Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| 201 Sturbridge B | Altus Power America Management, LLC | Brimfield, MA | ISO New England (ISNE) | 2.1 GWh | May 2014 | Dec 2024 | Solar |
| 205 Sturbridge A | Altus Power America Management, LLC | Brimfield, MA | ISO New England (ISNE) | 2.9 GWh | May 2014 | Dec 2024 | Solar |
| Cardinal | Cardinal Operating Company | Brillant, OH | PJM Interconnection, LLC (PJM) | 10.5 TWh | Jan 1967 | Feb 2026 | Bituminous Coal : 99.7% |
| Brighton PV Solar Plant | Hangar 160 LLC | Brighton, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 3.3 GWh | Nov 2012 | Dec 2024 | Solar |
| Brigham City | Brigham City Corporation | Brigham, UT | PacifiCorp East (PACE) | 7.8 GWh | Dec 1920 | Dec 2024 | Water |
| Source Power Company - Aldrich | Morristown Solar II, LLC | Brier Hill, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Feb 2022 | Dec 2024 | Solar |
| Donald C Cook | Indiana Michigan Power Co | Bridgman, MI | PJM Interconnection, LLC (PJM) | 17.5 TWh | Jul 1975 | Feb 2026 | Nuclear |
| CIP II/AR Bridgewater Holdings - NJCOE | COE Bridgewater LLC c/o Thor Equities, LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 25.4 GWh | Oct 2002 | Feb 2026 | Natural Gas : 99.5% |
| Patriots Stadium | Sunlight General Somerset Solar LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.1 GWh | Aug 2013 | Dec 2024 | Solar |
| Thermo Fisher | MN8 Energy LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jan 2013 | Dec 2024 | Solar |
| Bridgewater Power LP | Bridgewater Power Co LP | Bridgewater, NH | ISO New England (ISNE) | 93.0 GWh | Jul 1987 | Dec 2024 | Wood/Wood Waste Solids : 99.5% |
| Bridgewater Complex Co-Generation Plant | Massachusetts Department of Correction | Bridgewater, MA | ISO New England (ISNE) | 1.1 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Bridgewater Solar CSG | MN8 Energy LLC | Bridgewater, MA | ISO New England (ISNE) | 3.9 GWh | Jul 2015 | Dec 2024 | Solar |
| 10 Finderne Avenue Solar, LLC | Greenbacker Renewable Energy Corporation | Bridgewater Town, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Perdue Bridgeville Photovoltaic | Terraform Arcadia | Bridgeville, DE | PJM Interconnection, LLC (PJM) | 2.0 GWh | Jun 2011 | Dec 2024 | Solar |
| Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2024 | Water |
| NJ Oak Solar Plant | NJR Clean Energy Ventures Corporation | Bridgetown, NJ | PJM Interconnection, LLC (PJM) | 17.2 GWh | Nov 2011 | Dec 2024 | Solar |
| KDC Solar ASGM | CleanCapital Holdings | Bridgeton, NJ | PJM Interconnection, LLC (PJM) | 6.6 GWh | Jun 2019 | Dec 2024 | Solar |
| CCUA Solar | CCUA Solar, LLC | Bridgeton, NJ | PJM Interconnection, LLC (PJM) | 2.6 GWh | Jun 2021 | Dec 2024 | Solar |
| Pryor Mountain Wind | PacifiCorp | Bridger, MT | PacifiCorp East (PACE) | 748.6 GWh | Mar 2021 | Feb 2026 | Wind |
| Chief Joseph | USACE Northwestern Division | Bridgeport, WA | Bonneville Power Administration (BPAT) | 10.7 TWh | Aug 1955 | Feb 2026 | Water |
| Bridgeport Gas Processing Plant | EnLink Midstream Services, LLC | Bridgeport, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 47.9 GWh | Jun 2000 | Dec 2024 | Natural Gas |
| Jack County | Jack County Power, LLC | Bridgeport, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 5.5 TWh | Jan 2006 | Feb 2026 | Natural Gas |
| Bridgeport Energy Project | Bridgeport Energy LLC | Bridgeport, CT | ISO New England (ISNE) | 2.6 TWh | May 1998 | Feb 2026 | Natural Gas |
| Wheelabrator Bridgeport | Wheelabrator Environmental Systems | Bridgeport, CT | ISO New England (ISNE) | 476.1 GWh | Jun 1988 | Feb 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Bridgeport Station | Generation Bridge II Connecticut, LLC | Bridgeport, CT | ISO New England (ISNE) | 3.4 TWh | Jul 1961 | Feb 2026 | Natural Gas : 85.2% Distillate Fuel Oil : 14.8% |
| UB Fuel Cell | UB Fuel Cell | Bridgeport, CT | ISO New England (ISNE) | 10.5 GWh | Mar 2015 | Dec 2023 | Natural Gas |
| UI RCP Bridgeport Seaside | United Illuminating Co | Bridgeport, CT | ISO New England (ISNE) | 18.4 GWh | Oct 2015 | Feb 2026 | Natural Gas : 84.9% Solar : 15.1% |
| Bridgeport Fuel Cell, LLC | Bridgeport Fuel Cell, LLC | Bridgeport, CT | ISO New England (ISNE) | 96.8 GWh | Nov 2013 | Dec 2024 | Natural Gas |
| French's Landfill PV | Altus Power America Management, LLC | Brick, NJ | PJM Interconnection, LLC (PJM) | 5.3 GWh | Sep 2014 | Dec 2024 | Solar |
| Georgia-Pacific Brewton Mill | Georgia-Pacific Brewton LLC | Brewton, AL | Southern Company Services, Inc. - Trans (SOCO) | 499.4 GWh | Sep 1957 | Dec 2024 | Black Liquor : 55.3% Natural Gas : 44.7% |
| DG AMP Solar Brewster | DG AMP Solar, LLC | Brewster, OH | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
| S&P Windfarm LLC | Brewster | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2003 | Dec 2024 | Wind |
| B&K Energy Systems LLC | Brewster | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2003 | Dec 2024 | Wind |
| DL Windy Acres LLC | Brewster | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2003 | Dec 2024 | Wind |
| Cisco | ALLETE Clean Energy | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jan 2008 | Dec 2024 | Wind |
| CVEC Round 4 Brewster Captn Golf Course | Freemans Way Solar Project 2019, LLC | Brewster, MA | ISO New England (ISNE) | 1.1 GWh | Feb 2022 | Dec 2024 | Solar |
| Brewster Landfill | Clean Focus Yield, LLC | Brewster, MA | ISO New England (ISNE) | 5.3 GWh | Aug 2014 | Dec 2024 | Solar |
| Summit - Cicero | MN8 Energy LLC | Brewerton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jan 2024 | Dec 2024 | Solar |
| Brewer (CSG) | Nautilus Solar Solutions | Brewer, ME | ISO New England (ISNE) | 1.9 GWh | Jul 2024 | Dec 2024 | Solar |
| Brevig Mission | Alaska Village Elec Coop, Inc | Brevig Mission, AK | (NA) | 1.3 GWh | May 2010 | Dec 2024 | Distillate Fuel Oil |
| Brentwood Solar | CD US Solar MT1 LLC | Brentwood, NY | New York Independent System Operator (NYIS) | 687.0 MWh | Oct 2011 | Dec 2024 | Solar |
| Edgewood Energy LLC | MPH Cross Island Power | Brentwood, NY | New York Independent System Operator (NYIS) | 39.9 GWh | Jun 2002 | Dec 2024 | Natural Gas |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2024 | Solar |
| Major Oak Power | Major Oak Power, LLC | Bremond, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.2 TWh | Aug 1990 | Feb 2026 | Lignite Coal : 99.8% |
| Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Breese | City of Breese - (IL) | Breese, IL | Midcontinent Independent System Operator, Inc. (MISO) | 263.0 MWh | Nov 1953 | Dec 2024 | Distillate Fuel Oil |
| Gratiot Wind Park | DTE Electric Company | Breckenridge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 234.6 GWh | Oct 2011 | Feb 2026 | Wind |
| Gratiot County Wind LLC | Invenergy Services LLC | Breckenridge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 228.4 GWh | Apr 2012 | Dec 2024 | Wind |
| Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 234.8 GWh | Oct 2012 | Feb 2026 | Landfill Gas |
| Blacksand Generating Facility | Bridge Energy LLC | Brea, CA | California Independent System Operator (CISO) | 39.0 GWh | May 2000 | Dec 2024 | Natural Gas |
| Pastime Farm, LLC | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Staunton | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Exira | Western Minnesota Mun Pwr Agny | Brayton, IA | Southwest Power Pool (SWPP) | 313.7 GWh | Mar 2004 | Dec 2024 | Natural Gas : 99.5% |
| North Brawley Geothermal Plant | Ormat Nevada Inc | Brawley, CA | Imperial Irrigation District (IID) | 16.9 GWh | Sep 2009 | Dec 2024 | Geothermal |
| Rockwood | Imperial Irrigation District | Brawley, CA | Imperial Irrigation District (IID) | 6.8 GWh | May 1979 | Dec 2024 | Natural Gas : 92.0% Distillate Fuel Oil : 8.0% |
| Arrowleaf Solar and Storage | ORNI 30 LLC | Brawley, CA | Imperial Irrigation District (IID) | 11.0 GWh | - | Feb 2026 | Solar |
| Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 982.0 MWh | Nov 2011 | Dec 2024 | Solar |
| Community Solar 1 | Solar Community I LLC | Brawley, CA | Imperial Irrigation District (IID) | 13.9 GWh | May 2014 | Dec 2024 | Solar |
| Spreckels Sugar Company | Spreckels Sugar Company | Brawley, CA | Imperial Irrigation District (IID) | 19.9 GWh | Mar 1948 | Dec 2024 | Natural Gas |
| Technology Drive Solar | Consolidated Edison Development Inc. | Brattleboro, VT | ISO New England (ISNE) | 2.9 GWh | Aug 2014 | Dec 2024 | Solar |
| Brattleboro (Windham Landfill) | Greenbacker Renewable Energy Corporation | Brattleboro, VT | ISO New England (ISNE) | 6.6 GWh | Jul 2018 | Dec 2024 | Solar |
| Table Rock | USCE-Little Rock District | Branson, MO | Southwestern Power Administration (SPA) | 367.8 GWh | Apr 1959 | Dec 2024 | Water |
| Branford | Connecticut Jet Power LLC | Branford, CT | ISO New England (ISNE) | 109.0 MWh | Oct 1967 | Dec 2024 | Kerosene |
| Town of Branford | Tesla Inc. | Branford, CT | ISO New England (ISNE) | 1.6 GWh | May 2018 | Dec 2024 | Solar |
| Bluefin Origination 1 | Bluefin Origination 1, LLC | Brandywine, MD | PJM Interconnection, LLC (PJM) | 3.5 GWh | Oct 2019 | Dec 2024 | Solar |
| Keys Energy Center | PSEG Keys Energy Center, LLC | Brandywine, MD | PJM Interconnection, LLC (PJM) | 4.3 TWh | Jun 2018 | Feb 2026 | Natural Gas |
| Brandywine Power Facility | KMC Thermo, LLC | Brandywine, MD | PJM Interconnection, LLC (PJM) | 707.0 GWh | Jul 1996 | Feb 2026 | Natural Gas : 95.1% Distillate Fuel Oil : 4.9% |
| Selective Insurance | MaxSolar | Branchville, NJ | PJM Interconnection, LLC (PJM) | 4.5 GWh | Oct 2019 | Dec 2024 | Solar |
| Frankford Solar | MN8 Energy LLC | Branchville, NJ | PJM Interconnection, LLC (PJM) | 8.9 GWh | Mar 2012 | Dec 2024 | Solar |
| Imclone Solar Electric Facility | CVI CleanCapital Solar 5 LLC | Branchburg, NJ | PJM Interconnection, LLC (PJM) | 9.7 GWh | Apr 2014 | Dec 2024 | Solar |
| Branch Solar Farm | Oklahoma Gas & Electric Co | Branch, AR | Southwest Power Pool (SWPP) | 10.0 GWh | Sep 2021 | Dec 2024 | Solar |
| Rock Falls Wind Farm LLC | Public Service Co of Oklahoma | Braman, OK | Southwest Power Pool (SWPP) | 386.9 GWh | Nov 2017 | Jan 2026 | Wind |
| Braintree Landfill Solar | Ameresco, Inc - Braintree | Braintree, MA | ISO New England (ISNE) | 1.2 GWh | Nov 2014 | Dec 2024 | Solar |
| Potter Station 2 | Town of Braintree - (MA) | Braintree, MA | ISO New England (ISNE) | 23.3 GWh | Jun 1963 | Dec 2024 | Natural Gas : 93.9% Distillate Fuel Oil : 6.1% |
| Brainerd Public Utilities | Brainerd Public Utilities | Brainerd, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.9 GWh | Dec 1916 | Dec 2023 | Water |
| Brainerd Airport | AEP Onsite Partners, LLC | Brainerd, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Lancaster County Resource Recovery | Covanta Lancaster Inc | Brainbridge, PA | PJM Interconnection, LLC (PJM) | 178.5 GWh | Nov 1990 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.9% Biogenic Municipal Solid Waste : 44.9% |
| Keeversville Solar CSG | Keeversville Solar Energy Center LLC | Braidwood, IL | PJM Interconnection, LLC (PJM) | 3.3 GWh | Jun 2021 | Dec 2024 | Solar |
| Heart of Texas Wind Project | Scout Clean Energy LLC | Brady, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 640.5 GWh | Apr 2020 | Feb 2026 | Wind |
| Rattlesnake Power, LLC | Rattlesnake Power, LLC | Brady, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 581.5 GWh | Aug 2018 | Feb 2026 | Wind |
| Jeffrey | Central Nebraska Pub P&I Dist | Brady, NE | Southwest Power Pool (SWPP) | 86.3 GWh | Dec 1940 | Dec 2024 | Water |
| Gold Mine | Gold Mine Solar, LLC | Bradley, SC | Duke Energy Carolinas (DUK) | 3.0 GWh | Nov 2020 | Dec 2024 | Solar |
| CSL Behring LLC | CSL Behring LLC | Bradley, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Apr 1993 | Dec 2024 | Natural Gas |
| Nacimiento Hydro Project | Monterey Cnty Water Res Agency | Bradley, CA | California Independent System Operator (CISO) | 18.2 GWh | Jun 1987 | Dec 2024 | Water |
| Smith (VT) | Green Mountain Power Corp | Bradford, VT | ISO New England (ISNE) | 1.6 GWh | Nov 1982 | Dec 2024 | Water |
| Alton Road Solar | Revity Energy LLC | Bradford, RI | ISO New England (ISNE) | 23.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Tropicana Products Bradenton | Tropicana Products Inc | Bradenton, FL | Florida Power & Light Co. (FPL) | 154.2 GWh | Jan 1990 | Dec 2024 | Natural Gas |
| Zier Solar | Cypress Creek Renewables | Brackettville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 368.2 GWh | Mar 2024 | Feb 2026 | Solar |
| OCI Alamo 4, LLC | Consolidated Edison Development Inc. | Brackettville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 76.0 GWh | Jul 2014 | Dec 2024 | Solar |
| Anacacho Wind Farm, LLC | Big Sky Wind, LLC | Brackettville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 316.0 GWh | Nov 2012 | Dec 2024 | Wind |
| Braidwood Generation Station | Constellation Nuclear | Braceville, IL | PJM Interconnection, LLC (PJM) | 20.2 TWh | Jun 1988 | Feb 2026 | Nuclear |
| CMEEC - Bozrah | Tesla Inc. | Bozrah, CT | ISO New England (ISNE) | 3.0 GWh | Nov 2016 | Dec 2024 | Solar |
| John H Kerr | USCE-Wilmington District | Boydton, VA | PJM Interconnection, LLC (PJM) | 462.9 GWh | Oct 1952 | Dec 2024 | Water |
| Montgomery County Correctional Facility | Tesla Inc. | Boyds, MD | PJM Interconnection, LLC (PJM) | 2.0 GWh | Oct 2017 | Dec 2024 | Solar |
| MNCPPC Germantown Solar | Standard Solar | Boyds, MD | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jan 2018 | Dec 2024 | Solar |
| Boyd Soccerplex | Madison Energy Investments LLC | Boyds, MD | PJM Interconnection, LLC (PJM) | 354.0 MWh | Mar 2023 | Dec 2024 | Solar |
| Hay River (Dunn 1) | Greenbacker Renewable Energy Corporation | Boyceville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jan 2024 | Dec 2024 | Solar |
| GSPP Boxborough Littleton (MA) | GSPP Boxborough Littleton, LLC | Boxborough, MA | ISO New England (ISNE) | 5.8 GWh | Dec 2018 | Dec 2024 | Solar |
| Talbot County Energy | Oglethorpe Power Corporation | Box Springs, GA | Southern Company Services, Inc. - Trans (SOCO) | 494.2 GWh | Mar 2002 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |