T B Simon Power Plant
354 Service Rd., East Lansing, MI 48824Plant Summary Information
T B Simon Power Plant is ranked #45 out of 258 power plants in Michigan in terms of total annual net electricity generation.
T B Simon Power Plant is comprised of 9 generators and generated 68.5 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | T B Simon Power Plant |
---|---|
Utility Name | Michigan State University |
Location | Ingham County, MI |
Initial Operation Date | December 1965 |
Last Update | Mar 2025 |
Annual Generation | 249.0 GWh |
Annual Consumption | 5.3 M MMBtu |
Ranked #2,130 out of 12,288 Power Plants Nationwide | |
Ranked #692 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #45 out of 258 Michigan Power Plants | |
Ranked #18 out of 73 Michigan Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of T B Simon Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for T B Simon Power Plant.
Monthly Net Generation for T B Simon Power Plant
T B Simon Power Plant Details
Summary Information | |
---|---|
Plant Name | T B Simon Power Plant (10328) |
Plant Address | 354 Service Rd., East Lansing, MI 48824 |
Utility | Michigan State University (12436) |
Latitude, Longitude | 42.7178, -84.4836 |
Generation Dates on File | Jan 2001 to Mar 2025 |
Initial Operation Date | December 1965 |
Annual Generation | 249.0 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | EL21-50-000, QF21-222-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Ground Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Consumers Energy Co (4254) MI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSUMERS ENERGY COMPANY |
Natural Gas Storage | No |
Generator GEN1 Details Operating December 1965
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 12.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1965 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating September 1966
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 12.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1966 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating December 1974
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1974 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating August 1993
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 21 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 21 MW |
Winter Capacity | 21 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1993 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating April 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 14.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 12.6 MW |
Winter Capacity | 14.3 MW |
Minimum Load | 9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2006 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating May 2006
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 23.8 MW |
Winter Capacity | 23.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2006 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
---|---|
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating February 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 9.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.4 MW |
Winter Capacity | 9.4 MW |
Minimum Load | 6.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GEN8 Details Operating February 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 9.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.4 MW |
Winter Capacity | 9.4 MW |
Minimum Load | 6.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GEN9 Details Operating February 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 9.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.4 MW |
Winter Capacity | 9.4 MW |
Minimum Load | 6.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
T B Simon Power Plant Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#682 | Portside Energy | Portage, IN | 256.4 GWh |
#683 | Salinas River Cogeneration | San Ardo, CA | 256.4 GWh |
#684 | McIntosh (AL) | McIntosh, AL | 256.4 GWh |
#685 | AES Redondo Beach LLC | Redondo Beach, CA | 256.2 GWh |
#686 | Midway Sunset Cogen | Fellows, CA | 254.9 GWh |
#687 | Oak Grove (TX) | Franklin, TX | 11.5 TWh |
#688 | Milford Power LP | Milford, MA | 253.1 GWh |
#689 | Consumer Operations LLC | Green Bay, WI | 251.9 GWh |
#690 | Culbertson Generation Station | Culbertson, MT | 251.2 GWh |
#691 | Lauderdale | Ft. Lauderdale, FL | 249.4 GWh |
#693 | Los Esteros Critical Energy Center | San Jose, CA | 247.8 GWh |
#694 | Dearborn Energy Center | Dearborn, MI | 247.3 GWh |
#695 | New-Indy Ontario Mill | Ontario, CA | 246.3 GWh |
#696 | Indiana Harbor West | East Chicago, IN | 245.0 GWh |
#697 | Kalamazoo River Generating Station | Comstock, MI | 244.8 GWh |
#698 | Agua Fria | Glendale, AZ | 239.3 GWh |
#699 | Elwood Energy LLC | Elwood, IL | 243.4 GWh |
#700 | Clinch River | Cleveland, VA | 240.9 GWh |
#701 | Kern River Cogeneration | Bakersfield, CA | 238.4 GWh |
#702 | Edward L. Addison Generating Plant | Thomaston, GA | 241.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding T B Simon Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Assembly Solar III | Lennon, MI | 165.0 GWh | 34.6 mi |
Assembly Solar Project | Venice Township, MI | 103.7 GWh | 34.5 mi |
Bingham Solar, LLC | St. Johns, MI | 41.0 GWh | 20.5 mi |
Blue Elk II Solar, LLC | Mason, MI | 25.6 GWh | 14.7 mi |
Blue Elk III Solar, LLC | Eaton Rapids, MI | 36.4 GWh | 15 mi |
Delta Energy Park | Lansing, MI | 1.2 TWh | 9 mi |
Delta Solar Power I | Grand Ledge, MI | 13.6 GWh | 11.1 mi |
Delta Solar Power II | Grand Ledge, MI | 26.3 GWh | 11 mi |
Frank Jenkins | Portland, MI | 58.8 MWh | 23.3 mi |
Grand River | Grand Ledge, MI | 7.4 GWh | 11.9 mi |
Jackson Generating Station | Jackson, MI | 2.1 TWh | 32.9 mi |
Lansing BWL REO Town Plant | Lansing, MI | 436.5 GWh | 3.5 mi |
Lennon Generating | Lennon, MI | 8.7 GWh | 31.4 mi |
Lyons Road | Owosso, MI | 40.5 GWh | 24.3 mi |
Midcontinent Solar, LLC | Owosso, MI | 36.8 GWh | 24 mi |
River Fork Solar, LLC | Albion, MI | 69.4 GWh | 33.2 mi |
Shipsterns Solar, LLC | Albion, MI | 1.3 GWh | 32.1 mi |
Spartan PV 1, LLC | East Lansing, MI | 12.0 GWh | 0.2 mi |
Venice Resources Gas Recovery | Lennon, MI | 10.6 GWh | 31.6 mi |
Webber | Lyons, MI | 11.4 GWh | 26.7 mi |