Stillwater Wind, LLC
2A Eder Road, Reed Point, MT 59069Plant Summary Information
Stillwater Wind, LLC is ranked #24 out of 70 power plants in Montana in terms of total annual net electricity generation.
Stillwater Wind, LLC generated 45.4 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Stillwater Wind, LLC |
---|---|
Utility Name | Pattern Operators LP |
Location | Stillwater County, MT |
Initial Operation Date | October 2018 |
Last Update | Jun 2025 |
Annual Generation | 265.5 GWh |
Annual Consumption | 971.4 k MMBtu |
Ranked #2,083 out of 12,513 Power Plants Nationwide | |
Ranked #634 out of 1,359 Wind Power Plants Nationwide | |
Ranked #24 out of 70 Montana Power Plants | |
Ranked #8 out of 22 Montana Wind Power Plants | |
Fuel Types | Wind |
Map of Stillwater Wind, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stillwater Wind, LLC.
Monthly Net Generation for Stillwater Wind, LLC
Stillwater Wind, LLC Details
Summary Information | |
---|---|
Plant Name | Stillwater Wind, LLC (61858) |
Plant Address | 2A Eder Road, Reed Point, MT 59069 |
Utility | Pattern Operators LP (56545) |
Latitude, Longitude | 45.86584, -109.47665 |
Generation Dates on File | Oct 2018 to Jun 2025 |
Initial Operation Date | October 2018 |
Annual Generation | 265.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF17-1481-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | NorthWestern Energy (NWMT) (NWMT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator WT Details Operating October 2018
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 79.7 MW |
Summer Capacity | 79.7 MW |
Winter Capacity | 79.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 31 |
Turbine Details | |
Number Of Turbines | 31 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-108 |
Design Wind Speed | 24.6 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 80 |
Stillwater Wind, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#624 | Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh |
#625 | Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh |
#626 | Campbell Hill Windpower | Glenrock, WY | 271.9 GWh |
#627 | Alta Wind XI | Mojave, CA | 269.5 GWh |
#628 | Meadow Lake Wind Farm III LLC | Lafayette, IN | 269.3 GWh |
#629 | Wheatridge 1 | Lexington, OR | 268.7 GWh |
#630 | Hatchet Ridge Wind Project | Burney, CA | 268.2 GWh |
#631 | Notrees Windpower Hybrid | Goldsmith, TX | 263.7 GWh |
#632 | Kibby Wind Facility | Chain of Ponds, ME | 266.9 GWh |
#633 | Borderlands Wind, LLC | Quemado, NM | 266.0 GWh |
#635 | Shiloh III Wind Project LLC | Birds Landing, CA | 265.2 GWh |
#636 | Bull Creek Wind | O'Donnell, TX | 265.2 GWh |
#637 | Mehoopany Wind Energy LLC | Noxen, PA | 265.0 GWh |
#638 | Apple Blossom Wind Farm | Pigeon, MI | 264.9 GWh |
#639 | Gray County Wind Energy | Montezuma, KS | 264.1 GWh |
#640 | Mendota Hills, LLC | Paw Paw, IL | 263.7 GWh |
#641 | Harvest Wind Project | Roosevelt, WA | 263.7 GWh |
#642 | Copenhagen Wind Farm | Copenhagen, NY | 263.7 GWh |
#643 | Windstar 1 | Tehachapi, CA | 263.0 GWh |
#644 | Blue Canyon Windpower V LLC | Carnegie, OK | 262.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stillwater Wind, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Timber Wind Farm | Big Timber, MT | 67.2 GWh | 8.3 mi |
Elk Basin Gasoline Plant | Powell, WY | 6.7 GWh | 68.5 mi |
Garland Canal Power Plant | Powell, WY | 9.2 GWh | 84.2 mi |
Gordon Butte Wind LLC | Martinsdale, MT | 72.8 GWh | 55.9 mi |
Judith Gap Wind Energy Center | Harlowton, MT | 414.1 GWh | 50.6 mi |
Magpie Solar, LLC | Lavina, MT | 5.5 GWh | 39.1 mi |
MTSUN | Billings, MT | 172.3 GWh | 42.1 mi |
Musselshell Wind Project | Shawmut, MT | 23.1 GWh | 28.3 mi |
Musselshell Wind Project Two LLC | Shawmut, MT | 26.5 GWh | 28.3 mi |
Mystic | Fishtail, MT | 53.7 GWh | 46.3 mi |
Pryor Mountain Wind | Bridger, MT | 748.5 GWh | 61.5 mi |
River Bend Solar, LLC (MT) | Reed Point, MT | 3.4 GWh | 12 mi |
South Dry Creek Hydro | Red Lodge, MT | 3.8 GWh | 48 mi |
South Mills Solar, LLC | Hardin, MT | 5.4 GWh | 89.3 mi |
Two Dot Wind Broadview East LLC | Broadview, MT | 4.2 GWh | 36.1 mi |
Two Dot Wind Farm | Two Dot, MT | 34.8 GWh | 49.8 mi |
Western Sugar Cooperative - Billings | Billings, MT | 5.3 GWh | 47.6 mi |
Yellowstone County Generating Station | Laurel, MT | 239.3 GWh | 37.3 mi |
Yellowstone Energy LP | Billings, MT | 422.7 GWh | 50.6 mi |
Yellowtail | Hardin, MT | 798.4 GWh | 83 mi |