Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| McPherson 2 | City of McPherson - (KS) | McPherson, KS | Southwest Power Pool (SWPP) | 15.2 GWh | May 1973 | Dec 2024 | Natural Gas : 72.6% Distillate Fuel Oil : 27.4% |
| Crete | City of Crete | Crete, NE | Southwest Power Pool (SWPP) | 89.0 MWh | May 1973 | Dec 2024 | Natural Gas : 61.5% Distillate Fuel Oil : 38.5% |
| Hallam | Nebraska Public Power District | Hallam, NE | Southwest Power Pool (SWPP) | 3.4 GWh | May 1973 | Dec 2024 | Distillate Fuel Oil : 71.2% Natural Gas : 28.8% |
| Hebron | Nebraska Public Power District | Hebron, NE | Southwest Power Pool (SWPP) | 5.2 GWh | May 1973 | Dec 2024 | Distillate Fuel Oil |
| McCook | Nebraska Public Power District | McCook, NE | Southwest Power Pool (SWPP) | 3.8 GWh | May 1973 | Dec 2024 | Distillate Fuel Oil |
| Jones Street | Omaha Public Power District | Omaha, NE | Southwest Power Pool (SWPP) | 15.6 GWh | May 1973 | Dec 2024 | Distillate Fuel Oil |
| Clark (NVE) | Nevada Power Co | Las Vegas, NV | Nevada Power Company (NEVP) | 896.4 GWh | May 1973 | Sep 2025 | Natural Gas |
| West Lorain | Vermillion Power LLC | Lorain, OH | PJM Interconnection, LLC (PJM) | 1.7 TWh | May 1973 | Dec 2024 | Natural Gas : 99.9% |
| Plant No 2 Freeport | Village of Freeport - (NY) | Freeport, NY | New York Independent System Operator (NYIS) | 31.1 GWh | Apr 1973 | Dec 2024 | Natural Gas : 99.7% |
| Fitchburg | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 MWh | Apr 1973 | Dec 2024 | Natural Gas |
| Elroy | City of Elroy - (WI) | Elroy, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 MWh | Apr 1973 | Dec 2024 | Distillate Fuel Oil |
| Bayboro | Duke Energy Florida, LLC | St. Petersburg, FL | Duke Energy Florida, Inc. (FPC) | 3.8 GWh | Mar 1973 | Dec 2024 | Distillate Fuel Oil |
| Carlls Corner | Calpine New Jersey Generation LLC | Upper Deerfield Twp, NJ | PJM Interconnection, LLC (PJM) | 5.9 GWh | Mar 1973 | Jun 2024 | Natural Gas : 78.1% Kerosene : 21.9% |
| Roosevelt | Salt River Project | Roosevelt, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 101.8 GWh | Feb 1973 | Dec 2024 | Water |
| Stockton Hydro | USCE-Kansas City District | Stockton, MO | Southwestern Power Administration (SPA) | 53.0 GWh | Feb 1973 | Dec 2024 | Water |
| Cumberland (TN) | Tennessee Valley Authority | Cumberland City, TN | Tennessee Valley Authority (TVA) | 9.5 TWh | Feb 1973 | Sep 2025 | Bituminous Coal : 97.7% Distillate Fuel Oil : 1.2% Refined Coal : 1.1% |
| Wheaton | Northern States Power Co - Minnesota | Eau Claire, WI | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 GWh | Dec 1972 | Dec 2024 | Natural Gas : 96.6% Distillate Fuel Oil : 3.4% |
| Surry | Virginia Electric & Power Co | Surry, VA | PJM Interconnection, LLC (PJM) | 14.0 TWh | Nov 1972 | Sep 2025 | Nuclear |
| Transalta Centralia Generation | TransAlta Centralia Gen LLC | Centralia, WA | Bonneville Power Administration (BPAT) | 3.3 TWh | Nov 1972 | Sep 2025 | Subbituminous Coal : 99.7% |
| FirstEnergy Harrison Power Station | Monongahela Power Co | Haywood, WV | PJM Interconnection, LLC (PJM) | 10.1 TWh | Nov 1972 | Sep 2025 | Refined Coal : 99.8% |
| North Loop | Tucson Electric Power Co | Tucson, AZ | Tucson Electric Power (TEPC) | 2.5 GWh | Nov 1972 | Dec 2024 | Natural Gas |
| Wilson | Georgia Power Co | Waynesboro, GA | Southern Company Services, Inc. - Trans (SOCO) | 1.6 GWh | Nov 1972 | Dec 2024 | Distillate Fuel Oil |
| Devil Canyon | California Dept. of Water Resources | San Bernardino, CA | California Independent System Operator (CISO) | 790.6 GWh | Nov 1972 | Sep 2025 | Water |
| Quad Cities Generating Station | Constellation Nuclear | Cordova, IL | PJM Interconnection, LLC (PJM) | 15.2 TWh | Nov 1972 | Sep 2025 | Nuclear |
| Ozark | USCE-Little Rock District | Ozark, AR | Southwestern Power Administration (SPA) | 314.7 GWh | Oct 1972 | Dec 2024 | Water |
| New Madrid | Associated Electric Coop, Inc | New Madrid, MO | Associated Electric Cooperative, Inc. (AECI) | 6.6 TWh | Sep 1972 | Sep 2025 | Subbituminous Coal : 77.2% Refined Coal : 22.8% |
| Powerton | Midwest Generations EME LLC | Pekin, IL | PJM Interconnection, LLC (PJM) | 2.9 TWh | Aug 1972 | Sep 2025 | Subbituminous Coal : 99.7% |
| Bowline Point | Bowline, LLC | West Haverstraw, NY | New York Independent System Operator (NYIS) | 1.9 TWh | Aug 1972 | Aug 2025 | Natural Gas : 98.3% Residual Fuel Oil : 1.7% |
| Warren | Warren Generation, LLC | Warren, PA | PJM Interconnection, LLC (PJM) | 16.6 GWh | Aug 1972 | Nov 2024 | Natural Gas |
| Deerhaven Generating Station | Gainesville Regional Utilities | Gainesville, FL | Gainesville Regional Utilities (GVL) | 750.0 GWh | Jul 1972 | Sep 2025 | Natural Gas : 97.2% Bituminous Coal : 1.8% Residual Fuel Oil : 1.1% |
| State Center | City of State Center - (IA) | State Center, IA | Midcontinent Independent System Operator, Inc. (MISO) | 75.0 MWh | Jul 1972 | Dec 2024 | Distillate Fuel Oil : 63.9% Natural Gas : 36.1% |
| Anthony | City of Anthony - (KS) | Anthony, KS | Southwest Power Pool (SWPP) | 4.0 MWh | Jul 1972 | Dec 2024 | Natural Gas : 92.6% Distillate Fuel Oil : 7.4% |
| Wellington 1 | City of Wellington - (KS) | Wellington, KS | Southwest Power Pool (SWPP) | 6.5 GWh | Jul 1972 | Dec 2024 | Natural Gas : 99.9% |
| Mill Creek (KY) | Louisville Gas & Electric Co | Louisville, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 6.9 TWh | Jul 1972 | Sep 2025 | Bituminous Coal : 99.6% |
| Hillburn | Alliance NYGT, LLC | Hillburn, NY | New York Independent System Operator (NYIS) | 527.0 MWh | Jun 1972 | Dec 2024 | Natural Gas |
| Shoemaker | Alliance NYGT, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 336.0 MWh | Jun 1972 | Nov 2024 | Natural Gas |
| Nueces Bay | City of San Antonio - (TX) | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.7 TWh | Jun 1972 | Sep 2025 | Natural Gas |
| Vitro Architectural Glass (PA) | Vitro Architectural Glass (PA) | Carlisle, PA | PJM Interconnection, LLC (PJM) | 89.0 MWh | Jun 1972 | Dec 2024 | Distillate Fuel Oil |
| Big Cajun 1 | Louisiana Generating LLC | Jarreau, LA | Midcontinent Independent System Operator, Inc. (MISO) | 151.0 GWh | May 1972 | Dec 2024 | Natural Gas |
| Station H | City of Independence - (MO) | Independence, MO | Southwest Power Pool (SWPP) | 15.1 GWh | May 1972 | Dec 2024 | Natural Gas : 93.3% Distillate Fuel Oil : 6.7% |
| Station I | City of Independence - (MO) | Independence, MO | Southwest Power Pool (SWPP) | 3.2 GWh | May 1972 | Dec 2024 | Distillate Fuel Oil |
| Don Henry | City of Hastings - (NE) | Hastings, NE | Southwest Power Pool (SWPP) | 644.0 MWh | May 1972 | Dec 2024 | Natural Gas |
| Sarpy County | Omaha Public Power District | Bellevue, NE | Southwest Power Pool (SWPP) | 191.6 GWh | May 1972 | Dec 2024 | Natural Gas : 97.3% Distillate Fuel Oil : 2.7% |
| Glenwood | National Grid Generation LLC | Glenwood Landing, NY | New York Independent System Operator (NYIS) | 2.6 GWh | May 1972 | Dec 2024 | Distillate Fuel Oil |
| James E. Rogers Energy Complex | Duke Energy Carolinas, LLC | Cliffside, NC | Duke Energy Carolinas (DUK) | 5.3 TWh | May 1972 | Sep 2025 | Natural Gas : 51.6% Bituminous Coal : 48.2% |
| Mountain | Mountain Power, LLC | Mount Holly Springs, PA | PJM Interconnection, LLC (PJM) | 3.6 GWh | May 1972 | Dec 2024 | Distillate Fuel Oil |
| Tolna | Tolna Power, LLC | New Freedom, PA | PJM Interconnection, LLC (PJM) | 260.0 MWh | May 1972 | Dec 2024 | Distillate Fuel Oil |
| Williams | South Carolina Genertg Co, Inc | Goose Creek, SC | Dominion Energy South Carolina, Inc. (SCEG) | 2.3 TWh | May 1972 | Sep 2025 | Bituminous Coal : 99.7% |
| Berlin 5 | Green Mountain Power Corp | Berlin, VT | ISO New England (ISNE) | 1.1 GWh | May 1972 | Sep 2025 | Kerosene |
| Tasley | Calpine Mid-Atlantic Generation LLC | Tasley, VA | PJM Interconnection, LLC (PJM) | 2.1 GWh | May 1972 | Dec 2024 | Distillate Fuel Oil |
| Texas Petrochemicals | TPC Group, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 233.8 GWh | May 1972 | Dec 2024 | Natural Gas : 86.0% Other Gas : 14.0% |
| Ames GT | City of Ames - (IA) | Ames, IA | Midcontinent Independent System Operator, Inc. (MISO) | 420.0 MWh | Apr 1972 | Dec 2024 | Distillate Fuel Oil |
| Douglas | Arizona Public Service Co | Douglas, AZ | Arizona Public Service Company (AZPS) | 93.0 MWh | Apr 1972 | Dec 2024 | Distillate Fuel Oil |
| West Phoenix | Arizona Public Service Co | Phoenix, AZ | Arizona Public Service Company (AZPS) | 4.2 TWh | Apr 1972 | Sep 2025 | Natural Gas |
| Saguaro | Arizona Public Service Co | Red Rock, AZ | Arizona Public Service Company (AZPS) | 135.2 GWh | Apr 1972 | Dec 2024 | Natural Gas |
| McClellan (AR) | Arkansas Electric Coop Corp | Camden, AR | Midcontinent Independent System Operator, Inc. (MISO) | 43.3 GWh | Apr 1972 | Dec 2024 | Natural Gas : 92.3% Distillate Fuel Oil : 7.7% |
| P L Bartow | Duke Energy Florida, LLC | St. Petersburg, FL | Duke Energy Florida, Inc. (FPC) | 6.1 TWh | Apr 1972 | Sep 2025 | Natural Gas |
| Northeast (MO) | Evergy Metro | Kansas City, MO | Southwest Power Pool (SWPP) | 27.2 GWh | Apr 1972 | Dec 2024 | Distillate Fuel Oil |
| Miles City GT | Montana-Dakota Utilities Co | Miles City, MT | Midcontinent Independent System Operator, Inc. (MISO) | 331.0 MWh | Apr 1972 | Dec 2024 | Natural Gas : 97.0% Distillate Fuel Oil : 3.0% |
| Narrows Gas Turbines Generating | U S Power Generating Company LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 39.6 GWh | Apr 1972 | Dec 2024 | Natural Gas : 96.7% Distillate Fuel Oil : 3.3% |
| Webster City | City of Webster City - (IA) | Webster City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 809.5 MWh | Mar 1972 | Dec 2024 | Distillate Fuel Oil |
| Inver Hills | Northern States Power Co - Minnesota | Inver Grove Heights, MN | Midcontinent Independent System Operator, Inc. (MISO) | 64.2 GWh | Mar 1972 | Dec 2024 | Natural Gas : 99.7% |
| O W Sommers | City of San Antonio - (TX) | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.5 TWh | Mar 1972 | Dec 2024 | Natural Gas |
| Fort Lupton | Public Service Co of Colorado | Ft. Lupton, CO | Public Service Company of Colorado (PSCO) | 12.4 GWh | Mar 1972 | Dec 2024 | Natural Gas : 92.9% Distillate Fuel Oil : 7.1% |
| Tims Ford | Tennessee Valley Authority | Winchester, TN | Tennessee Valley Authority (TVA) | 37.3 GWh | Feb 1972 | Dec 2024 | Water |
| Brunot Island | Brunot Island Power, LLC | Pittsburg, PA | PJM Interconnection, LLC (PJM) | 54.1 GWh | Feb 1972 | Dec 2024 | Natural Gas |
| Degray | USCE -Vickburg District | Arkadelphia, AR | Midcontinent Independent System Operator, Inc. (MISO) | 211.1 GWh | Jan 1972 | Sep 2025 | Water |
| J Street | Lincoln Electric System | Lincoln, NE | Southwest Power Pool (SWPP) | 413.0 MWh | Jan 1972 | Oct 2024 | Natural Gas : 86.3% Distillate Fuel Oil : 13.7% |
| Castaic | Los Angeles Department of Water & Power | Castaic, CA | Los Angeles Department of Water and Power (LDWP) | 184.2 GWh | Dec 1971 | Sep 2025 | Water |
| Perryman | Constellation Power Source Generation, LLC | Harford County, MD | PJM Interconnection, LLC (PJM) | 195.5 GWh | Dec 1971 | Sep 2025 | Natural Gas : 79.7% Distillate Fuel Oil : 20.3% |
| Piqua Power Plant | City of Piqua - (OH) | Piqua, OH | PJM Interconnection, LLC (PJM) | 2.6 GWh | Dec 1971 | Dec 2024 | Distillate Fuel Oil |
| US Magnesium | US Magnesium | Rowley, UT | PacifiCorp East (PACE) | 82.3 MWh | Dec 1971 | Sep 2024 | Natural Gas |
| West Point (PA) | Merck & Co Inc-West Point | West Point, PA | PJM Interconnection, LLC (PJM) | 272.0 GWh | Dec 1971 | Dec 2024 | Natural Gas |
| International Paper Texarkana Mill | Graphic Packaging International - Texarkana | Queen City, TX | Southwest Power Pool (SWPP) | 336.7 GWh | Dec 1971 | Dec 2024 | Black Liquor : 52.7% Natural Gas : 28.1% Other Biomass Solids : 19.2% |
| Shelby, NC | Electric Glass Fiber America, LLC. | Shelby, NC | Duke Energy Carolinas (DUK) | 39.0 MWh | Dec 1971 | Nov 2024 | Distillate Fuel Oil |
| Woodhull Hospital | Woodhull Hospital | Brooklyn, NY | New York Independent System Operator (NYIS) | 162.0 MWh | Dec 1971 | Dec 2024 | Distillate Fuel Oil |
| Saint Catherine of Siena Medical Center | Saint Catherine of Siena Medical Center | Smithtown, NY | New York Independent System Operator (NYIS) | 14.0 MWh | Dec 1971 | Dec 2024 | Distillate Fuel Oil |
| UMass Boston | MSS Energy Holdings, LLC (d.b.a. Calibrant Energy) | Dorchester, MA | ISO New England (ISNE) | 1.1 GWh | Dec 1971 | Dec 2024 | Solar |
| Waters River | City of Peabody - (MA) | Peabody, MA | ISO New England (ISNE) | 4.8 GWh | Nov 1971 | Nov 2024 | Natural Gas : 78.8% Distillate Fuel Oil : 21.2% |
| Maalaea | Maui Electric Co Ltd | Kihei, HI | 603.0 GWh | Nov 1971 | Sep 2025 | Distillate Fuel Oil | |
| Bernice Lake | Homer Electric Assn Inc | Nikiski, AK | 1.3 GWh | Oct 1971 | Dec 2024 | Natural Gas | |
| Foothill | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 39.6 GWh | Sep 1971 | Dec 2024 | Water |
| Bowen | Georgia Power Co | Cartersville, GA | Southern Company Services, Inc. - Trans (SOCO) | 11.1 TWh | Sep 1971 | Sep 2025 | Bituminous Coal : 99.8% |
| International Paper Valliant OK | International Paper - Valliant | Valliant, OK | Southwest Power Pool (SWPP) | 394.6 GWh | Sep 1971 | Sep 2025 | Black Liquor : 59.3% Natural Gas : 24.9% Other Biomass Solids : 15.8% |
| Loon Lake | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 63.2 GWh | Aug 1971 | Dec 2024 | Water |
| Sibley One | City of Sibley - (IA) | Sibley, IA | Midcontinent Independent System Operator, Inc. (MISO) | 42.0 MWh | Aug 1971 | Dec 2024 | Distillate Fuel Oil : 58.9% Natural Gas : 41.1% |
| Burlington GT | City of Burlington Electric - (VT) | Burlington, VT | ISO New England (ISNE) | 358.0 MWh | Aug 1971 | Dec 2024 | Distillate Fuel Oil |
| John E Amos | Appalachian Power Co | St Albans, WV | PJM Interconnection, LLC (PJM) | 8.3 TWh | Aug 1971 | Sep 2025 | Bituminous Coal : 99.4% Distillate Fuel Oil : 0.6% |
| Arpin Dam | Renewable World Energies LLC | Radisson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Aug 1971 | Dec 2024 | Water |
| Ormond Beach | Ormond Beach Power, LLC | Oxnard, CA | California Independent System Operator (CISO) | 43.1 GWh | Jul 1971 | Aug 2025 | Natural Gas |
| Port Everglades | Florida Power & Light Co | Ft. Lauderdale, FL | Florida Power & Light Co. (FPL) | 6.0 TWh | Jul 1971 | Sep 2025 | Natural Gas : 99.9% |
| Robert S Kerr | USCE-Tulsa District | Keota, OK | Southwestern Power Administration (SPA) | 370.3 GWh | Jun 1971 | Dec 2024 | Water |
| Low Moor | Virginia Electric & Power Co | Covington, VA | PJM Interconnection, LLC (PJM) | 545.0 MWh | Jun 1971 | Dec 2024 | Distillate Fuel Oil |
| Northern Neck | Virginia Electric & Power Co | Warsaw, VA | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 1971 | Dec 2024 | Distillate Fuel Oil |
| West Marinette | Wisconsin Public Service Corp | Peshtigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.6 GWh | May 1971 | Dec 2024 | Natural Gas |
| Tinker | Oklahoma Gas & Electric Co | Oklahoma City, OK | Southwest Power Pool (SWPP) | 30.7 GWh | May 1971 | Dec 2024 | Natural Gas |
| Monticello Nuclear Facility | Northern States Power Co - Minnesota | Monticello, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 TWh | May 1971 | Sep 2025 | Nuclear |
| PSEG Salem Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 17.2 TWh | May 1971 | Sep 2025 | Nuclear |
| Gowanus Gas Turbines Generating | U S Power Generating Company LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 10.9 GWh | May 1971 | Dec 2024 | Natural Gas : 99.9% |
| TalenEnergy Martins Creek | TalenEnergy Martins Creek LLC | Bangor, PA | PJM Interconnection, LLC (PJM) | 2.4 TWh | May 1971 | Sep 2025 | Natural Gas : 98.2% Residual Fuel Oil : 1.7% |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |