Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.8 GWh | Dec 2013 | Dec 2025 | Solar |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2013 | Dec 2025 | Solar |
| Chadbourn Farm | Strata Manager, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2012 | Dec 2025 | Solar |
| Warrenton Farm | Headwater Energy, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 6.2 GWh | Nov 2012 | Dec 2025 | Solar |
| Mocksville Farm | Strata Manager, LLC | Mocksville, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Oct 2012 | Dec 2025 | Solar |
| Belwood Farm | Palmetto Power Management LLC | Lawndale, NC | Duke Energy Progress East (CPLE) | 6.6 GWh | Nov 2012 | Dec 2025 | Solar |
| Arndt Farm | Strata Manager, LLC | Claremont, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Oct 2012 | Dec 2025 | Solar |
| Railroad Farm | Headwater Energy, LLC | St. Pauls, NC | Duke Energy Progress East (CPLE) | 4.3 GWh | Sep 2012 | Dec 2025 | Solar |
| Watts Farm | Headwater Energy, LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | Jun 2012 | Dec 2025 | Solar |
| Farrington Farm | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Progress East (CPLE) | 1.4 GWh | Mar 2012 | Dec 2025 | Solar |
| Patua Acquisition Project, LLC | Patua Acquisition Company, LLC | Hazen, NV | Nevada Power Company (NEVP) | 103.3 GWh | Nov 2013 | Dec 2025 | Geothermal : 75.5% Solar : 24.5% |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.8 GWh | May 2013 | Dec 2025 | Landfill Gas |
| Goldthwaite Wind Energy Facility | Invenergy Services LLC | Goldthwaite, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 408.6 GWh | Nov 2013 | Dec 2025 | Wind |
| Prairie Breeze | SunEdison LLC | Elgin, NE | Southwest Power Pool (SWPP) | 543.3 GWh | Apr 2014 | Dec 2025 | Wind |
| Shannon Farm | Strata Manager, LLC | Shannon, NC | Duke Energy Progress East (CPLE) | 6.2 GWh | Sep 2012 | Dec 2025 | Solar |
| Vansycle II Wind Energy Center | FPL Energy Stateline II Inc | Athena, OR | PacifiCorp West (PACW) | 320.1 GWh | Nov 2009 | Dec 2025 | Wind |
| Charles D. Lamb Energy Center | Oklahoma Municipal Power Authority | Ponca City, OK | Southwest Power Pool (SWPP) | 118.1 GWh | Mar 2015 | Dec 2025 | Natural Gas |
| Bradley Energy Center | Ameresco Select Inc | Windsor Locks, CT | ISO New England (ISNE) | 11.3 GWh | Oct 2002 | Dec 2025 | Natural Gas |
| UMMS at Pocomoke | Luminace Solar Maryland II, LLC | Pocomoke City, MD | PJM Interconnection, LLC (PJM) | 4.3 GWh | Jan 2013 | Dec 2025 | Solar |
| The Andersons Albion Ethanol LLC | The Andersons Albion Ethanol LLC | Albion, MI | Midcontinent Independent System Operator, Inc. (MISO) | 62.0 GWh | Jul 2006 | Dec 2025 | Natural Gas |
| Fuquay Farm | Strata Manager, LLC | Middle Creek Township, NC | Duke Energy Progress East (CPLE) | 8.1 GWh | Feb 2013 | Dec 2025 | Solar |
| Haynes Farm | Strata Manager, LLC | Lincolnton, NC | Duke Energy Carolinas (DUK) | 7.9 GWh | Aug 2013 | Dec 2025 | Solar |
| Lenoir Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2013 | Dec 2025 | Solar |
| Lenoir Farm 2 | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | May 2013 | Dec 2025 | Solar |
| Marshville Farm | Strata Manager, LLC | Marshville, NC | Duke Energy Carolinas (DUK) | 7.9 GWh | Sep 2013 | Dec 2025 | Solar |
| Mile Farm | Palmetto Power Management LLC | Rougemont, NC | Duke Energy Progress East (CPLE) | 7.2 GWh | May 2014 | Dec 2025 | Solar |
| Moore Solar Farm | Strata Manager, LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Moorings Farm | Strata Manager, LLC | New Hope, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | Aug 2013 | Dec 2025 | Solar |
| New Bern Farm | Strata Manager, LLC | Ernul, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Mar 2014 | Dec 2025 | Solar |
| Roxboro Farm | Strata Manager, LLC | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Mar 2014 | Dec 2025 | Solar |
| White Cross Farm | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Aug 2013 | Dec 2025 | Solar |
| Wilson Farm 1 | Strata Manager, LLC | Elm City, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Jun 2013 | Dec 2025 | Solar |
| Yanceyville Farm | Headwater Energy, LLC | Blanch, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Nov 2013 | Dec 2025 | Solar |
| AM Best Farm | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | May 2013 | Dec 2025 | Solar |
| Mt Olive Farm 2 | Strata Manager, LLC | Mt Olive, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Apr 2013 | Dec 2025 | Solar |
| Dibrell Farm | Strata Manager, LLC | Pelham, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Feb 2013 | Dec 2025 | Solar |
| Rock Farm | Strata Manager, LLC | Rockingham, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Apr 2013 | Dec 2025 | Solar |
| Two Lines Farm | Strata Manager, LLC | Hickory, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Feb 2013 | Dec 2025 | Solar |
| Bolton Farm | Strata Manager, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | Jun 2013 | Dec 2025 | Solar |
| McCallum Farm | Strata Manager, LLC | Rowland, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Aug 2013 | Dec 2025 | Solar |
| Radiance Solar 4 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2025 | Solar |
| Radiance Solar 5 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2013 | Dec 2025 | Solar |
| The Lawrenceville School Solar Facility | CVI CleanCapital Solar 4 LLC | Lawrenceville, NJ | PJM Interconnection, LLC (PJM) | 6.6 GWh | Apr 2012 | Dec 2025 | Solar |
| Amazon | CVI CleanCapital Solar 4 LLC | Carteret, NJ | PJM Interconnection, LLC (PJM) | 4.7 GWh | Nov 2011 | Dec 2025 | Solar |
| North Jersey Media Group Solar Facility | CVI CleanCapital Solar 4 LLC | Rockaway Township, NJ | PJM Interconnection, LLC (PJM) | 3.8 GWh | Feb 2013 | Dec 2025 | Solar |
| Corning Pharmaceutical Glass | CVI CleanCapital Solar 4 LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Aug 2012 | Dec 2025 | Solar |
| Atlantic Coast Freezers Solar Facility | CVI CleanCapital Solar 4 LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Mar 2012 | Dec 2025 | Solar |
| Williams-Sonoma Solar Facility | CVI CleanCapital Solar 4 LLC | Jamesburg, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2011 | Dec 2025 | Solar |
| Quittacas Pond Solar | RWE Clean Energy | Rochester, MA | ISO New England (ISNE) | 5.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Majestic II Wind | NextEra Energy Majestic Wind | Panhandle, TX | Southwest Power Pool (SWPP) | 175.7 GWh | Jul 2012 | Dec 2025 | Wind |
| Tissington Solar | MN8 Energy LLC | Vernon Township, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Aug 2019 | Dec 2025 | Solar |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2013 | Dec 2025 | Solar |
| Blue Summit Wind LLC | Blue Summit Wind LLC | Vernon, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 491.8 GWh | Nov 2012 | Dec 2025 | Wind |
| White River Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 36.1 GWh | Jun 2013 | Dec 2025 | Solar |
| Corcoran Solar | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.1 GWh | Jul 2013 | Dec 2025 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.1 GWh | May 2013 | Dec 2025 | Solar |
| Rochelle Energy Center | Frontier Operation Services | Rochelle, IL | PJM Interconnection, LLC (PJM) | 13.1 GWh | Nov 2011 | Dec 2025 | Landfill Gas |
| Petra Nova Carbon Capture Cogen | Petra Nova Power I LLC | Thompsons, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 200.5 GWh | May 2013 | Dec 2025 | Natural Gas |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.6 GWh | Jun 2013 | Dec 2025 | Landfill Gas |
| Bryan Solar Field | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Threemile Digester | TMF-RIG, LLC | Boardman, OR | PacifiCorp West (PACW) | 35.4 GWh | Nov 2012 | Dec 2025 | Natural Gas |
| Hyder II Hybrid | Arizona Public Service Co | Hyder, AZ | Arizona Public Service Company (AZPS) | 25.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Northbridge Solar | RWE Clean Energy | South Grafton, MA | ISO New England (ISNE) | 3.2 GWh | Jul 2013 | Dec 2025 | Solar |
| CU Solar Plant | CU Solar LLC | Cedarville, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Mar 2013 | Dec 2025 | Solar |
| CES Sterling LLC | SunEdison LLC | Sterling, MA | ISO New England (ISNE) | 2.9 GWh | Jan 2013 | Dec 2025 | Solar |
| IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.5 GWh | Oct 2013 | Dec 2025 | Solar |
| Flint Creek Hydroelectric LLC | Hydrodynamics Inc | Philipsburg, MT | NorthWestern Corporation (NWMT) | 9.0 GWh | Feb 2013 | Dec 2025 | Water |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 361.1 GWh | Dec 2013 | Dec 2025 | Wind |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 250.6 GWh | Dec 2013 | Dec 2025 | Wind |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 10.0 GWh | Apr 2013 | Dec 2025 | Landfill Gas |
| Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 24.1 GWh | Apr 2014 | Dec 2025 | Solar |
| Synergy Biogas | CH4 Biogas LLC | Wyoming, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2011 | Dec 2025 | Other Biomass Gas |
| Solar Star New Jersey NJ LLC | Solar Star New Jersey VI LLC | Skillman, NJ | PJM Interconnection, LLC (PJM) | 1.8 GWh | Jan 2012 | Dec 2025 | Solar |
| Bellingham PV | Terraform Arcadia | Douglas, MA | ISO New England (ISNE) | 4.2 GWh | Sep 2013 | Dec 2025 | Solar |
| Luther College Wind Project | Luther College Wind Energy Project LLC | Decorah, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2011 | Dec 2025 | Wind |
| Marshfield PV | Terraform Arcadia | Marshfield, MA | ISO New England (ISNE) | 4.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Orange PV | Terraform Arcadia | Orange, MA | ISO New England (ISNE) | 2.6 GWh | Jun 2013 | Dec 2025 | Solar |
| Maynard PV | Terraform Arcadia | Maynard, MA | ISO New England (ISNE) | 1.2 GWh | Dec 2013 | Dec 2025 | Solar |
| Bankhead Dam | Alabama Power Co | Northport, AL | Southern Company Services, Inc. - Trans (SOCO) | 150.8 GWh | Jun 1963 | Dec 2025 | Water |
| Walter Bouldin Dam | Alabama Power Co | Wetumpka, AL | Southern Company Services, Inc. - Trans (SOCO) | 398.5 GWh | Jun 1967 | Dec 2025 | Water |
| Copper | El Paso Electric Co | El Paso, TX | El Paso Electric Company (EPE) | 27.8 GWh | Jun 1980 | Dec 2025 | Natural Gas |
| H Neely Henry Dam | Alabama Power Co | Ohatchee, AL | Southern Company Services, Inc. - Trans (SOCO) | 180.9 GWh | May 1966 | Dec 2025 | Water |
| Holt Dam | Alabama Power Co | Tuscaloosa, AL | Southern Company Services, Inc. - Trans (SOCO) | 156.6 GWh | Jul 1968 | Dec 2025 | Water |
| Jordan Dam | Alabama Power Co | Wetumpka, AL | Southern Company Services, Inc. - Trans (SOCO) | 313.8 GWh | Dec 1928 | Dec 2025 | Water |
| Logan Martin Dam | Alabama Power Co | Vincent, AL | Southern Company Services, Inc. - Trans (SOCO) | 299.6 GWh | Jul 1964 | Dec 2025 | Water |
| Lay Dam | Alabama Power Co | Clanton, AL | Southern Company Services, Inc. - Trans (SOCO) | 482.4 GWh | Jan 1967 | Dec 2025 | Water |
| Martin Dam | Alabama Power Co | Dadeville, AL | Southern Company Services, Inc. - Trans (SOCO) | 287.2 GWh | Dec 1926 | Dec 2025 | Water |
| Mitchell Dam | Alabama Power Co | Verbena, AL | Southern Company Services, Inc. - Trans (SOCO) | 391.0 GWh | Oct 1949 | Dec 2025 | Water |
| Lewis Smith Dam | Alabama Power Co | Jasper, AL | Southern Company Services, Inc. - Trans (SOCO) | 274.6 GWh | Aug 1961 | Dec 2025 | Water |
| Thurlow Dam | Alabama Power Co | Tallassee, AL | Southern Company Services, Inc. - Trans (SOCO) | 191.0 GWh | Dec 1930 | Dec 2025 | Water |
| Weiss Dam | Alabama Power Co | Leesburg, AL | Southern Company Services, Inc. - Trans (SOCO) | 187.6 GWh | May 1961 | Dec 2025 | Water |
| Yates Dam | Alabama Power Co | Tallassee, AL | Southern Company Services, Inc. - Trans (SOCO) | 114.2 GWh | Jun 1928 | Dec 2025 | Water |
| Rollins | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 36.9 GWh | Jul 1980 | Dec 2025 | Water |
| Millers Ferry | USCE-Mobile District | Camden, AL | Southern Company Services, Inc. - Trans (SOCO) | 250.2 GWh | Mar 1970 | Dec 2025 | Water |
| Colbert | Tennessee Valley Authority | Tuscumbia, AL | Tennessee Valley Authority (TVA) | 731.9 GWh | Dec 1954 | Dec 2025 | Natural Gas |
| Guntersville | Tennessee Valley Authority | Guntersville, AL | Tennessee Valley Authority (TVA) | 509.1 GWh | Jul 1939 | Dec 2025 | Water |
| Wheeler Dam | Tennessee Valley Authority | Town Creek, AL | Tennessee Valley Authority (TVA) | 1.2 TWh | Oct 1936 | Dec 2025 | Water |
| Gantt | PowerSouth Energy Cooperative | Andalusia, AL | Southern Company Services, Inc. - Trans (SOCO) | 5.7 GWh | Dec 1925 | Dec 2025 | Water |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |