Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Abel Road Bioenergy | ACC Renewable Resources | Williams, CA | California Independent System Operator (CISO) | 22.3 GWh | Jun 2022 | Dec 2024 | Agricultural By-Products |
| Wadham Energy LP | Wadham Energy Ltd Partners | Williams, CA | California Independent System Operator (CISO) | 132.0 GWh | Feb 1989 | Dec 2024 | Agricultural By-Products : 99.7% |
| Argus Cogen Plant | Searles Valley Minerals Operations Inc. | Trona, CA | California Independent System Operator (CISO) | 252.4 GWh | Nov 1947 | Sep 2025 | Bituminous Coal : 94.8% Natural Gas : 5.2% |
| SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2011 | Sep 2025 | Distillate Fuel Oil |
| Pebbly Beach Generating Station Hybrid | Southern California Edison Co | Avalon, CA | California Independent System Operator (CISO) | 28.6 GWh | Jun 1958 | Sep 2025 | Distillate Fuel Oil : 94.5% Gaseous Propane : 5.5% |
| Electrolyte BESS | Henrietta BESS LLC | Lemoore, CA | California Independent System Operator (CISO) | 6.0 GWh | - | Sep 2025 | Electricity used for energy storage |
| CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 276.9 GWh | Jun 2022 | Dec 2024 | Geothermal |
| Coso Energy Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 244.2 GWh | Nov 1988 | Dec 2024 | Geothermal |
| Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 370.1 GWh | Jun 1987 | Sep 2025 | Geothermal |
| Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 299.2 GWh | Oct 1989 | Sep 2025 | Geothermal |
| Sonoma California Geothermal | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 447.6 GWh | Nov 1983 | Dec 2024 | Geothermal |
| North Brawley Geothermal Plant | Ormat Nevada Inc | Brawley, CA | Imperial Irrigation District (IID) | 16.9 GWh | Sep 2009 | Dec 2024 | Geothermal |
| Mammoth G3 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 103.1 GWh | Nov 1990 | Dec 2024 | Geothermal |
| Second Imperial Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 302.3 GWh | May 1993 | Dec 2024 | Geothermal |
| Mammoth G1 | Ormat Nevada Inc | Mammoth lakes, CA | California Independent System Operator (CISO) | 59.6 GWh | Nov 1984 | Dec 2024 | Geothermal |
| Mammoth G2 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 82.3 GWh | Nov 1990 | Dec 2024 | Geothermal |
| Calistoga Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 456.5 GWh | Feb 1984 | Sep 2025 | Geothermal |
| Salton Sea Power Gen Co - Unit 1 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 78.4 GWh | Jun 1982 | Dec 2024 | Geothermal |
| Aidlin Geothermal Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 81.3 GWh | Apr 1989 | Dec 2024 | Geothermal |
| Geysers Unit 5-20 | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 4.4 TWh | Mar 1971 | Sep 2025 | Geothermal |
| CE Leathers | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 70.6 GWh | Oct 1989 | Dec 2024 | Geothermal |
| Del Ranch Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 326.3 GWh | Sep 1988 | Dec 2024 | Geothermal |
| Elmore Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 104.3 GWh | Oct 1988 | Dec 2024 | Geothermal |
| John L. Featherstone Plant | Hudson Ranch Power I LLC | Calipatria, CA | Imperial Irrigation District (IID) | 434.6 GWh | Feb 2012 | Sep 2025 | Geothermal |
| Salton Sea Power Gen Co - Unit 2 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 107.0 GWh | Feb 1990 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 3 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 314.9 GWh | Jan 1989 | Dec 2024 | Geothermal |
| Vulcan-BN Geothermal Power Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 227.2 GWh | Nov 1985 | Dec 2024 | Geothermal |
| Ormesa I | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 70.2 GWh | Nov 1986 | Dec 2024 | Geothermal |
| Salton Sea Power LLC - Unit 5 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 290.3 GWh | Mar 2000 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 4 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 179.8 GWh | Apr 1996 | Dec 2024 | Geothermal |
| Ormesa III | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 44.4 GWh | Apr 1989 | Dec 2024 | Geothermal |
| Heber Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 384.9 GWh | May 1985 | Dec 2024 | Geothermal |
| Ormesa II | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 131.7 GWh | Apr 1989 | Dec 2024 | Geothermal |
| Geothermal 1 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 368.8 GWh | Dec 1982 | Sep 2025 | Geothermal |
| Geothermal 2 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 316.7 GWh | Nov 1985 | Sep 2025 | Geothermal |
| Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 1978 | Sep 2025 | Jet Fuel |
| Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 38.9 GWh | Feb 1969 | Dec 2024 | Landfill Gas |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 1993 | Dec 2024 | Landfill Gas |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 29.0 GWh | Jan 2009 | Dec 2024 | Landfill Gas |
| Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 235.5 GWh | Oct 2012 | Sep 2025 | Landfill Gas |
| Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.0 GWh | May 1996 | Dec 2024 | Landfill Gas |
| MM Tulare Energy | MM Tulare Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 9.7 GWh | Apr 1998 | Dec 2023 | Landfill Gas |
| MM Lopez Energy | MM Lopez Energy LLC | Lake View Terrace, CA | California Independent System Operator (CISO) | 25.5 GWh | Nov 1998 | Dec 2024 | Landfill Gas |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.5 GWh | Oct 2004 | Dec 2024 | Landfill Gas |
| Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.8 GWh | Jan 2013 | Dec 2024 | Landfill Gas |
| Puente Hills Energy Recovery | Los Angeles County Sanitation | Whittier, CA | California Independent System Operator (CISO) | 151.3 GWh | Sep 1986 | Sep 2025 | Landfill Gas |
| Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 81.3 GWh | Nov 2008 | Sep 2025 | Landfill Gas |
| Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 4.6 GWh | Oct 2009 | Dec 2024 | Landfill Gas |
| Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 6.6 GWh | Dec 1985 | Dec 2024 | Landfill Gas |
| Kiefer Landfill | Sacramento County of Dpt Waste | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 51.0 GWh | Nov 1999 | Dec 2024 | Landfill Gas |
| Sycamore Energy LLC | Sycamore Energy LLC | Santee, CA | California Independent System Operator (CISO) | 23.1 GWh | Mar 2004 | Dec 2024 | Landfill Gas |
| Marina Landfill Gas | Monterey Regional Waste Mgmt | Marina, CA | California Independent System Operator (CISO) | 22.8 GWh | Mar 1998 | Dec 2024 | Landfill Gas |
| Ameresco Santa Cruz Energy | AMERESCO Santa Cruz Energy LLC | Watsonville, CA | California Independent System Operator (CISO) | 16.5 GWh | Dec 2005 | Dec 2024 | Landfill Gas |
| Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 36.3 GWh | Jun 2010 | Dec 2024 | Landfill Gas |
| Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 19.1 GWh | Jun 2009 | Dec 2024 | Landfill Gas |
| MM Yolo Power | Yolo County Community Services Department | Woodland, CA | California Independent System Operator (CISO) | 16.9 GWh | Sep 1990 | Dec 2024 | Landfill Gas |
| Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2013 | Dec 2024 | Landfill Gas |
| Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 58.7 GWh | Mar 2016 | Dec 2024 | Landfill Gas |
| Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 31.8 GWh | Jan 2014 | Dec 2024 | Landfill Gas |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.7 GWh | Mar 2014 | Dec 2024 | Landfill Gas |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.3 GWh | Feb 2013 | Dec 2024 | Landfill Gas |
| Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 121.2 GWh | Jul 2014 | Sep 2025 | Landfill Gas |
| Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 29.6 GWh | May 2017 | Dec 2024 | Landfill Gas |
| Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 153.5 GWh | Mar 2016 | Dec 2024 | Landfill Gas |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 13.1 GWh | Apr 2017 | Dec 2024 | Landfill Gas |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| MM San Diego-Miramar | MM San Diego Energy-Miramar | San Diego, CA | California Independent System Operator (CISO) | 46.1 GWh | Jun 1997 | Dec 2024 | Landfill Gas : 91.9% Other Biomass Gas : 8.1% |
| MM West Covina | MM West Covina Energy LLC | West Covina, CA | California Independent System Operator (CISO) | 31.0 GWh | May 1993 | Dec 2024 | Landfill Gas : 99.8% |
| SCA Cogen 2 | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 601.6 GWh | Feb 1997 | Sep 2025 | Natural Gas |
| Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 1974 | Dec 2024 | Natural Gas |
| Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 1989 | Dec 2024 | Natural Gas |
| SPA Cogen 3 | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 531.2 GWh | Nov 1997 | Sep 2025 | Natural Gas |
| Lake One | City of Burbank Water and Power | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 285.0 MWh | May 2002 | Dec 2024 | Natural Gas |
| King City Power Plant | Calpine King City Cogen LLC | King City, CA | California Independent System Operator (CISO) | 31.4 GWh | Jan 1989 | Sep 2025 | Natural Gas |
| Walnut Energy Center | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 1.6 TWh | Jan 2006 | Sep 2025 | Natural Gas |
| Center Hybrid | Southern California Edison Co | Norwalk, CA | California Independent System Operator (CISO) | 7.2 GWh | Aug 2007 | Dec 2024 | Natural Gas |
| Gateway Generating Station | Pacific Gas & Electric Co. | Antioch, CA | California Independent System Operator (CISO) | 3.0 TWh | Dec 2008 | Sep 2025 | Natural Gas |
| Colusa Generating Station | Pacific Gas & Electric Co. | Maxwell, CA | California Independent System Operator (CISO) | 2.8 TWh | Nov 2010 | Sep 2025 | Natural Gas |
| Niland Gas Turbine Plant | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 55.7 GWh | May 2008 | Dec 2024 | Natural Gas |
| Barre Peaker | Southern California Edison Co | Stanton, CA | California Independent System Operator (CISO) | 12.7 GWh | Aug 2007 | Nov 2024 | Natural Gas |
| Greenleaf 2 Power Plant | Greenleaf Energy LLC | Yuba City, CA | California Independent System Operator (CISO) | 13.0 GWh | Sep 1989 | Sep 2025 | Natural Gas |
| Marathon Bay Area Cogen | Tesoro Marketing & Refining Co. LLC (Martinez) | Martinez, CA | California Independent System Operator (CISO) | 613.4 GWh | Jan 1987 | Sep 2025 | Natural Gas |
| Kaweah Delta District Hospital | Kaweah Delta Hospital | Visalia, CA | California Independent System Operator (CISO) | 21.4 GWh | Sep 2008 | Sep 2025 | Natural Gas |
| California Institute of Technology | California Institute-Technology | Pasadena, CA | California Independent System Operator (CISO) | 40.5 GWh | Jul 2003 | Sep 2025 | Natural Gas |
| Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 23.6 GWh | May 2010 | Dec 2024 | Natural Gas |
| Loma Linda University Cogen | Loma Linda University | Loma Linda, CA | California Independent System Operator (CISO) | 63.0 GWh | Jan 1980 | Sep 2025 | Natural Gas |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 25.3 GWh | Mar 2000 | Sep 2025 | Natural Gas |
| Carson Cogeneration | Carson Cogeneration Co | Carson, CA | California Independent System Operator (CISO) | 29.1 GWh | Nov 1989 | Aug 2024 | Natural Gas |
| Grapeland Hybrid | Southern California Edison Co | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2007 | Dec 2024 | Natural Gas |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2010 | Dec 2024 | Natural Gas |
| Grossmont Hospital | Sharp Grossmont Hospital | La Mesa, CA | California Independent System Operator (CISO) | 25.5 GWh | Jul 1983 | Dec 2024 | Natural Gas |
| Univ of San Francisco Cogen | University of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 1987 | Dec 2024 | Natural Gas |
| Double C Generation Limited Partnership | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.9 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| B Braun Medical | B Braun Medical Inc | Irvine, CA | California Independent System Operator (CISO) | 32.9 GWh | Oct 1982 | Dec 2024 | Natural Gas |
| Blacksand Generating Facility | Bridge Energy LLC | Brea, CA | California Independent System Operator (CISO) | 39.0 GWh | May 2000 | Dec 2024 | Natural Gas |
| Berry Cogen | Berry Petroleum Co | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 1986 | Sep 2025 | Natural Gas |
| Ripon Generation Station | Modesto Irrigation District | Ripon, CA | Balancing Authority of Northern California (BANC) | 8.7 GWh | May 2006 | Nov 2024 | Natural Gas |
| Sycamore Cogeneration | Sycamore Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 304.3 GWh | Nov 1987 | Sep 2025 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |