Altona Solar, LLC
Audrain County Rte 123 & Audra, Centralia, MO 65240Plant Summary Information
Altona Solar, LLC is ranked #48 out of 124 power plants in Missouri in terms of total annual net electricity generation.
Altona Solar, LLC generated 14.9 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Altona Solar, LLC |
|---|---|
| Utility Name | Birch Creek Power, LLC |
| Location | Audrain County, MO |
| Initial Operation Date | August 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 64.6 GWh |
| Annual Consumption | 243.0 k MMBtu |
| Ranked #3,866 out of 12,332 Power Plants Nationwide | |
| Ranked #982 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #48 out of 124 Missouri Power Plants | |
| Ranked #8 out of 36 Missouri Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Birch Creek Development (2022 to 2022) Birch Creek Power, LLC (2023 to 2024) |
Map of Altona Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Altona Solar, LLC.
Monthly Net Generation for Altona Solar, LLC
Monthly Plant Fuel Consumption for Altona Solar, LLC
Altona Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Altona Solar, LLC (66628) |
| Plant Address | Audrain County Rte 123 & Audra, Centralia, MO 65240 |
| Utility | Birch Creek Power, LLC (66331) |
| Latitude, Longitude | 39.28345, -92.14203 |
| Generation Dates on File | Aug 2024 to Mar 2026 |
| Initial Operation Date | August 2024 |
| Annual Generation | 64.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Ameren Illinois Company (56697) IL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator PV Details Operating August 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 30 MW |
| Summer Capacity | 30 MW |
| Winter Capacity | 30 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 41 MW |
| Crystalline Silicon | Yes |
| Other Materials | No |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Altona Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #972 | Chaves County Solar II | Roswell, NM | 68.6 GWh |
| #973 | Mililani South Solar Farm | Mililani, HI | 59.5 GWh |
| #974 | Bonnie Mine Solar | Bartow, FL | 67.5 GWh |
| #975 | Peony Solar | Springfield, SC | 66.8 GWh |
| #976 | Cuyama Solar, LLC | Cuyama, CA | 66.1 GWh |
| #977 | Robin Hollow Solar | West Greenwich, RI | 65.5 GWh |
| #978 | Half Moon Solar Plant | FL | 65.4 GWh |
| #979 | Rattler Solar Plant | FL | 65.3 GWh |
| #980 | Chevron - Lost Hills Hybrid | Lost Hills, CA | 64.9 GWh |
| #981 | Babacomari Solar | Huachuca, AZ | 64.8 GWh |
| #983 | Avalon Solar | Pima, AZ | 64.6 GWh |
| #984 | Innovative Solar 43, LLC | Ivanhoe, NC | 64.5 GWh |
| #985 | Hayhurst Texas Solar | Orla, TX | 64.0 GWh |
| #986 | Dry Bridge Solar (Brown University) | North Kingstown, RI | 63.9 GWh |
| #987 | Hayhurst New Mexico Solar | Malaga, NM | 63.5 GWh |
| #988 | San Luis Valley Solar Ranch | Mosca, CO | 63.4 GWh |
| #989 | Pawpaw Solar Plant | Butler, GA | 63.2 GWh |
| #990 | Little Bear Solar 1, LLC | Mendota, CA | 62.6 GWh |
| #991 | Avra Valley Solar | Marana, AZ | 62.5 GWh |
| #992 | Solar Borrego I | Borrego Springs, CA | 62.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Altona Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Audrain Generating Station | Vandalia, MO | 146.4 GWh | 32.4 mi |
| Callaway | Fulton, MO | 7.2 TWh | 41.2 mi |
| Clarence Cannon | Monroe City, MO | 101.1 GWh | 31.4 mi |
| Columbia (MO) | Columbia, MO | 21.6 GWh | 23.9 mi |
| Columbia Energy Center | Columbia, MO | 13.3 GWh | 19.4 mi |
| Envoy Solar, LLC | Mexico, MO | 107.4 GWh | 18 mi |
| Fulton (MO) | Fulton, MO | 161.0 MWh | 30.5 mi |
| Huck Finn Renewable Energy Center | Vandalia, MO | 410.1 GWh | 32.1 mi |
| Macon Energy Center | Macon, MO | 80.7 GWh | 34.7 mi |
| Macon Solar Power Project | Macon, MO | 4.0 GWh | 37 mi |
| Mexico | Mexico, MO | 767.0 MWh | 19.1 mi |
| MJMEUC Generating Station #1 | Laddonia, MO | 86.7 GWh | 26.9 mi |
| Moberly | Moberly, MO | 34.0 MWh | 20.7 mi |
| MU Combined Heat and Power Plant | Columbia, MO | 204.2 GWh | 25.5 mi |
| Shelbina Power #1 | Shelbina, MO | 14.0 MWh | 28.9 mi |
| Shelbina Power #2 | Shelbina, MO | 58.0 MWh | 28.9 mi |
| Shelbina Power #3 | Shelbina, MO | 36.0 MWh | 29 mi |
| Thomas Hill | Clifton Hill, MO | 7.0 TWh | 32.3 mi |
| Truman Solar | Colombia, MO | 22.6 GWh | 23.3 mi |
| Vandalia Renewable Energy Center | MO | 26.5 GWh | 34 mi |