Key
10322 North Keys Road, Brandywine, MD 20613Plant Summary Information
Key is ranked #2 out of 226 power plants in Maryland in terms of total annual net electricity generation.
Key is comprised of 3 generators and generated 1.0 TWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Key |
|---|---|
| Utility Name | Parkway Generation Keys Energy Center LLC |
| Location | Prince George's County, MD |
| Initial Operation Date | July 2018 |
| Last Update | May 2026 |
| Annual Generation | 4.4 TWh |
| Annual Consumption | 34.1 M MMBtu |
| Ranked #254 out of 13,081 Power Plants Nationwide | |
| Ranked #124 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #2 out of 226 Maryland Power Plants | |
| Ranked #1 out of 19 Maryland Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
PSEG Keys Energy Center, LLC (2015 to 2024) Parkway Generation Keys Energy Center LLC (2025 to 2025) |
Map of Key
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Key.
Monthly Net Generation for Key
Monthly Plant Fuel Consumption for Key
Key Details
| Summary Information | |
|---|---|
| Plant Name | Key (60302) |
| Plant Address | 10322 North Keys Road, Brandywine, MD 20613 |
| Utility | Parkway Generation Keys Energy Center LLC (60100) |
| Latitude, Longitude | 38.69552, -76.82779 |
| Generation Dates on File | Jul 2018 to May 2026 |
| Initial Operation Date | July 2018 |
| Annual Generation | 4.4 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 19-131 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | WSSC Water |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Potomac Electric Power Co (15270) MD |
| Grid Voltage | 525.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | DOMINION COVE POINT LNG LP |
| Natural Gas Storage | No |
Generator 10 Details Operating July 2018
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | CHELTENH 19 KV STG10 GEN |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CHELTENH 19 KV STG10 GEN |
| Nameplate Capacity | 359.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 766.1 MW |
| Winter Capacity | 777.7 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Subcritical Technology | No |
| Planned Net Summer Capacity Uprate | 3 MW |
| Planned Net Winter Capacity Uprate | 3 MW |
| Planned Uprate | November 2027 |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 11 Details Operating July 2018
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | CHELTENH 19 KV STG10 GEN |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CHELTENH 19 KV STG10 GEN |
| Nameplate Capacity | 235.5 MW |
| Nameplate Power Factor | 0.85 |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 20 MW |
| Planned Net Winter Capacity Uprate | 20 MW |
| Planned Uprate | November 2027 |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 12 Details Operating July 2018
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | CHELTENH 19 KV STG10 GEN |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CHELTENH 19 KV STG10 GEN |
| Nameplate Capacity | 235.5 MW |
| Nameplate Power Factor | 0.85 |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 20 MW |
| Planned Net Winter Capacity Uprate | 20 MW |
| Planned Uprate | November 2027 |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Key Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #114 | CPV Valley Energy Center | Wawayanda, NY | 4.7 TWh |
| #115 | Choctaw County | French Camp, MS | 4.7 TWh |
| #116 | TalenEnergy Montour | Washingtonville, PA | 4.7 TWh |
| #117 | Rio Nogales Power Project | Seguin, TX | 4.6 TWh |
| #118 | St. Charles Power Station (LA) | La Place, LA | 4.6 TWh |
| #119 | Buck | Salisbury, NC | 4.5 TWh |
| #120 | Channel Energy Center LLC | Pasadena, TX | 4.5 TWh |
| #121 | Jack County | Bridgeport, TX | 4.5 TWh |
| #122 | Lower Mount Bethel Energy | Bangor, PA | 4.5 TWh |
| #123 | Ouachita | Sterlington, LA | 4.4 TWh |
| #125 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 4.4 TWh |
| #126 | Washington Energy Facility | Beverly, OH | 4.4 TWh |
| #127 | Tenaska Virginia Generating Station | Scottsville, VA | 4.4 TWh |
| #128 | Lowman Energy Center | Leroy, AL | 4.4 TWh |
| #129 | Oneta Energy Center | Broken Arrow, OK | 4.4 TWh |
| #130 | Tenaska Frontier Generation Station | Shiro, TX | 4.3 TWh |
| #131 | West Riverside Energy Center | Beloit, WI | 4.2 TWh |
| #132 | Linden Generating Station | Linden, NJ | 4.3 TWh |
| #133 | L V Sutton Combined Cycle | Wilmington, NC | 4.2 TWh |
| #134 | Jasper | Hardeeville, SC | 4.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Key.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beech Road (CSG) | Temple Hill, MD | 7.9 GWh | 10.5 mi |
| Bluefin Origination 1 | Brandywine, MD | 2.2 GWh | 2.5 mi |
| Brandywine Power Facility | Brandywine, MD | 816.7 GWh | 2.9 mi |
| Brown Station Road Plant II | Upper Marlboro, MD | 11.0 MWh | 10.7 mi |
| CPV St Charles Energy Center | Waldorf, MD | 3.7 TWh | 9.4 mi |
| First Baptist Church of Glenarden | Upper Marlboro, MD | 2.7 GWh | 8.9 mi |
| Hall Property | Upper Marlboro, MD | 3.1 GWh | 4.5 mi |
| Herbert Farm Solar | Hughesville, MD | 6.5 GWh | 10.5 mi |
| Holly Spring Meadows | District Heights, MD | 2.0 GWh | 12.4 mi |
| Kirby Road Solar, LLC | Clinton, MD | 2.4 GWh | 7.7 mi |
| Livingston Crossing (CSG) | Clinton, MD | 1.0 GWh | 8.1 mi |
| MNCPPC Randall Farm | Upper Marlboro, MD | 2.3 GWh | 9.5 mi |
| OER Monarch CSG | Upper Marlboro, MD | 3.4 GWh | 7.5 mi |
| OER Patuxent CSG | Lothian, MD | 4.2 GWh | 12.6 mi |
| Rockfish Solar LLC | Waldorf, MD | 13.8 GWh | 7.6 mi |
| Sol Phoenix | Capitol Heights, MD | 3.6 GWh | 12.5 mi |
| Synergen Panorama, LLC CSG | Fort Washington, MD | 8.3 GWh | 9.5 mi |
| Upper Marlboro 1 CSG | Upper Marlboro, MD | 2.3 GWh | 6.6 mi |
| WMATA - Naylor Rd. Metro | Temple Hills, MD | 2.6 GWh | 12.8 mi |
| WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 2.5 GWh | 12.8 mi |