North 1st | Brooklyn, NY | 67.6 GWh | 3.5 mi |
| NYC-HH-New Bellevue Hospital | New York, NY | 71.0 MWh | 5 mi |
| NYP-Lower Manhattan Hospital | New York, NY | 18.0 MWh | 3.2 mi |
| NYU LANGONE HEALTH | New York, NY | 46.1 GWh | 5.5 mi |
| NYU Langone Hospital- Brooklyn | New York City, NY | 486.0 MWh | 2.7 mi |
| SDM000 Clarkson Fuel Cell | Brooklyn, NY | 13.6 GWh | 2 mi |
| The Bank of New York | New York, NY | 25.0 MWh | 2.4 mi |
| Woodhull Hospital | Brooklyn, NY | 162.0 MWh | 3.2 mi |