Pine River Wind Park
318 West Wright Ave, Shepherd, MI 48883Plant Summary Information
Pine River Wind Park is ranked #35 out of 258 power plants in Michigan in terms of total annual net electricity generation.
Pine River Wind Park generated 128.5 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Pine River Wind Park |
---|---|
Utility Name | DTE Electric Company |
Location | Isabella County, MI |
Initial Operation Date | March 2019 |
Last Update | Mar 2025 |
Annual Generation | 354.1 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,692 out of 12,288 Power Plants Nationwide | |
Ranked #509 out of 1,353 Wind Power Plants Nationwide | |
Ranked #35 out of 258 Michigan Power Plants | |
Ranked #12 out of 35 Michigan Wind Power Plants | |
Fuel Types | Wind |
Map of Pine River Wind Park
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pine River Wind Park.
Monthly Net Generation for Pine River Wind Park
Pine River Wind Park Details
Summary Information | |
---|---|
Plant Name | Pine River Wind Park (61106) |
Plant Address | 318 West Wright Ave, Shepherd, MI 48883 |
Utility | DTE Electric Company (5109) |
Latitude, Longitude | 43.52432, -84.69678 |
Generation Dates on File | Mar 2019 to Mar 2025 |
Initial Operation Date | March 2019 |
Annual Generation | 354.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Midwest LLC (56161) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 161.3 MW |
Summer Capacity | 161.3 MW |
Winter Capacity | 161.3 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 65 |
Other Combustion Technology | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 65 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.5-116 |
Design Wind Speed | 13.4 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 295 |
Pine River Wind Park Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#499 | Stoneray Power Partners, LLC | Woodstock, MN | 358.9 GWh |
#500 | Garden Wind LLC | Zearing, IA | 358.4 GWh |
#501 | Benton County Wind Farm | Earl Park, IN | 357.6 GWh |
#502 | Vansycle II Wind Energy Center | Athena, OR | 357.3 GWh |
#503 | Buckthorn Wind | Mingus, TX | 357.1 GWh |
#504 | Seiling Wind II | Seiling, OK | 356.1 GWh |
#505 | Arbuckle Mountain Wind Farm LLC | Davis, OK | 355.9 GWh |
#506 | Mesquite Wind Power LLC | Abilene, TX | 355.3 GWh |
#507 | Colorado Highlands Wind | Fleming, CO | 355.0 GWh |
#508 | Oakfield Wind Project | City of Oakfield, ME | 354.9 GWh |
#510 | Settlers Trail Wind Farm LLC | Sheldon, IL | 353.9 GWh |
#511 | Shady Oaks Wind 2 | Compton, IL | 352.9 GWh |
#512 | Baron Winds Farm | Cohocton, NY | 352.6 GWh |
#513 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 351.8 GWh |
#514 | High Lonesome Mesa LLC | Willard, NM | 351.7 GWh |
#515 | Ivester Wind Farm | Wellsburg, IA | 347.9 GWh |
#516 | Duran Mesa LLC | Duran, NM | 347.6 GWh |
#517 | Sac County Wind, LLC | Sac City, IA | 345.5 GWh |
#518 | Peyton Creek Wind Farm LLC | Bay City, TX | 344.8 GWh |
#519 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pine River Wind Park.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beebe 1A | Ithaca, MI | 187.0 GWh | 21 mi |
Beebe 1B | Ithaca, MI | 127.0 GWh | 21 mi |
Bingham Solar, LLC | St. Johns, MI | 41.0 GWh | 36.4 mi |
Central Michigan University | Mt. Pleasant, MI | 25.5 GWh | 6.2 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 2.6 GWh | 29.7 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 2.9 GWh | 29.7 mi |
Gratiot County Wind LLC | Breckenridge, MI | 228.4 GWh | 14.2 mi |
Gratiot Farms Wind Project | Carson City, MI | 375.2 GWh | 25.9 mi |
Gratiot Wind Park | Breckenridge, MI | 227.0 GWh | 11.8 mi |
Heartland Farms | Middleton, MI | 484.6 GWh | 21.7 mi |
Isabella Wind Park | Rosebush, MI | 917.2 GWh | 12 mi |
Meridian Wind Park | Merrill, MI | 506.4 GWh | 18.4 mi |
Midland Cogeneration Venture | Midland, MI | 10.3 TWh | 24 mi |
Polaris Wind Park | North Star Township, MI | 443.3 GWh | 20.6 mi |
Renaissance Power Plant | Carson City, MI | 1.0 TWh | 24.5 mi |
St Louis | St. Louis, MI | 29.0 MWh | 9.7 mi |
Stoneheart Solar, LLC | Saginaw, MI | 4.0 GWh | 35.1 mi |
Vestaburg | Vestaburg, MI | 2.3 GWh | 13.8 mi |
Waste Management Northern Oaks LFGTE | Harrison, MI | 5.9 GWh | 32.6 mi |
Willford Solar, LLC | Gladwin, MI | 1.1 GWh | 33.2 mi |