| Ports Newark 8201 Solar | Prologis Logistics Services Incorporated | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2022 | Dec 2025 | Solar |
| Ports Jersey City Solar | Prologis Logistics Services Incorporated | Jersey City, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jul 2020 | Dec 2025 | Solar |
| Lister Avenue Solar | Prologis Logistics Services Incorporated | Newark, NJ | PJM Interconnection, LLC (PJM) | 3.4 GWh | Jun 2022 | Dec 2025 | Solar |
| Edison 7205 Solar | Prologis Logistics Services Incorporated | Edison, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2022 | Dec 2025 | Solar |
| Edison 0308 Solar | Prologis Logistics Services Incorporated | Edison, NJ | PJM Interconnection, LLC (PJM) | 4.6 GWh | Mar 2022 | Dec 2025 | Solar |
| Port Reading 8 Solar | Prologis Logistics Services Incorporated | Carteret, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2022 | Dec 2025 | Solar |
| Elizabeth Seaport Bldg A Solar | Prologis Logistics Services Incorporated | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Dec 2021 | Dec 2024 | Solar |
| IPC 25 Solar | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 4.9 GWh | Jun 2024 | Dec 2025 | Solar |
| Interstate 3 Solar | Prologis Logistics Services Incorporated | South Brunswick, NJ | PJM Interconnection, LLC (PJM) | 2.3 GWh | Apr 2022 | Dec 2025 | Solar |
| Edison 0203 Community Solar - SLNNJ203 | Prologis Logistics Services Incorporated | Edison, NJ | PJM Interconnection, LLC (PJM) | 469.0 MWh | Jun 2025 | Dec 2025 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 371.0 MWh | Aug 2023 | Dec 2025 | Solar |
| Franklin Park 3-SLCHI803 | Prologis Logistics Services Incorporated | Franklin Park, IL | PJM Interconnection, LLC (PJM) | 1.3 GWh | Jan 2025 | Dec 2025 | Solar |
| Airport Commons 7-slbal210 | Prologis Logistics Services Incorporated | Hanover, MD | PJM Interconnection, LLC (PJM) | 443.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Prologis Meadowlands 9305 - SLNNJ305 | Prologis Logistics Services Incorporated | Moonachie, NJ | PJM Interconnection, LLC (PJM) | 389.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Tracy 18 - SLCVA418 | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 182.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Chatsworth Industrial Center 1-SLLAX601 | Prologis Logistics Services Incorporated | Chatsworth, CA | California Independent System Operator (CISO) | 132.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Speedway North Bldg 1-sllas701 | Prologis Logistics Services Incorporated | Las Vegas, NV | Nevada Power Company (NEVP) | 582.0 MWh | Jun 2023 | Dec 2025 | Solar |
| Des Plaines 7-SLCHI819 | Prologis Logistics Services Incorporated | Des Plaines, IL | PJM Interconnection, LLC (PJM) | 709.0 MWh | May 2025 | Dec 2025 | Solar |
| Braes Bayou Plant | ProEnergy Services | Richmond, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 183.3 GWh | Jan 2022 | Jun 2026 | Natural Gas |
| Brotman Power Station | ProEnergy Services | Rosharon, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 242.9 GWh | Apr 2023 | Jun 2026 | Natural Gas |
| Oxnard | Procter&Gamble Paper Products Co-Oxnard | Oxnard, CA | California Independent System Operator (CISO) | 426.0 GWh | Jun 1982 | Jun 2026 | Natural Gas |
| Procter & Gamble Mehoopany Mill | Procter & Gamble Ppr Prdts Co | Mehoopany, PA | PJM Interconnection, LLC (PJM) | 761.4 GWh | Sep 1984 | Dec 2025 | Natural Gas |
| Syncarpha Prinsburg CSG (Ledeboer) | Prinsburg CSG I, LLC | Prinsburg, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Princeton (MN) | Princeton Public Utils Comm | Princeton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 108.0 MWh | Aug 1953 | Dec 2025 | Distillate Fuel Oil |
| Princeton Energy Center, LLC | Princeton Energy Center LLC | Plainsboro, NJ | PJM Interconnection, LLC (PJM) | 26.0 GWh | Sep 2012 | Dec 2025 | Natural Gas : 99.4% Solar : 0.6% |
| Brown Station Road Plant II | Prince George's County - (MD) | Upper Marlboro, MD | PJM Interconnection, LLC (PJM) | 11.0 MWh | Nov 2003 | Dec 2024 | Landfill Gas |
| Primient Loudon Plant | PRIMIENT, LLC | Loudon, TN | Tennessee Valley Authority (TVA) | 366.4 GWh | Sep 2016 | Dec 2025 | Natural Gas |
| Primient | Primary Products Ingredients Americas, LLC d/b/a Primient | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 408.0 GWh | May 2021 | Dec 2025 | Natural Gas |
| Primient Decatur Plant Cogen | Primary Products Ingredients Americas, LLC | Decatur, IL | Midcontinent Independent System Operator, Inc. (MISO) | 150.0 GWh | Dec 1988 | Dec 2025 | Natural Gas |
| Portside Energy | Primary Energy Recycling Holdings, LLC | Portage, IN | Midcontinent Independent System Operator, Inc. (MISO) | 262.4 GWh | Aug 1997 | Dec 2025 | Natural Gas |
| Pretzel CSG | Pretzel Solar, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Feb 2022 | Dec 2025 | Solar |
| Preston (MN) | Preston Public Utilities Comm | Preston, MN | Midcontinent Independent System Operator, Inc. (MISO) | 78.0 MWh | Dec 1948 | Dec 2025 | Distillate Fuel Oil : 71.9% Natural Gas : 28.1% |
| Preston Garden (CSG) | Preston Garden LLC | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2024 | Dec 2025 | Solar |
| Williams College - Campus CHP | President & Trustees of Williams College | Williamstown, MA | ISO New England (ISNE) | 3.2 GWh | Feb 2003 | Dec 2025 | Natural Gas : 98.4% Distillate Fuel Oil : 1.6% |
| Presence Saint Mary of Nazareth Hospital | Presence Health | Chicago, IL | PJM Interconnection, LLC (PJM) | 980.0 kWh | Jul 1993 | Dec 2025 | Natural Gas |
| Prescott Wind Farm | Prescott Wind Energy LLC | Prescott, IA | Midcontinent Independent System Operator, Inc. (MISO) | 166.4 GWh | Aug 2024 | Jun 2026 | Wind |
| Prawer Project CSG | Prawer Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2019 | Dec 2025 | Solar |
| Pratt Wind, LLC | Pratt Wind, LLC | Andover, KS | Southwest Power Pool (SWPP) | 862.6 GWh | Nov 2018 | Jun 2026 | Wind |
| Prairie Switch Wind LLC | Prairie Switch Wind LLC | El Campo, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 508.5 GWh | Apr 2025 | Jun 2026 | Wind |
| Prairie State Solar Project | Prairie State Solar, LLC | Swanwick Township, IL | Midcontinent Independent System Operator, Inc. (MISO) | 226.1 GWh | Jun 2021 | Jun 2026 | Solar |
| Prairie State Generating Station | Prairie State Generating Co LLC | Marissa, IL | Midcontinent Independent System Operator, Inc. (MISO) | 12.3 TWh | May 2012 | Jun 2026 | Bituminous Coal : 99.8% |
| Prairie Solar (VA) | Prairie Solar, LLC (VA) | Windsor, VA | PJM Interconnection, LLC (PJM) | 3.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Prairie Rose Wind Farm | Prairie Rose Wind Farm | Hardwick, MN | Midcontinent Independent System Operator, Inc. (MISO) | 460.1 GWh | Nov 2012 | Jun 2026 | Wind |
| Prairie Queen Wind Farm | Prairie Queen Wind Farm LLC | Moran, KS | Southwest Power Pool (SWPP) | 449.2 GWh | Apr 2019 | Jun 2026 | Wind |
| Alsey | Prairie Power, Inc | Alsey, IL | Midcontinent Independent System Operator, Inc. (MISO) | 34.7 GWh | May 1999 | Dec 2025 | Natural Gas : 99.8% |
| Pearl Station | Prairie Power, Inc | Pearl, IL | Midcontinent Independent System Operator, Inc. (MISO) | 64.0 MWh | May 1973 | Dec 2025 | Distillate Fuel Oil |
| Prairie Mist Solar | Prairie Mist Solar Project, LLC | Montrose, AR | Midcontinent Independent System Operator, Inc. (MISO) | 226.6 GWh | Aug 2024 | Jun 2026 | Solar |
| Berkshire 1 | PPS Berkshire Solar LLC | Sheffield, MA | ISO New England (ISNE) | 2.4 GWh | Nov 2011 | Dec 2024 | Solar |
| Fredonia Solar (KS) | PPM Solar LLC | Fredonia, KS | Southwest Power Pool (SWPP) | 3.9 GWh | Apr 2024 | Dec 2025 | Solar |
| BKV-BPP Ponder Solar | PPM Solar LLC | Ponder, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 6.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Highpeak Solar 1 | PPM Solar LLC | Coahoma, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 13.8 GWh | Apr 2024 | Dec 2024 | Solar |
| Beloit Solar LLC | PPM Solar LLC | Beloit, KS | Southwest Power Pool (SWPP) | 4.1 GWh | May 2022 | Dec 2025 | Solar |
| PP Jaguar BESS LLC | PP Jaguar BESS LLC | Axtell, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 5.3 GWh | Nov 2025 | Jun 2026 | Electricity used for energy storage |
| McIntosh (AL) | PowerSouth Energy Cooperative | McIntosh, AL | Southern Company Services, Inc. - Trans (SOCO) | 315.3 GWh | May 1991 | Dec 2025 | Natural Gas : 99.9% |
| Lowman Energy Center | PowerSouth Energy Cooperative | Leroy, AL | Southern Company Services, Inc. - Trans (SOCO) | 4.2 TWh | May 1969 | Jun 2026 | Natural Gas |
| Gantt | PowerSouth Energy Cooperative | Andalusia, AL | Southern Company Services, Inc. - Trans (SOCO) | 5.7 GWh | Dec 1925 | Dec 2025 | Water |
| McWilliams | PowerSouth Energy Cooperative | Gantt, AL | Southern Company Services, Inc. - Trans (SOCO) | 3.5 TWh | Nov 1954 | Jun 2026 | Natural Gas |
| Point A | PowerSouth Energy Cooperative | Andalusia, AL | Southern Company Services, Inc. - Trans (SOCO) | 13.4 GWh | Dec 1924 | Dec 2025 | Water |
| CCG Marketing | Powerflex | West Caldwell, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Jun 2018 | Dec 2025 | Solar |
| ALDI DC 2 | Powerflex | South Windsor, CT | ISO New England (ISNE) | 1.3 GWh | Jan 2018 | Dec 2025 | Solar |
| CBP Solar | Powerflex | Buchanan, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2018 | Dec 2025 | Solar |
| Kinder Morgan Fordham | Powerflex | Staten Island, NY | New York Independent System Operator (NYIS) | 3.8 GWh | May 2018 | Dec 2025 | Solar |
| Prologis L.P | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 5.9 GWh | Jul 2018 | Dec 2025 | Solar |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Aug 2025 | Solar |
| Corbin Russwin Phase 3 Berlin | Powerflex | Berlin, CT | ISO New England (ISNE) | 1.6 GWh | Mar 2018 | Dec 2025 | Solar |
| Colonial Pipeline Woodbury West Deptford | Powerflex | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Apr 2018 | Dec 2025 | Solar |
| Colonial Pipeline Allentown Chesterfield | Powerflex | Chesterfield, NJ | PJM Interconnection, LLC (PJM) | 2.8 GWh | Jun 2018 | Dec 2025 | Solar |
| Chanel Piscataway Rooftop | Powerflex | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 2.9 GWh | Sep 2018 | Dec 2025 | Solar |
| Ticket Network South Windsor | Powerflex | South Windsor, CT | ISO New England (ISNE) | 1.6 GWh | Apr 2018 | Dec 2024 | Solar |
| Allied Beverages Elizabeth | Powerflex | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 5.1 GWh | May 2018 | Dec 2025 | Solar |
| PowerFin Kingsbery | PowerFin ASL 1, LLC | Austin, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.0 GWh | Feb 2018 | Dec 2025 | Solar |
| Citrus City | Power Depot Group A, LLC | Mission, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 99.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| Westover | Power Depot Group A, LLC | Odessa, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 100.0 MWh | Aug 2013 | Dec 2025 | Distillate Fuel Oil |
| Villa Cavasos | Power Depot Group A, LLC | Brownsville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 115.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| Vaquero | Power Depot Group A, LLC | Harlingen, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 120.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| Tumbleweed | Power Depot Group A, LLC | Andrews, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 132.0 MWh | Jun 2013 | Dec 2025 | Distillate Fuel Oil |
| Stonegate | Power Depot Group A, LLC | Katy, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 113.0 MWh | Jun 2013 | Dec 2025 | Distillate Fuel Oil |
| Bakke | Power Depot Group A, LLC | Andrews, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 107.0 MWh | Jun 2013 | Dec 2025 | Distillate Fuel Oil |
| Santa Rosa | Power Depot Group A, LLC | Santa Rosa, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 112.0 MWh | Sep 2013 | Dec 2025 | Distillate Fuel Oil |
| Ridge Rd | Power Depot Group A, LLC | Alamo, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 122.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| Southwick | Power Depot Group A, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 65.0 MWh | Oct 2013 | Dec 2025 | Distillate Fuel Oil |
| Clara | Power Depot Group A, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 110.0 MWh | Jun 2013 | Dec 2025 | Distillate Fuel Oil |
| Mckeever | Power Depot Group A, LLC | Fresno, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 80.0 MWh | Sep 2013 | Dec 2025 | Distillate Fuel Oil |
| Cutten | Power Depot Group A, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 126.0 MWh | Aug 2013 | Dec 2025 | Distillate Fuel Oil |
| Goldsmith | Power Depot Group A, LLC | Goldsmith, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 101.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| N. Mary Francis | Power Depot Group A, LLC | Odessa, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 116.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| GCWA | Power Depot Group A, LLC | Texas City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 67.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| Frankel | Power Depot Group A, LLC | Andrews, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 67.0 MWh | Jun 2013 | Dec 2025 | Distillate Fuel Oil |
| E. Porte Ct. | Power Depot Group A, LLC | Harlingen, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 96.0 MWh | Jul 2013 | Dec 2025 | Distillate Fuel Oil |
| Power County Wind Park South | Power County Wind Park South LLC | American Falls, ID | PacifiCorp East (PACE) | 56.8 GWh | Nov 2011 | Dec 2025 | Wind |
| Power County Wind Park North | Power County Wind Park North LLC | American Falls, ID | PacifiCorp East (PACE) | 63.9 GWh | Nov 2011 | Dec 2025 | Wind |
| Massena Energy Facility | Power City Partners LP | Massena, NY | New York Independent System Operator (NYIS) | 43.6 GWh | Jun 1992 | Oct 2025 | Natural Gas |
| Powells Creek Solar - Hybrid | Powells Creek Farm Solar, LLC | Alton, VA | PJM Interconnection, LLC (PJM) | 151.9 GWh | Jul 2023 | Jun 2026 | Solar |
| Powell Valley | Powell Valley Electric Coop | Kyles Ford, TN | Tennessee Valley Authority (TVA) | 934.0 MWh | Jun 2000 | Dec 2025 | Distillate Fuel Oil |
| Coyote Ridge Community Solar | Poudre Valley REA, Inc | Fort Collins, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 3.0 GWh | Sep 2017 | Dec 2025 | Solar |
| NY Potsdam 28 Hamilton St. Solar | Potsdam Community Solar 2, LLC | Potsdam, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Dec 2023 | Dec 2025 | Solar |
| Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 55.9 GWh | Mar 2016 | Dec 2025 | Landfill Gas |
| Potomac Energy Center, LLC | Potomac Energy Center LLC | Leesburg, VA | PJM Interconnection, LLC (PJM) | 4.8 TWh | Mar 2017 | Jun 2026 | Natural Gas |
| Portland (PA) | Portland Power, LLC | Mt. Bethel, PA | PJM Interconnection, LLC (PJM) | 9.8 GWh | Sep 1958 | Dec 2025 | Distillate Fuel Oil |
| Round Butte | Portland General Electric Co | Madras, OR | Portland General Electric Company (PGE) | 772.4 GWh | Jul 1964 | Dec 2025 | Water |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |