Big Turtle Wind Farm 2
8661 Sand Beach Rd, Harbor Beach, MI 48441Plant Summary Information
Big Turtle Wind Farm 2 is ranked #31 out of 34 wind farms in Michigan in terms of total annual net electricity generation.
Big Turtle Wind Farm 2 generated 34.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Big Turtle Wind Farm 2 |
|---|---|
| Utility Name | DTE Electric Company |
| Location | Huron County, MI |
| Initial Operation Date | October 2016 |
| Last Update | Dec 2024 |
| Annual Generation | 106.9 GWh |
| Annual Consumption | 395.1 k MMBtu |
| Ranked #3,325 out of 12,539 Power Plants Nationwide | |
| Ranked #883 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #79 out of 263 Michigan Power Plants | |
| Ranked #31 out of 34 Michigan Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Heritage Garden Wind Farm I LLC (2021 to 2021) Heritage Sustainable Energy. LLC (2022 to 2022) DTE Electric Company (2023 to 2024) |
Map of Big Turtle Wind Farm 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Turtle Wind Farm 2.
Monthly Net Generation for Big Turtle Wind Farm 2
Big Turtle Wind Farm 2 Details
| Summary Information | |
|---|---|
| Plant Name | Big Turtle Wind Farm 2 (65143) |
| Plant Address | 8661 Sand Beach Rd, Harbor Beach, MI 48441 |
| Utility | DTE Electric Company (5109) |
| Latitude, Longitude | 43.91956, -82.79443 |
| Generation Dates on File | Jan 2021 to Dec 2024 |
| Initial Operation Date | October 2016 |
| Annual Generation | 106.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | International Transmission Company DBA I (56068) |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator BTWF2 Details Operating October 2016
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 29.4 MW |
| Summer Capacity | 29.4 MW |
| Winter Capacity | 29.4 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2016 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 14 |
| Turbine Details | |
| Number Of Turbines | 14 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G114-2.0 |
| Design Wind Speed | 16.7 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 305 |
Big Turtle Wind Farm 2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #873 | Community Wind North LLC | Verdi Township, MN | 114.7 GWh |
| #874 | Storm Lake II | Alta, IA | 114.2 GWh |
| #875 | Pakini Nui Wind Farm | Naalehu, HI | 112.0 GWh |
| #876 | Minden Wind Park | Minden City, MI | 111.1 GWh |
| #877 | Spion Kop Wind Farm | Geyser, MT | 110.8 GWh |
| #878 | Dry Lake Wind LLC | Heber, AZ | 110.3 GWh |
| #879 | Luverne Wind Energy Center | Luverne, ND | 110.1 GWh |
| #880 | Howard Wind Farm | Hornell, NY | 109.1 GWh |
| #881 | Sterling I Wind Farm | Tatum, NM | 108.6 GWh |
| #882 | Great Plains Windpark LLC | Spearman, TX | 107.1 GWh |
| #884 | Poseidon Wind, LLC | Herber, AZ | 106.8 GWh |
| #885 | Silver Sage Windpower | Cheyenne, WY | 104.1 GWh |
| #886 | Crofton Bluffs Wind LLC | Bloomfield, NE | 103.8 GWh |
| #887 | Roth Rock Wind Farm LLC | Oakland, MD | 102.7 GWh |
| #888 | Central Plains Wind Farm | Marienthal, KS | 102.2 GWh |
| #889 | Whirlwind Energy Center | Floydada, TX | 101.5 GWh |
| #890 | Mountaineer Wind Energy Center | Thomas, WV | 100.7 GWh |
| #891 | Buffalo Ridge I LLC | Elkton, SD | 99.6 GWh |
| #892 | 85 B | Tehachapi, CA | 97.6 GWh |
| #893 | Big Horn Wind II | Bickleton, WA | 97.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Turtle Wind Farm 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apple Blossom Wind Farm | Pigeon, MI | 262.4 GWh | 26.9 mi |
| Big Turtle Wind Farm, LLC | Harbor Beach, MI | 69.9 GWh | 4.8 mi |
| Brookfield | Pigeon, MI | 255.0 GWh | 27.5 mi |
| Cross Winds Energy Park | Unionville, MI | 720.9 GWh | 40.6 mi |
| Deerfield Wind Energy 2 | Port Hope, MI | 319.1 GWh | 4 mi |
| Deerfield Wind Energy, LLC | Kinde, MI | 485.5 GWh | 5.4 mi |
| Echo Wind Park | Elkton, MI | 582.8 GWh | 18.4 mi |
| Harvest | Elkton, MI | 115.8 GWh | 21.4 mi |
| Harvest 2 | Elkton, MI | 201.8 GWh | 19.1 mi |
| Main Street (MI) | Sebewaing, MI | 1.0 MWh | 35.3 mi |
| McKinley Wind Park | Pigeon, MI | 52.4 GWh | 22.5 mi |
| Michigan Wind 1 | Ubly, MI | 157.5 GWh | 16.8 mi |
| Michigan Wind 2 | Minden City, MI | 326.6 GWh | 17.9 mi |
| Minden Wind Park | Minden City, MI | 111.1 GWh | 17.3 mi |
| MSC Sebewaing | Sebewaing, MI | 569.0 MWh | 34.8 mi |
| Pheasant Run Wind LLC | Pigeon, MI | 257.1 GWh | 27.5 mi |
| Pine Street | Sebewaing, MI | 14.3 GWh | 34.9 mi |
| Sigel Wind Park | Harbor Beach, MI | 256.8 GWh | 4.8 mi |
| Ubly | Ubly, MI | 11.8 MWh | 15.4 mi |
| Wilmot | Kingston Twp, MI | 353.0 MWh | 37.6 mi |