Genesee Solar Project
TBD, Flint, MI 48505Plant Summary Information
Genesee Solar Project is ranked #18 out of 76 solar farms in Michigan in terms of total annual net electricity generation.
Genesee Solar Project generated 23.6 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Genesee Solar Project |
|---|---|
| Utility Name | Genesee Solar Energy, LLC |
| Location | Genesee County, MI |
| Initial Operation Date | December 2025 |
| Last Update | Jul 2026 |
| Annual Generation | 42.5 GWh |
| Annual Consumption | 145.0 k MMBtu |
| Ranked #4,449 out of 13,285 Power Plants Nationwide | |
| Ranked #1,229 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #112 out of 271 Michigan Power Plants | |
| Ranked #18 out of 76 Michigan Solar Power Plants | |
| Fuel Types | Solar |
Map of Genesee Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Genesee Solar Project.
Monthly Net Generation for Genesee Solar Project
Monthly Plant Fuel Consumption for Genesee Solar Project
Genesee Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Genesee Solar Project (66756) |
| Plant Address | TBD, Flint, MI 48505 |
| Utility | Genesee Solar Energy, LLC (65740) |
| Latitude, Longitude | 43.08638, -83.66512 |
| Generation Dates on File | Dec 2025 to Jul 2026 |
| Initial Operation Date | December 2025 |
| Annual Generation | 42.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Michigan Electric Transmission Company, (56163) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator GS1 Details Operating December 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 40.8 MW |
| Summer Capacity | 40.8 MW |
| Winter Capacity | 40.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 90 |
| Tilt Angle | 60 |
| DC Net Capacity | 48 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Genesee Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1219 | Stony Knoll Solar, LLC | Rockford, NC | 44.0 GWh |
| #1220 | Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 43.9 GWh |
| #1221 | American Falls Solar | American Falls, ID | 43.7 GWh |
| #1222 | Mohave Energy - Hybrid | Fort Mohave, AZ | 43.7 GWh |
| #1223 | Watlington Solar | Halifax, VA | 43.6 GWh |
| #1224 | Trade Post Solar | Farmersburg, IN | 43.0 GWh |
| #1225 | Western Antelope Blue Sky Ranch A | Lancaster, CA | 43.0 GWh |
| #1226 | Westmoreland County Solar Project | WARSAW, VA | 43.0 GWh |
| #1227 | Avalon Solar II | Sahuarita, AZ | 42.9 GWh |
| #1228 | Kettleman Solar -Centaurus | Kettleman City, CA | 42.9 GWh |
| #1230 | Energix Leatherwood, LLC | Axton, VA | 42.3 GWh |
| #1231 | Temperance Solar, LLC | Erie, MI | 42.2 GWh |
| #1232 | Pleasant Hill Solar | Suffolk, VA | 42.0 GWh |
| #1233 | Murphy Flat Solar | Murphy, ID | 41.8 GWh |
| #1234 | Bingham Solar, LLC | St. Johns, MI | 41.8 GWh |
| #1235 | Decatur County Solar Project | Bainbridge, GA | 41.8 GWh |
| #1236 | Lockhart Solar PV IV, LLC | Hinkley, CA | 41.7 GWh |
| #1237 | Calverton Solar Energy Center | Calverton, NY | 41.7 GWh |
| #1238 | Bayshore Solar B, LLC | Lancaster, CA | 41.7 GWh |
| #1239 | Old Midville Solar | Millen, GA | 41.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Genesee Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Assembly Solar II LLC | Lennon, MI | 222.7 GWh | 15.2 mi |
| Assembly Solar III | Lennon, MI | 166.5 GWh | 14.7 mi |
| Assembly Solar Project | Venice Township, MI | 98.8 GWh | 14.8 mi |
| Blue Elk VII Solar, LLC | Flint, MI | 20.5 GWh | 4.9 mi |
| Brent Run Generating Station | Montrose, MI | 49.8 GWh | 11.1 mi |
| Captain Solar, LLC | Mt. Morris, MI | 3.9 GWh | 6 mi |
| Coldwater Solar, LLC | Flint, MI | 3.8 GWh | 5.7 mi |
| Demille Solar Farm | Lapeer, MI | 36.9 GWh | 17.1 mi |
| Genesee Power Station LP | Flint, MI | 116.5 GWh | 0.2 mi |
| Grand Blanc Generating Station | Grand Blanc, MI | 50.2 GWh | 12.6 mi |
| Interchange Solar, LLC | Mt. Morris, MI | 3.5 GWh | 5.4 mi |
| Jack Francis Solar, LLC | Clio, MI | 3.9 GWh | 4.4 mi |
| Lennon Generating | Lennon, MI | 25.6 GWh | 17.4 mi |
| Lyons Road | Owosso, MI | 41.3 GWh | 25.5 mi |
| May Shannon Solar, LLC | Clio, MI | 4.1 GWh | 4.7 mi |
| Midcontinent Solar, LLC | Owosso, MI | 37.6 GWh | 26.1 mi |
| Pegasus Wind | Reese, MI | 375.9 GWh | 26.5 mi |
| Peoples Generating Station | Ann Arbor, MI | 25.5 GWh | 16.7 mi |
| Turrill Solar Farm | Lapeer, MI | 20.2 GWh | 18.3 mi |
| Venice Resources Gas Recovery | Lennon, MI | 12.7 GWh | 17.2 mi |