Cedar Valley Solar Plant
7100 North 2300 West, Cedar City, UT 84721Plant Summary Information
Cedar Valley Solar Plant is ranked #43 out of 52 solar farms in Utah in terms of total annual net electricity generation.
Cedar Valley Solar Plant generated 1.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Cedar Valley Solar Plant |
---|---|
Utility Name | Evergreen Wind, LLC |
Location | Iron County, UT |
Initial Operation Date | December 2015 |
Last Update | Dec 2024 |
Annual Generation | 6.0 GWh |
Annual Consumption | 21.8 k MMBtu |
Ranked #7,532 out of 12,288 Power Plants Nationwide | |
Ranked #2,818 out of 6,174 Solar Power Plants Nationwide | |
Ranked #93 out of 120 Utah Power Plants | |
Ranked #43 out of 52 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Wind O&M, LLC (2013 to 2019) Evergreen Wind, LLC (2020 to 2024) |
Map of Cedar Valley Solar Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Valley Solar Plant.
Monthly Net Generation for Cedar Valley Solar Plant
Cedar Valley Solar Plant Details
Summary Information | |
---|---|
Plant Name | Cedar Valley Solar Plant (58599) |
Plant Address | 7100 North 2300 West, Cedar City, UT 84721 |
Utility | Evergreen Wind, LLC (59155) |
Latitude, Longitude | 37.80778, -113.09 |
Generation Dates on File | Dec 2015 to Dec 2024 |
Initial Operation Date | December 2015 |
Annual Generation | 6.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-795-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator CVSP1 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 3.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cedar Valley Solar Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2808 | DG Dighton LLC CSG | Dighton, MA | 6.0 GWh |
#2809 | 25 Ashdown Road Solar, LLC | Clifton Park, NY | 6.0 GWh |
#2810 | DG Iron Mountain | Edison, NJ | 6.0 GWh |
#2811 | Anderson 5 | Anderson, IN | 6.0 GWh |
#2812 | RE Dillard 1 LLC | Sloughhouse, CA | 6.0 GWh |
#2813 | Kingsburg Solar | Kingsburg, CA | 6.0 GWh |
#2814 | Shasta Solar Farm | Fall River Mills, CA | 6.0 GWh |
#2815 | Georgia Power at Swainsboro | Swainsboro, GA | 6.0 GWh |
#2816 | Stromland Solar | Cochrane, WI | 6.0 GWh |
#2817 | Hammer CSG | Clear Lake, MN | 6.0 GWh |
#2819 | DRPA Woodcrest Station Solar Project | Haddon Township, NJ | 6.0 GWh |
#2820 | Saluda Solar II | Saluda, SC | 6.0 GWh |
#2821 | Sawtell Solar | Hendersonville, NC | 6.0 GWh |
#2822 | Church Hill Road Augusta Solar, LLC | Augusta, ME | 6.0 GWh |
#2823 | Clear Solar I, LLC | Forest City, NC | 6.0 GWh |
#2824 | Jackson Solar Farm | Wilson, NC | 6.0 GWh |
#2825 | Maple(CSG) | Bellingham, MA | 5.8 GWh |
#2826 | Finchville Solar, LLC Hybrid CSG | Mt. Hope, NY | 5.9 GWh |
#2827 | WEB Brookfield | Brookfield, MA | 6.0 GWh |
#2828 | Acushnet AD Makepeace | Wareham, MA | 6.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Valley Solar Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 73.1 GWh | 3.4 mi |
Beryl Solar Plant | Beryl, UT | 6.3 GWh | 32.5 mi |
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 27.7 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.9 GWh | 24.6 mi |
Cove Mountain Solar | Beryl, UT | 158.2 GWh | 31.6 mi |
Cove Mountain Solar 2 | Beryl, UT | 317.5 GWh | 32.1 mi |
Enterprise Solar, LLC | Newcastle, UT | 228.7 GWh | 30.8 mi |
Fiddler's Canyon #1 | Cedar City, UT | 7.3 GWh | 9.8 mi |
Fiddler's Canyon #2 | Cedar City, UT | 7.4 GWh | 10.6 mi |
Fiddler's Canyon 3 | Cedar City, UT | 7.5 GWh | 8.7 mi |
Granite Mountain Solar East, LLC | Cedar City, UT | 214.0 GWh | 7.8 mi |
Granite Mountain Solar West, LLC | Cedar City, UT | 128.5 GWh | 12.7 mi |
Iron Springs Solar, LLC | Cedar City, UT | 219.3 GWh | 6.9 mi |
Quichapa 1 | Cedar City, UT | 6.6 GWh | 12.4 mi |
Quichapa 2 | Cedar City, UT | 5.8 GWh | 11.1 mi |
Quichapa 3 | Cedar City, UT | 7.0 GWh | 13.5 mi |
Smithfield 3 | Milford, UT | 5.5 GWh | 28.8 mi |
Thermo No 1 | Milford, UT | 57.7 GWh | 25 mi |
Three Peaks Power | Cedar City, UT | 231.6 GWh | 2.9 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 208.6 GWh | 11.4 mi |