West Enfield Hydro
Dam Road, West Enfield, ME 4493Plant Summary Information
West Enfield Hydro is ranked #35 out of 202 power plants in Maine in terms of total annual net electricity generation.
West Enfield Hydro is comprised of 2 generators and generated 13.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | West Enfield Hydro |
---|---|
Utility Name | Brookfield Black Bear Hydro, LLC |
Location | Penobscot County, ME |
Initial Operation Date | April 1988 |
Last Update | Dec 2024 |
Annual Generation | 77.5 GWh |
Annual Consumption | 293.4 k MMBtu |
Ranked #3,588 out of 12,312 Power Plants Nationwide | |
Ranked #404 out of 1,323 Water Power Plants Nationwide | |
Ranked #35 out of 202 Maine Power Plants | |
Ranked #11 out of 50 Maine Water Power Plants | |
Fuel Types | Water |
Map of West Enfield Hydro
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Enfield Hydro.
Monthly Net Generation for West Enfield Hydro
West Enfield Hydro Details
Summary Information | |
---|---|
Plant Name | West Enfield Hydro (10255) |
Plant Address | Dam Road, West Enfield, ME 4493 |
Utility | Brookfield Black Bear Hydro, LLC (59178) |
Latitude, Longitude | 45.2497, -68.6483 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | April 1988 |
Annual Generation | 77.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 86-1003-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Penobscot River |
Ash Impoundment | No |
Transmission / Distribution Owner | Versant Power (1179) ME |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating April 1988
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 6.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.4 MW |
Winter Capacity | 4.4 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1988 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator GEN2 Details Operating April 1988
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 6.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 5.1 MW |
Winter Capacity | 5.1 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1988 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
West Enfield Hydro Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Black Bear Power LLC | 200 Clarendon Street55th Floor, Boston, MA 2117 | Generator GEN1 | 100.00% |
Black Bear Power LLC | 200 Clarendon Street55th Floor, Boston, MA 2117 | Generator GEN2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#394 | Blanchard | Royalton, MN | 81.8 GWh |
#395 | Muck Valley Hydroelectric | NA, CA | 81.8 GWh |
#396 | Iron Gate | Hornbrook, CA | 81.5 GWh |
#397 | El Dorado | Pollock Pines, CA | 80.9 GWh |
#398 | Narrows PH | Grass Valley, CA | 80.8 GWh |
#399 | South Glens Falls Hydroelectric | South Glens Falls, NY | 80.4 GWh |
#400 | Grandfather Falls | Irma, WI | 80.4 GWh |
#401 | Williams Hydro | Solon, ME | 80.2 GWh |
#402 | Upper Mechanicville | Town of Stillwater, NY | 78.7 GWh |
#403 | Drop 4 | Holtville, CA | 78.2 GWh |
#405 | Amoskeag | Manchester, NH | 76.9 GWh |
#406 | Union Valley | Fresh Pond, CA | 76.5 GWh |
#407 | Bennetts Bridge | Altmar, NY | 76.3 GWh |
#408 | Madison Dam | Ennis, MT | 76.2 GWh |
#409 | Swan Lake | Ketchikan, AK | 75.5 GWh |
#410 | Blue Lake Hydro | Sitka, AK | 75.4 GWh |
#411 | E J West | Lake Luzerne, NY | 75.4 GWh |
#412 | Stevens Creek | Martinez, GA | 74.5 GWh |
#413 | Arrowrock Hydroelectric Project | Boise, ID | 73.0 GWh |
#414 | London | Handley, WV | 72.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Enfield Hydro.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brewer (CSG) | Brewer, ME | 1.9 GWh | 31.4 mi |
Broadway Solar (CSG) | Bangor, ME | 5.1 GWh | 28.4 mi |
Corkwood Solar (CSG) | Howland, ME | 5.4 GWh | 1.1 mi |
Dynamic Corinth (CSG) | Corinth, ME | 9.3 GWh | 24.7 mi |
Eastern Maine Medical Center | Bangor, ME | 31.3 GWh | 30.9 mi |
Great Lakes Hydro America - ME | Millinocket, ME | 570.9 GWh | 27.6 mi |
Indeck West Enfield Energy Center | West Enfield, ME | 50.6 GWh | 1 mi |
Maine Independence Station | Veazie, ME | 2.5 TWh | 29.6 mi |
Medway Hydro | Medway, ME | 23.3 GWh | 25.2 mi |
Milford Hydro Station | Milford, ME | 37.2 GWh | 21.3 mi |
Milo CSG | Milo, ME | 6.9 GWh | 17.9 mi |
Milo PV - BD Solar 1 LLC | Milo, ME | 30.8 GWh | 16.7 mi |
Orono B | Orono, ME | 21.3 GWh | 25.2 mi |
Orono Hydro Station | Orono, ME | 5.8 GWh | 25.5 mi |
Passadumkeag Windpark LLC | Greenbush, ME | 133.3 GWh | 24.7 mi |
Pumpkin Hill | Lowell, ME | 3.2 GWh | 9.9 mi |
Rollins Wind Project | Winn Village, ME | 136.1 GWh | 14.6 mi |
Silver Maple | Clifton, ME | 58.7 GWh | 32.9 mi |
Stillwater B | Old Town, ME | 10.5 GWh | 23.4 mi |
Stillwater Hydro Station | Stillwater, ME | 7.0 GWh | 23.6 mi |