2254 S Caseville Road, Pigeon, MI 48755Plant Summary Information
Brookfield is ranked #46 out of 263 power plants in Michigan in terms of total annual net electricity generation.
Brookfield generated 29.8 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Brookfield |
|---|---|
| Utility Name | DTE Electric Company |
| Location | Huron County, MI |
| Initial Operation Date | February 2014 |
| Last Update | Sep 2025 |
| Annual Generation | 255.0 GWh |
| Annual Consumption | 907.6 k MMBtu |
| Ranked #2,173 out of 12,539 Power Plants Nationwide | |
| Ranked #657 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #46 out of 263 Michigan Power Plants | |
| Ranked #20 out of 34 Michigan Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Pheasant Run Wind II, LLC (2013 to 2013) DTE Electric Company (2014 to 2024) |
Map of Brookfield
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brookfield.
Monthly Net Generation for Brookfield
Brookfield Details
| Summary Information | |
|---|---|
| Plant Name | Brookfield (58719) |
| Plant Address | 2254 S Caseville Road, Pigeon, MI 48755 |
| Utility | DTE Electric Company (5109) |
| Latitude, Longitude | 43.75778, -83.29778 |
| Generation Dates on File | Feb 2014 to Sep 2025 |
| Initial Operation Date | February 2014 |
| Annual Generation | 255.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | ITC Transmission (56068) MI |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WPH2 Details Operating February 2014
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 74.8 MW |
| Summer Capacity | 74.8 MW |
| Winter Capacity | 74.8 MW |
| Minimum Load | 7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 44 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 44 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.6-100 |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 328 |
Brookfield Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #647 | Rising Tree Wind Farm III | Mojave, CA | 261.4 GWh |
| #648 | Keenan II Renewable Energy Co LLC | Woodward, OK | 260.6 GWh |
| #649 | Wapsipinicon Wind Project | Dexter, MN | 259.7 GWh |
| #650 | Rocky Ridge Wind Project | Hobart, OK | 259.5 GWh |
| #651 | EcoGrove Wind LLC | Lena, IL | 258.0 GWh |
| #652 | Sendero | Hebbronville, TX | 257.7 GWh |
| #653 | Pheasant Run Wind LLC | Pigeon, MI | 257.1 GWh |
| #654 | FPL Energy Vansycle LLC (OR) | Touchet, OR | 257.0 GWh |
| #655 | Sigel Wind Park | Harbor Beach, MI | 256.8 GWh |
| #656 | Stillwater Wind, LLC | Reed Point, MT | 256.1 GWh |
| #658 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 254.6 GWh |
| #659 | Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh |
| #660 | Broken Bow Wind II, LLC | Broken Bow, NE | 253.6 GWh |
| #661 | Penascal II Wind Project LLC | Sarita, TX | 253.4 GWh |
| #662 | South Trent Wind Farm | Sweetwater, TX | 252.5 GWh |
| #663 | Ironwood Wind | Spearville, KS | 251.7 GWh |
| #664 | Red Barn Energy | Montfort, WI | 251.6 GWh |
| #665 | Hancock County Wind Energy Center | Garner, IA | 251.5 GWh |
| #666 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
| #667 | Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brookfield.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apple Blossom Wind Farm | Pigeon, MI | 262.4 GWh | 4 mi |
| Caro | Caro, MI | 5.9 MWh | 20.2 mi |
| Cross Winds Energy Park | Unionville, MI | 720.9 GWh | 13.9 mi |
| Deerfield Wind Energy 2 | Port Hope, MI | 319.1 GWh | 24.2 mi |
| Deerfield Wind Energy, LLC | Kinde, MI | 485.5 GWh | 23.6 mi |
| Echo Wind Park | Elkton, MI | 582.8 GWh | 11 mi |
| Harvest | Elkton, MI | 115.8 GWh | 6.8 mi |
| Harvest 2 | Elkton, MI | 201.8 GWh | 9.4 mi |
| Main Street (MI) | Sebewaing, MI | 1.0 MWh | 8 mi |
| McKinley Wind Park | Pigeon, MI | 52.4 GWh | 8.4 mi |
| Michigan Wind 1 | Ubly, MI | 157.5 GWh | 17 mi |
| MSC Sebewaing | Sebewaing, MI | 569.0 MWh | 7.5 mi |
| Pegasus Wind | Reese, MI | 392.1 GWh | 23.6 mi |
| Pheasant Run Wind LLC | Pigeon, MI | 257.1 GWh | 0 mi |
| Pine Street | Sebewaing, MI | 14.3 GWh | 7.7 mi |
| POET Biorefining Caro, LLC | Caro, MI | 14.3 GWh | 20.5 mi |
| Tuscola Bay Wind | Reese, MI | 367.1 GWh | 23.8 mi |
| Tuscola Wind II LLC | Reese, MI | 300.6 GWh | 20.9 mi |
| Ubly | Ubly, MI | 11.8 MWh | 18.1 mi |
| Wilmot | Kingston Twp, MI | 353.0 MWh | 21.5 mi |