Gadsby
1407 West North Temple Rear, Salt Lake City, UT 84104Plant Summary Information
Gadsby is ranked #13 out of 123 power plants in Utah in terms of total annual net electricity generation.
Gadsby is comprised of 6 generators and generated 65.8 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Gadsby |
|---|---|
| Utility Name | PacifiCorp |
| Location | Salt Lake County, UT |
| Initial Operation Date | September 1951 |
| Last Update | Sep 2025 |
| Annual Generation | 281.5 GWh |
| Annual Consumption | 5.1 M MMBtu |
| Ranked #2,032 out of 12,539 Power Plants Nationwide | |
| Ranked #658 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #13 out of 123 Utah Power Plants | |
| Ranked #5 out of 23 Utah Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Gadsby
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gadsby.
Monthly Net Generation for Gadsby
Gadsby Details
| Summary Information | |
|---|---|
| Plant Name | Gadsby (3648) |
| Plant Address | 1407 West North Temple Rear, Salt Lake City, UT 84104 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 40.7686, -111.9289 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | September 1951 |
| Annual Generation | 281.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Jordan River |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 46.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | QUESTAR GAS COMPANY |
| Natural Gas Storage | No |
Generator 1 Details Operating September 1951
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 69 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 64 MW |
| Winter Capacity | 64 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1951 |
|---|---|
| Planned Retirement | December 2032 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Subcritical Technology | No |
| Multiple Fuels | No |
Generator 2 Details Operating December 1952
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 69 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 69 MW |
| Winter Capacity | 69 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1952 |
|---|---|
| Planned Retirement | December 2032 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 3 Details Operating June 1955
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 113.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 104.5 MW |
| Winter Capacity | 104.5 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1955 |
|---|---|
| Planned Retirement | December 2032 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 4 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.4 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.6 MW |
| Winter Capacity | 40.7 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Planned Retirement | December 2032 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 5 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.4 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 39.6 MW |
| Winter Capacity | 40.7 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Planned Retirement | December 2032 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 6 Details Operating August 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.4 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 36.9 MW |
| Winter Capacity | 40.7 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2002 |
| Planned Retirement | December 2032 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Gadsby Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #648 | World Generation X | North Tonawanda, NY | 307.8 GWh |
| #649 | Sycamore Cogeneration | Bakersfield, CA | 304.3 GWh |
| #650 | Lake Catherine | Jones Mill, AR | 299.6 GWh |
| #651 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 299.0 GWh |
| #652 | Larsen Memorial | Lakeland, FL | 298.1 GWh |
| #653 | Yellowstone County Generating Station | Laurel, MT | 296.7 GWh |
| #654 | Sylvarena | Raleigh, MS | 294.3 GWh |
| #655 | Mark One Power Station | Angleton, TX | 285.7 GWh |
| #656 | Big Sandy Peaker Plant | Kenona, WV | 285.3 GWh |
| #657 | South Harper | Kansas City, MO | 284.5 GWh |
| #659 | West Campus Cogeneration Facility | Madison, WI | 282.0 GWh |
| #660 | Corpus Refinery | Corpus Christi, TX | 280.5 GWh |
| #661 | US Borax | Boron, CA | 279.4 GWh |
| #662 | Harry D Mattison Gas Plant | Tontitown, AR | 278.7 GWh |
| #663 | Ames Electric Services Power Plant | Ames, IA | 305.6 GWh |
| #664 | Manchief Electric Generating Station | Brush, CO | 272.4 GWh |
| #665 | West Point (PA) | West Point, PA | 272.0 GWh |
| #666 | Frank Knutson | Commerce City, CO | 275.6 GWh |
| #667 | Denton Energy Center | Denton, TX | 270.4 GWh |
| #668 | Holden | Holden, MO | 282.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gadsby.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bountiful City | Bountiful, UT | 28.4 GWh | 8.5 mi |
| Copperton Solar Plant No. 1 | Bingham Canyon, UT | 648.0 MWh | 15.6 mi |
| Gateway | Mountain Green, UT | 14.9 GWh | 25.9 mi |
| Granite | Salt lake City, UT | 5.2 GWh | 12.9 mi |
| Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 8.2 GWh | 25 mi |
| HTW Plant 303 COGEN | Salt Lake City, UT | 47.3 GWh | 4.6 mi |
| Jordanelle Dam Hydroelectric Project | Heber, UT | 51.0 GWh | 29 mi |
| Kennecott Power Plant | Magna, UT | 159.9 GWh | 10.9 mi |
| Little Cottonwood | Sandy, UT | 10.3 GWh | 14.4 mi |
| Murray Turbine | Murray, UT | 37.3 GWh | 7.1 mi |
| Salt Lake Energy Systems | Salt Lake City, UT | 24.3 GWh | 5.7 mi |
| Salt Palace Solar Gen Plant | Salt Lake City, UT | 1.2 GWh | 1.8 mi |
| Snake Creek | Midway, UT | 5.6 GWh | 27.2 mi |
| Snowbird Power Plant | Snowbird, UT | 14.7 GWh | 19.3 mi |
| Stairs | Salt Lake City, UT | 3.2 GWh | 13.6 mi |
| Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 199.9 GWh | 2.1 mi |
| Trans-Jordan Generating Station | South Jordan, UT | 36.5 GWh | 16.7 mi |
| Wanship | Wanship, UT | 9.0 GWh | 27.5 mi |
| Weber State University - Davis Campus PV | Layton, UT | 2.7 GWh | 23 mi |
| West Valley Generation Project | West Valley City, UT | 452.3 GWh | 8.9 mi |