Directory of Power Plants in Michigan
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Gratiot Wind Park | DTE Electric Company | Breckenridge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 214.1 GWh | Oct 2011 | May 2026 | Wind |
| Greenwood Solar Farm | DTE Electric Company | Avoca, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2015 | May 2026 | Solar |
| Greenwood (MI) | DTE Electric Company | Avoca, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 TWh | Jun 1979 | May 2026 | Natural Gas |
| Big Turtle Wind Farm 2 | DTE Electric Company | Harbor Beach, MI | Midcontinent Independent System Operator, Inc. (MISO) | 103.8 GWh | Sep 2016 | Dec 2025 | Wind |
| Meridian Wind Park | DTE Electric Company | Merrill, MI | Midcontinent Independent System Operator, Inc. (MISO) | 478.6 GWh | Mar 2023 | May 2026 | Wind |
| Fish Creek Solar Park | DTE Electric Company | Greenville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 48.8 GWh | - | May 2026 | Solar |
| Mission Road Solar Park | DTE Electric Company | Rosebush, MI | Midcontinent Independent System Operator, Inc. (MISO) | 60.4 GWh | - | May 2026 | Solar |
| Polaris Solar Park | DTE Electric Company | Ashley, MI | Midcontinent Independent System Operator, Inc. (MISO) | 122.8 GWh | Jun 2025 | May 2026 | Solar |
| Isabella Wind Park | DTE Electric Company | Rosebush, MI | Midcontinent Independent System Operator, Inc. (MISO) | 809.3 GWh | May 2021 | May 2026 | Wind |
| Pine River Solar Park | DTE Electric Company | Alma, MI | Midcontinent Independent System Operator, Inc. (MISO) | 125.7 GWh | May 2025 | May 2026 | Solar |
| Sauk Solar Park | DTE Electric Company | Union City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 228.5 GWh | Dec 2024 | May 2026 | Solar |
| Fairbanks Wind Park | DTE Electric Company | Garden, MI | Midcontinent Independent System Operator, Inc. (MISO) | 181.7 GWh | Dec 2021 | May 2026 | Wind |
| Wilmot | DTE Electric Company | Kingston Twp, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 1968 | Apr 2026 | Distillate Fuel Oil |
| Polaris Wind Park | DTE Electric Company | North Star Township, MI | Midcontinent Independent System Operator, Inc. (MISO) | 455.2 GWh | Apr 2020 | May 2026 | Wind |
| Dearborn Energy Center | DTE Electric Company | Dearborn, MI | Midcontinent Independent System Operator, Inc. (MISO) | 237.3 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| Superior | DTE Electric Company | Superior Twp, MI | Midcontinent Independent System Operator, Inc. (MISO) | 789.0 MWh | Sep 1966 | Dec 2025 | Distillate Fuel Oil |
| Blue Water Energy Center | DTE Electric Company | East China, MI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 TWh | May 2022 | May 2026 | Natural Gas |
| St Clair | DTE Electric Company | East China Twp, MI | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 GWh | Jul 1953 | May 2026 | Distillate Fuel Oil : 52.4% Natural Gas : 47.6% |
| Pine River Wind Park | DTE Electric Company | Shepherd, MI | Midcontinent Independent System Operator, Inc. (MISO) | 379.8 GWh | Feb 2019 | May 2026 | Wind |
| Putnam (MI) | DTE Electric Company | Mayville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 129.0 MWh | May 1971 | Dec 2025 | Distillate Fuel Oil |
| O'Shea Solar Farm | DTE Electric Company | Detroit, MI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jun 2017 | Dec 2025 | Solar |
| Turrill Solar Farm | DTE Electric Company | Lapeer, MI | Midcontinent Independent System Operator, Inc. (MISO) | 20.2 GWh | Apr 2017 | Dec 2025 | Solar |
| Demille Solar Farm | DTE Electric Company | Lapeer, MI | Midcontinent Independent System Operator, Inc. (MISO) | 37.5 GWh | Apr 2017 | May 2026 | Solar |
| Placid 12 | DTE Electric Company | Clarkston, MI | Midcontinent Independent System Operator, Inc. (MISO) | 243.0 MWh | Oct 1970 | Dec 2025 | Distillate Fuel Oil |
| Northeast (MI) | DTE Electric Company | Warren, MI | Midcontinent Independent System Operator, Inc. (MISO) | 14.8 GWh | Apr 1966 | Dec 2025 | Natural Gas : 86.8% Distillate Fuel Oil : 13.2% |
| Domino Farms Solar | DTE Electric Company | Ann Arbor, MI | Midcontinent Independent System Operator, Inc. (MISO) | 844.0 MWh | Aug 2015 | May 2026 | Solar |
| Heritage Garden Wind Farm I LLC | DTE Sustainable Generation | Garden, MI | Midcontinent Independent System Operator, Inc. (MISO) | 71.0 GWh | Aug 2012 | Dec 2025 | Wind |
| Big Turtle Wind Farm, LLC | DTE Sustainable Generation | Harbor Beach, MI | Midcontinent Independent System Operator, Inc. (MISO) | 75.6 GWh | Nov 2014 | Dec 2025 | Wind |
| Garden 2 Solar Park | DTE Sustainable Generation | Garden Township, MI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | May 2022 | Dec 2025 | Solar |
| Garden 1 Solar Park | DTE Sustainable Generation | Garden Township, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Aug 2016 | Dec 2025 | Solar |
| Stoney Corners Wind Farm | DTE Sustainable Generation | McBain, MI | Midcontinent Independent System Operator, Inc. (MISO) | 125.3 GWh | Nov 2009 | Dec 2025 | Wind |
| Menominee Mill Marinette | Eagle Creek Renewable Energy, LLC | Menominee, MI | Midcontinent Independent System Operator, Inc. (MISO) | 9.6 GWh | Dec 1923 | May 2026 | Water |
| Ada Dam | Eagle Creek Renewable Energy, LLC | Ada, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 1984 | Dec 2025 | Water |
| Cascade Dam (MI) | Eagle Creek Renewable Energy, LLC | Grand Rapids, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 1986 | Dec 2025 | Water |
| French Landing Dam | Eagle Creek Renewable Energy, LLC | Belleville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Nov 1988 | Dec 2025 | Water |
| Norway Point Hydropower Project | Eagle Creek Renewable Energy, LLC | Alpena, MI | Midcontinent Independent System Operator, Inc. (MISO) | 13.0 GWh | Aug 1990 | Dec 2025 | Water |
| Four Mile Hydropower Project | Eagle Creek Renewable Energy, LLC | Alpena, MI | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Aug 1990 | Dec 2025 | Water |
| Ninth Street Hydropower Project | Eagle Creek Renewable Energy, LLC | Alpena, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Aug 1990 | Dec 2025 | Water |
| East. Michigan Univ. Heating Plant | East. Michigan Univ. Heating Plant | Ypsilanti, MI | Midcontinent Independent System Operator, Inc. (MISO) | 33.1 GWh | Sep 1987 | Dec 2025 | Natural Gas |
| Alverno Hydro Plant | Energen Renewables, LLC | Cheboygan, MI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Dec 1959 | Dec 2025 | Water |
| Pinconning White Feather | Energy Developments, Inc d/b/a EDL | Pinconning, MI | Midcontinent Independent System Operator, Inc. (MISO) | 16.1 GWh | Feb 2009 | Dec 2025 | Landfill Gas |
| Grand River | Energy Developments, Inc d/b/a EDL | Grand Ledge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Mar 1991 | Dec 2025 | Landfill Gas |
| Coopersville | Energy Developments, Inc d/b/a EDL | Coopersville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 37.9 GWh | May 1994 | Dec 2025 | Landfill Gas |
| Grand Blanc Generating Station | Energy Developments, Inc d/b/a EDL | Grand Blanc, MI | Midcontinent Independent System Operator, Inc. (MISO) | 50.2 GWh | Jun 1994 | Dec 2025 | Landfill Gas |
| Watervliet | Energy Developments, Inc d/b/a EDL | Watervliet, MI | Midcontinent Independent System Operator, Inc. (MISO) | 25.8 GWh | Jan 2013 | Dec 2025 | Landfill Gas |
| Brent Run Generating Station | Energy Developments, Inc d/b/a EDL | Montrose, MI | Midcontinent Independent System Operator, Inc. (MISO) | 49.8 GWh | Dec 1997 | Dec 2025 | Landfill Gas |
| Bryon Center | Energy Developments, Inc d/b/a EDL | Byron Center, MI | Midcontinent Independent System Operator, Inc. (MISO) | 30.8 GWh | Feb 2009 | Dec 2025 | Landfill Gas |
| French Paper Hydro | French Paper Co | Niles, MI | PJM Interconnection, LLC (PJM) | 2.6 GWh | Dec 1920 | Dec 2025 | Water |
| GRS Arbor Hills | Gas Recovery Systems Inc | Northville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | May 1996 | Mar 2026 | Landfill Gas |
| GRS C&C | Gas Recovery Systems Inc | Marshall, MI | Midcontinent Independent System Operator, Inc. (MISO) | 21.0 GWh | Jan 1995 | Dec 2025 | Landfill Gas |
| Geddes 1 Solar, LLC | Geddes 1 Solar, LLC | Saginaw, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Geddes 2 Solar, LLC | Geddes 2 Solar, LLC | Saginaw, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Dec 2020 | Dec 2025 | Solar |
| Fremont Community Digester, LLC | Generate Fremont Digester, LLC. | Newaygo, MI | Midcontinent Independent System Operator, Inc. (MISO) | 375.0 MWh | Nov 2012 | Dec 2024 | Other Biomass Gas |
| Genesee Solar Project | Genesee Solar Energy, LLC | Flint, MI | Midcontinent Independent System Operator, Inc. (MISO) | 29.1 GWh | Nov 2025 | May 2026 | Solar |
| Temperance Solar, LLC | Geronimo Power | Erie, MI | Midcontinent Independent System Operator, Inc. (MISO) | 42.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Bingham Solar, LLC | Geronimo Power | St. Johns, MI | Midcontinent Independent System Operator, Inc. (MISO) | 41.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Beaver Island | Great Lakes Energy Coop | Beaver Island, MI | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | Aug 2000 | Dec 2025 | Distillate Fuel Oil |
| Electric City Solar | Greenbacker Renewable Energy Corporation | Sturgis, MI | PJM Interconnection, LLC (PJM) | 23.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Surrey Road | Greenbacker Renewable Energy Corporation | Clare, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Dec 2024 | Dec 2025 | Solar |
| Morey Road | Greenbacker Renewable Energy Corporation | Lake City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Oct 2024 | Dec 2025 | Solar |
| Lake City | Greenbacker Renewable Energy Corporation | Lake City, MI | PJM Interconnection, LLC (PJM) | 4.0 GWh | Oct 2024 | Dec 2025 | Solar |
| Greenstone Solar, LLC | Greenstone Solar, LLC | Coldwater, MI | Midcontinent Independent System Operator, Inc. (MISO) | 35.4 GWh | Sep 2023 | Dec 2025 | Solar |
| Harvest 2 | Harvest II Windfarm, LLC | Elkton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 199.0 GWh | Oct 2012 | Dec 2025 | Wind |
| Harvest | Harvest Windfarm, LLC | Elkton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 116.6 GWh | Dec 2007 | Dec 2025 | Wind |
| Hazel Solar, LLC | Hazel Solar, LLC | Howard City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jan 2021 | Dec 2025 | Solar |
| Heartwood Solar | Heartwood Solar, LLC | Allen, MI | Midcontinent Independent System Operator, Inc. (MISO) | 21.6 GWh | - | May 2026 | Solar |
| Hendershot Solar, LLC | Hendershot Solar, LLC | Tecumseh, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Dec 2020 | Dec 2025 | Solar |
| Green Lake Solar | Heritage Sustainable Energy. LLC | Interlochen, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Sep 2018 | Dec 2025 | Solar |
| TCLP Solar Phase 1 | Heritage Sustainable Energy. LLC | Traverse City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Sep 2017 | Dec 2025 | Solar |
| M72 West Solar | Heritage Sustainable Energy. LLC | Traverse City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Pickford Solar | Heritage Sustainable Energy. LLC | Pickford, MI | Midcontinent Independent System Operator, Inc. (MISO) | 9.4 GWh | Jan 2021 | Dec 2025 | Solar |
| Hillsdale | Hillsdale Board of Public Wks | Hillsdale, MI | Midcontinent Independent System Operator, Inc. (MISO) | 711.0 MWh | Feb 1947 | Dec 2025 | Natural Gas : 81.9% Distillate Fuel Oil : 18.1% |
| IKEA Canton Rooftop PV System | IKEA Property Inc | Canton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 264.0 MWh | Oct 2015 | Dec 2025 | Solar |
| Indeck Niles Energy Center | Indeck Niles, LLC | Niles, MI | PJM Interconnection, LLC (PJM) | 7.0 TWh | Jun 2022 | May 2026 | Natural Gas |
| Donald C Cook | Indiana Michigan Power Co | Bridgman, MI | PJM Interconnection, LLC (PJM) | 18.5 TWh | Jul 1975 | May 2026 | Nuclear |
| Constantine | Indiana Michigan Power Co | Constantine, MI | PJM Interconnection, LLC (PJM) | 3.9 GWh | Dec 1922 | Dec 2025 | Water |
| Watervliet PV | Indiana Michigan Power Co | Watervliet, MI | PJM Interconnection, LLC (PJM) | 7.2 GWh | Oct 2016 | Dec 2025 | Solar |
| Berrien Springs | Indiana Michigan Power Co | Berrien Springs, MI | PJM Interconnection, LLC (PJM) | 27.3 GWh | Dec 1995 | Dec 2025 | Water |
| Buchanan (MI) | Indiana Michigan Power Co | Buchanan, MI | PJM Interconnection, LLC (PJM) | 13.0 GWh | Dec 1918 | Dec 2025 | Water |
| Mottville | Indiana Michigan Power Co | White Pigeon, MI | PJM Interconnection, LLC (PJM) | 5.3 GWh | Dec 1922 | Dec 2025 | Water |
| Interchange Solar, LLC | Interchange Solar, LLC | Mt. Morris, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Gratiot County Wind LLC | Invenergy Services LLC | Breckenridge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 262.3 GWh | Apr 2012 | Dec 2025 | Wind |
| Calhoun Solar | Invenergy Services LLC | Battle Creek, MI | Midcontinent Independent System Operator, Inc. (MISO) | 368.8 GWh | Nov 2022 | May 2026 | Solar |
| Jack Francis Solar, LLC | Jack Francis Solar, LLC | Clio, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2020 | Dec 2025 | Solar |
| Kent County Waste to Energy Facility | Kent County - (MI) | Grand Rapids, MI | Midcontinent Independent System Operator, Inc. (MISO) | 94.0 GWh | Sep 1989 | Apr 2026 | Non-biogenic Municipal Solid Waste : 54.7% Biogenic Municipal Solid Waste : 44.7% Natural Gas : 0.6% |
| John H Warden | L'Anse Warden Electric Company LLC | L'Anse, MI | Midcontinent Independent System Operator, Inc. (MISO) | 110.6 GWh | Jul 1959 | Dec 2024 | Wood/Wood Waste Solids : 87.2% Tire-derived Fuels : 12.6% |
| Alpena Cement Plant | Lafarge Corp | Alpena, MI | Midcontinent Independent System Operator, Inc. (MISO) | 205.9 GWh | Dec 1951 | May 2026 | Petroleum Coke : 86.8% Natural Gas : 13.2% |
| Lansing BWL REO Town Plant | Lansing Board of Water and Light | Lansing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 477.2 GWh | Jun 2013 | Dec 2025 | Natural Gas |
| Delta Energy Park | Lansing Board of Water and Light | Lansing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 TWh | Feb 2022 | May 2026 | Natural Gas |
| Lightfoot Solar, LLC | Lightfoot Solar, LLC | Luzerne, MI | Midcontinent Independent System Operator, Inc. (MISO) | 18.1 GWh | Sep 2023 | Dec 2025 | Solar |
| Lorin Industries | Lorin Industries | Muskegon, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Dec 1989 | Dec 2025 | Natural Gas |
| Lyons Road | Lyons Road Solar, LLC | Owosso, MI | Midcontinent Independent System Operator, Inc. (MISO) | 41.3 GWh | Dec 2021 | Dec 2025 | Solar |
| Macbeth Solar | Macbeth Solar, LLC | Montague, MI | Midcontinent Independent System Operator, Inc. (MISO) | 37.6 GWh | Apr 2022 | Dec 2025 | Solar |
| May Shannon Solar, LLC | May Shannon Solar, LLC | Clio, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Michigan Power LP | Michigan Power Limited Partnership | Ludington, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Sep 1995 | Dec 2024 | Natural Gas |
| Kalkaska CT #1 | Michigan Public Power Agency | Kalkaska, MI | Midcontinent Independent System Operator, Inc. (MISO) | 57.6 GWh | Nov 2002 | Dec 2025 | Natural Gas |
| T B Simon Power Plant | Michigan State University | East Lansing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 262.8 GWh | Nov 1965 | May 2026 | Natural Gas |
| MSC Sebewaing | Michigan Sugar Company | Sebewaing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 509.0 MWh | Sep 1979 | Mar 2026 | Bituminous Coal : 67.9% Natural Gas : 32.1% |
| MSC Croswell | Michigan Sugar Company | Croswell, MI | Midcontinent Independent System Operator, Inc. (MISO) | 35.9 MWh | Sep 1948 | Jan 2025 | Natural Gas |
| Michigan Wind 1 | Michigan Wind 1, LLC | Ubly, MI | Midcontinent Independent System Operator, Inc. (MISO) | 164.9 GWh | Nov 2008 | Dec 2025 | Wind |