Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Packaging of America Tomahawk Mill | PCA-Tomahawk Mill | Tomahawk, WI | Midcontinent Independent System Operator, Inc. (MISO) | 113.1 GWh | Dec 1919 | Dec 2025 | Wood/Wood Waste Solids : 35.4% Natural Gas : 35.0% Black Liquor : 18.0% Water : 11.0% Other Biomass Solids : 0.6% |
| Hoffmann LaRoche | PB Nutclif Master, LLC | Nutley, NJ | PJM Interconnection, LLC (PJM) | 51.6 GWh | Apr 2004 | Aug 2026 | Natural Gas : 98.9% Distillate Fuel Oil : 1.1% |
| Payson | Payson City Corporation | Payson, UT | PacifiCorp East (PACE) | 6.0 MWh | May 1988 | Dec 2025 | Natural Gas : 83.0% Distillate Fuel Oil : 17.0% |
| Paynesville Community Solar | Paynesville Community Solar | Paynesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Nov 2016 | Dec 2025 | Solar |
| Pavant Solar II LLC | Pavant Solar II LLC | Fillmore, UT | PacifiCorp East (PACE) | 85.9 GWh | Oct 2016 | Dec 2025 | Solar |
| Paulsboro Refinery | Paulsboro Refining Company - LLC | Paulsboro, NJ | PJM Interconnection, LLC (PJM) | 350.2 GWh | Jul 1982 | Aug 2026 | Natural Gas : 58.9% Other Gas : 41.0% |
| Timber Road IV | Paulding Wind Farm IV LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 403.5 GWh | Dec 2019 | Aug 2026 | Wind |
| Paulding Wind Farm III | Paulding Wind Farm III LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 321.2 GWh | Nov 2016 | Aug 2026 | Wind |
| Paulding Wind Farm II | Paulding Wind Farm II LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 315.6 GWh | Jun 2011 | Aug 2026 | Wind |
| LafargeHolcim - Paulding Wind Project | Paulding Wind 28, LLC | Paulding, OH | PJM Interconnection, LLC (PJM) | 5.7 GWh | Jul 2020 | Dec 2024 | Wind |
| Patua Acquisition Project, LLC | Patua Acquisition Company, LLC | Hazen, NV | Nevada Power Company (NEVP) | 103.3 GWh | Nov 2013 | Dec 2025 | Geothermal : 75.5% Solar : 24.5% |
| PaTu Wind Farm LLC | PaTu Wind Farm LLC | Wasco, OR | Bonneville Power Administration (BPAT) | 108.0 MWh | Nov 2010 | Dec 2025 | Wind |
| Pattern Panhandle Wind LLC | Pattern Operators LP | Panhandle, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 623.0 GWh | Jun 2014 | Aug 2026 | Wind |
| Ocotillo Express LLC | Pattern Operators LP | Ocotillo, CA | California Independent System Operator (CISO) | 424.6 GWh | Nov 2012 | Aug 2026 | Wind |
| Post Rock Wind Power Project, LLC | Pattern Operators LP | Ellsworth, KS | Southwest Power Pool (SWPP) | 433.4 GWh | Aug 2012 | Aug 2026 | Wind |
| Pattern Panhandle Wind 2 LLC | Pattern Operators LP | Panhandle, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 577.3 GWh | Oct 2014 | Dec 2025 | Wind |
| Logans Gap Wind LLC | Pattern Operators LP | Comanche, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 626.1 GWh | Jul 2015 | Aug 2026 | Wind |
| Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 447.9 GWh | Dec 2015 | Aug 2026 | Wind |
| Spring Valley Wind Project | Pattern Operators LP | Ely, NV | Nevada Power Company (NEVP) | 300.2 GWh | Jul 2012 | Aug 2026 | Wind |
| Lost Creek Wind Energy Facility | Pattern Operators LP | King City, MO | Associated Electric Cooperative, Inc. (AECI) | 390.5 GWh | Apr 2010 | Aug 2026 | Wind |
| Hatchet Ridge Wind Project | Pattern Operators LP | Burney, CA | California Independent System Operator (CISO) | 271.3 GWh | Nov 2010 | Dec 2025 | Wind |
| Pattern Gulf Wind | Pattern Operators LP | Armstrong, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 787.9 GWh | Nov 2008 | Aug 2026 | Wind |
| Stillwater Wind, LLC | Pattern Operators LP | Reed Point, MT | NorthWestern Corporation (NWMT) | 278.3 GWh | Sep 2018 | Aug 2026 | Wind |
| Broadview Energy KW, LLC | Pattern Operators LP | Texico, NM | (GRIS) | 574.6 GWh | Feb 2017 | Aug 2026 | Wind |
| Broadview Energy JN, LLC | Pattern Operators LP | Texico, NM | (GRIS) | 719.3 GWh | Feb 2017 | Aug 2026 | Wind |
| Grady Wind Energy Center, LLC | Pattern Operators LP | Clovis, NM | Public Service Company of New Mexico (PNM) | 911.0 GWh | Jul 2019 | Aug 2026 | Wind |
| Red Cloud Wind LLC | Pattern Operators LP | Corona, NM | Public Service Company of New Mexico (PNM) | 1.2 TWh | Nov 2021 | Aug 2026 | Wind |
| Clines Corners Wind Farm LLC | Pattern Operators LP | Encino, NM | Public Service Company of New Mexico (PNM) | 1.1 TWh | Nov 2021 | Aug 2026 | Wind |
| Duran Mesa LLC | Pattern Operators LP | Duran, NM | Public Service Company of New Mexico (PNM) | 334.0 GWh | Nov 2021 | Aug 2026 | Wind |
| Tecolote Wind LLC | Pattern Operators LP | Duran, NM | Public Service Company of New Mexico (PNM) | 878.6 GWh | Nov 2021 | Aug 2026 | Wind |
| SunZia Wind South | Pattern Operators LP | Corona, NM | California Independent System Operator (CISO) | 2.3 TWh | - | Aug 2026 | Wind |
| SunZia Wind North | Pattern Operators LP | Clines Corner, NM | California Independent System Operator (CISO) | 677.3 GWh | - | Aug 2026 | Wind |
| DSM Pharmaceuticals | Patheon Manufacturing Service LLC | Greenville, NC | Duke Energy Progress East (CPLE) | 43.0 MWh | Jul 1987 | Dec 2025 | Distillate Fuel Oil |
| Pastoria Solar | Pastoria Solar Energy Company, LLC | Lebec, CA | California Independent System Operator (CISO) | 61.3 GWh | - | Aug 2026 | Solar |
| Pasco Cnty Solid Waste Resource Recovery | Pasco County - (FL) | Spring Hill, FL | Duke Energy Florida, Inc. (FPC) | 188.4 GWh | Apr 1991 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.8% Biogenic Municipal Solid Waste : 44.9% |
| Pasadena Cogeneration | Pasadena Cogeneration LP | Pasadena, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 5.0 TWh | May 1998 | Aug 2026 | Natural Gas |
| Partridgeville Hybrid CSG | Partridgeville Road Solar 1, LLC | Athol, MA | ISO New England (ISNE) | 5.3 GWh | Dec 2019 | Dec 2025 | Solar |
| Partin Solar | Partin Solar, LLC | Elkin, NC | Duke Energy Carolinas (DUK) | 90.1 GWh | Sep 2023 | Aug 2026 | Solar |
| Parliament Solar | Parliament Solar, LLC | Waller, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 766.0 GWh | May 2025 | Aug 2026 | Solar |
| Sewaren | Parkway Generation Sewaren Urban Renewal Entity LLC | Sewaren, NJ | PJM Interconnection, LLC (PJM) | 2.1 TWh | Oct 1948 | Aug 2026 | Natural Gas : 97.2% Distillate Fuel Oil : 2.8% |
| Kearny Generating Station | Parkway Generation Operating, LLC | Kearny, NJ | PJM Interconnection, LLC (PJM) | 270.1 GWh | Apr 1967 | Dec 2025 | Natural Gas : 99.8% |
| Burlington Generating Station | Parkway Generation Operating, LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 53.0 GWh | May 1967 | Dec 2025 | Natural Gas : 98.8% Kerosene : 1.2% |
| Bergen Generating Station | Parkway Generation Operating, LLC | Ridgefield, NJ | PJM Interconnection, LLC (PJM) | 3.1 TWh | Apr 1959 | Aug 2026 | Natural Gas : 97.1% Kerosene : 2.8% |
| Key | Parkway Generation Keys Energy Center LLC | Brandywine, MD | PJM Interconnection, LLC (PJM) | 4.5 TWh | Jun 2018 | Aug 2026 | Natural Gas |
| Paris Energy Center | Paris Generation LP | Paris, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 320.9 GWh | Jun 1989 | Dec 2025 | Natural Gas : 99.9% |
| Eiffel Solar Project | Paris Farm Solar, LLC | Paris, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 561.8 GWh | Oct 2023 | Aug 2026 | Solar |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2003 | Dec 2025 | Natural Gas |
| Paragould Reciprocating | Paragould Municipal Utilities (AR) | Paragould, AR | Southwestern Power Administration (SPA) | 441.0 MWh | Jun 2001 | Dec 2025 | Natural Gas |
| Paragould Turbine | Paragould Municipal Utilities (AR) | Paragould, AR | Southwestern Power Administration (SPA) | 48.0 MWh | Jul 1990 | Dec 2025 | Natural Gas |
| Paragould Solar Farm | Paragould Municipal Utilities (AR) | Paragould, AR | Southwestern Power Administration (SPA) | 3.1 GWh | Oct 2021 | Dec 2025 | Solar |
| Paradise Solar Energy Center | Paradise Solar Urban Renewal, LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 6.6 GWh | Feb 2011 | Dec 2025 | Solar |
| Tesoro Hawaii | PAR Petroleum | Kapolei, HI | (NA) | 137.5 GWh | Nov 1982 | Aug 2026 | Waste/Other Oil : 94.7% Distillate Fuel Oil : 5.3% |
| Panther Creek Energy Facility | Panther Creek Power Operating, LLC | Nesquehoning, PA | PJM Interconnection, LLC (PJM) | 384.0 GWh | Jun 1992 | Nov 2025 | Waste/Other Coal : 98.9% Distillate Fuel Oil : 1.0% |
| Pantex | Pantex (NNSA) | Amarillo, TX | Southwest Power Pool (SWPP) | 42.8 GWh | May 2014 | Aug 2026 | Wind |
| Panoche Energy Center | Panoche Energy Center, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 741.2 GWh | May 2009 | Aug 2026 | Natural Gas |
| Panda Solar NC 9, LLC | Panda Solar NC 9, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 8, LLC | Panda Solar NC 8, LLC | Star, NC | Duke Energy Progress East (CPLE) | 2.2 GWh | Aug 2019 | Dec 2025 | Solar |
| Panda Solar NC 7, LLC | Panda Solar NC 7 , LLC | Faison, NC | Duke Energy Progress East (CPLE) | 2.5 GWh | Jun 2019 | Dec 2025 | Solar |
| Panda Solar NC 6, LLC | Panda Solar NC 6, LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 1.4 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 5, LLC | Panda Solar NC 5, LLC | Fayetteville, NC | Duke Energy Progress East (CPLE) | 1.5 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 4, LLC | Panda Solar NC 4, LLC | Clarkton, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 3, LLC | Panda Solar NC 3, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 2, LLC | Panda Solar NC 2, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 2.8 GWh | Mar 2019 | Dec 2025 | Solar |
| Panda Solar NC 11, LLC | Panda Solar NC 11, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 10, LLC | Panda Solar NC 10, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 1, LLC | Panda Solar NC 1, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Mar 2019 | Dec 2025 | Solar |
| Pamlico Partners Solar | Pamlico Partners Solar, LLC | Washington, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Palo Duro Wind | Palo Duro Wind | Perryton, TX | Southwest Power Pool (SWPP) | 1.3 TWh | Nov 2014 | Aug 2026 | Wind |
| Belwood Farm | Palmetto Power Management LLC | Lawndale, NC | Duke Energy Progress East (CPLE) | 6.6 GWh | Nov 2012 | Dec 2025 | Solar |
| Mile Farm | Palmetto Power Management LLC | Rougemont, NC | Duke Energy Progress East (CPLE) | 7.2 GWh | May 2014 | Dec 2025 | Solar |
| Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Palmer's Creek Wind Farm, LLC | Palmer's Creek Wind Farm, LLC | Granite Falls, MN | Southwest Power Pool (SWPP) | 129.6 GWh | Nov 2018 | Aug 2026 | Wind |
| Curtis Palmer Hydroelectric | Palmer Hydroelectric | Corinth, NY | New York Independent System Operator (NYIS) | 276.6 GWh | Sep 1985 | Dec 2025 | Water |
| Palmer Community Solar LLC CSG | Palmer Community Solar LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jul 2021 | Dec 2025 | Solar |
| Municipal Cogen Plant | Palm Springs, City of - (CA) | Palm Springs, CA | California Independent System Operator (CISO) | 7.5 GWh | Apr 1985 | Aug 2026 | Natural Gas |
| Palm Springs DAC PV | Palm Springs USD | Palm Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Dec 2025 | Solar |
| PPS Power Plant No 1 | Paducah Power System | Paducah, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 153.5 GWh | May 2010 | Dec 2025 | Natural Gas |
| DeRidder Mill | Packaging Corporation of America | DeRidder, LA | Midcontinent Independent System Operator, Inc. (MISO) | 404.5 GWh | Sep 1969 | Dec 2025 | Black Liquor : 44.6% Wood/Wood Waste Solids : 37.8% Natural Gas : 17.6% |
| Packaging Corp of America | Packaging Corp of America | Counce, TN | Tennessee Valley Authority (TVA) | 427.2 GWh | Jan 1985 | Aug 2026 | Black Liquor : 59.7% Wood/Wood Waste Solids : 21.6% Natural Gas : 18.7% |
| Jim Bridger | PacifiCorp | Point of Rocks, WY | PacifiCorp East (PACE) | 7.3 TWh | Oct 1974 | Aug 2026 | Subbituminous Coal : 57.7% Natural Gas : 42.2% |
| Huntington | PacifiCorp | Huntington, UT | PacifiCorp East (PACE) | 4.5 TWh | Jun 1974 | Aug 2026 | Bituminous Coal |
| Ashton | PacifiCorp | Ashton, ID | PacifiCorp East (PACE) | 28.0 GWh | Jun 1917 | Dec 2025 | Water |
| Grace | PacifiCorp | Grace, ID | PacifiCorp East (PACE) | 82.7 GWh | Jun 1923 | Dec 2025 | Water |
| Oneida | PacifiCorp | Riverdale, ID | PacifiCorp East (PACE) | 39.4 GWh | Jun 1915 | Dec 2025 | Water |
| Soda | PacifiCorp | Soda Springs, ID | PacifiCorp East (PACE) | 16.3 GWh | Jun 1924 | Dec 2025 | Water |
| Blundell | PacifiCorp | Milford, UT | PacifiCorp East (PACE) | 271.2 GWh | Jun 1984 | Dec 2025 | Geothermal |
| Fall Creek | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 5.9 GWh | Aug 1903 | Dec 2025 | Water |
| Last Chance | PacifiCorp | Grace, ID | PacifiCorp East (PACE) | 3.5 GWh | Jan 1984 | Dec 2025 | Water |
| Slide Creek | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 57.0 GWh | Jun 1951 | Dec 2025 | Water |
| Stairs | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 4.1 GWh | Jun 1912 | Dec 2025 | Water |
| Prospect 2 | PacifiCorp | Prospect, OR | PacifiCorp West (PACW) | 180.1 GWh | Dec 1927 | Dec 2025 | Water |
| Lemolo 1 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 120.1 GWh | Jun 1955 | Dec 2025 | Water |
| Fish Creek | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 33.5 GWh | May 1952 | Jun 2025 | Water |
| Eagle Point | PacifiCorp | Eagle Point, OR | PacifiCorp West (PACW) | 14.8 GWh | Oct 1957 | Dec 2025 | Water |
| Clearwater 2 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 30.5 GWh | Oct 1953 | Dec 2025 | Water |
| Cutler Hydro | PacifiCorp | Collinston, UT | PacifiCorp East (PACE) | 41.2 GWh | Jun 1927 | Dec 2025 | Water |
| Clearwater 1 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 35.0 GWh | May 1953 | Dec 2025 | Water |
| Gadsby | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 194.6 GWh | Aug 1951 | Aug 2026 | Natural Gas |
| Granite | PacifiCorp | Salt lake City, UT | PacifiCorp East (PACE) | 4.2 GWh | Jul 1896 | Dec 2025 | Water |
| Pioneer | PacifiCorp | Ogden, UT | PacifiCorp East (PACE) | 10.4 GWh | May 1910 | Oct 2025 | Water |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |