Buchanan (MI)
15560 East River Road, Buchanan, MI 49107Plant Summary Information
Buchanan (MI) is ranked #24 out of 50 hydroelectric power plants in Michigan in terms of total annual net electricity generation.
Buchanan (MI) is comprised of 10 generators and generated 3.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Buchanan (MI) |
---|---|
Utility Name | Indiana Michigan Power Co |
Location | Berrien County, MI |
Initial Operation Date | January 1919 |
Last Update | Dec 2024 |
Annual Generation | 15.2 GWh |
Annual Consumption | 57.1 k MMBtu |
Ranked #5,494 out of 12,288 Power Plants Nationwide | |
Ranked #823 out of 1,323 Water Power Plants Nationwide | |
Ranked #151 out of 258 Michigan Power Plants | |
Ranked #24 out of 50 Michigan Water Power Plants | |
Fuel Types | Water |
Map of Buchanan (MI)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buchanan (MI).
Monthly Net Generation for Buchanan (MI)
Buchanan (MI) Details
Summary Information | |
---|---|
Plant Name | Buchanan (MI) (1754) |
Plant Address | 15560 East River Road, Buchanan, MI 49107 |
Utility | Indiana Michigan Power Co (9324) |
Latitude, Longitude | 41.83957, -86.35105 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | January 1919 |
Annual Generation | 15.2 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | St Joseph River |
Ash Impoundment | |
Transmission / Distribution Owner | Indiana Michigan Power Co (9324) MI |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating January 1919
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418309 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1919 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 2 Details Operating January 1919
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418313 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1919 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 3 Details Operating January 1919
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418315 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1919 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 4 Details Operating January 1919
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418317 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1919 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 5 Details Operating January 1919
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418319 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1919 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 6 Details Operating January 1919
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418321 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1919 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 10 Details Operating January 1927
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418311 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1927 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 7 Details Operating January 1927
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418323 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1927 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 8 Details Operating January 1927
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418325 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1927 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator 9 Details Operating January 1927
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32418327 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 34497125 |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1927 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Buchanan (MI) Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#813 | Siphon Power Project | Bend, OR | 15.6 GWh |
#814 | Vinelands Power Plant | Palisade, CO | 15.6 GWh |
#815 | Parishville | Parishville, NY | 15.6 GWh |
#816 | Dayton Hydro | Ottawa, IL | 15.6 GWh |
#817 | Spaulding 3 | Emigrant Gap, CA | 15.6 GWh |
#818 | Falls Creek | Cascadia, OR | 15.5 GWh |
#819 | Murphys | Murphys, CA | 15.5 GWh |
#820 | Searsburg | Searsburg, VT | 15.4 GWh |
#821 | Errol Hydroelectric Project | Errol, NH | 15.3 GWh |
#822 | Norway Point Hydropower Project | Alpena, MI | 15.3 GWh |
#824 | Marble Falls | Marble Falls, TX | 15.2 GWh |
#825 | Waterbury 22 | Waterbury, VT | 15.2 GWh |
#826 | Sewalls | Watertown, NY | 15.1 GWh |
#827 | Goat Lake Hydro | Skagway, AK | 15.1 GWh |
#828 | Black Butte | Orland, CA | 14.9 GWh |
#829 | Gateway | Mountain Green, UT | 14.9 GWh |
#830 | Point A | Andalusia, AL | 14.9 GWh |
#831 | City of Peru Plank Road Generating Station | Peru, IL | 15.1 GWh |
#832 | Fort Miller Hydroelectric Facility | Northumberland, NY | 14.8 GWh |
#833 | White River Lock and Dam 2 | Locust Grove, AR | 14.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buchanan (MI).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Berrien Springs | Berrien Springs, MI | 32.9 GWh | 7.3 mi |
Bremen | Bremen, IN | 13.4 GWh | 27.8 mi |
Donald C Cook | Bridgman, MI | 18.1 TWh | 14.5 mi |
Earthmovers LFGTE | Elkhart, IN | 22.5 GWh | 24.5 mi |
Elkhart | Elkhart, IN | 13.0 GWh | 22.3 mi |
French Paper Hydro | Niles, MI | 2.7 GWh | 4.9 mi |
Honeysuckle Solar Farm | New Carlisle, IN | 181.9 GWh | 10.2 mi |
Indeck Niles Energy Center | Niles, MI | 6.2 TWh | 6.9 mi |
Notre Dame Hydro | South Bend, IN | 6.8 GWh | 12.5 mi |
OlivePV | New Carlisle, IN | 8.6 GWh | 12 mi |
Prairie View I & II LFGTE | Wyatt, IN | 30.5 GWh | 25.7 mi |
Southeast Berrien Generating Facility | Niles, MI | 23.6 GWh | 2.6 mi |
St Joseph Energy Center | New Carlisle, IN | 5.7 TWh | 11.8 mi |
St. Joseph Solar | Granger, IN | 37.8 GWh | 14.6 mi |
Twin Branch | Mishawaka, IN | 22.9 GWh | 16.5 mi |
Twin Branch PV | Mishawaka, IN | 4.3 GWh | 15.8 mi |
University of Notre Dame | Notre Dame, IN | 92.3 GWh | 10.8 mi |
Walkerton | Walkerton, IN | 2.0 GWh | 27.5 mi |
Watervliet | Watervliet, MI | 28.2 GWh | 23.5 mi |
Watervliet PV | Watervliet, MI | 6.6 GWh | 25 mi |