Messalonskee 5
58 West River Road, Waterville, ME 4901Plant Summary Information
Messalonskee 5 is ranked #46 out of 50 hydroelectric power plants in Maine in terms of total annual net electricity generation.
Messalonskee 5 is comprised of 1 generator and generated 706.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Messalonskee 5 |
---|---|
Utility Name | Messalonskee Stream Hydro LLC |
Location | Kennebec County, ME |
Initial Operation Date | January 1935 |
Last Update | Dec 2024 |
Annual Generation | 3.3 GWh |
Annual Consumption | 12.6 k MMBtu |
Ranked #9,085 out of 12,299 Power Plants Nationwide | |
Ranked #1,209 out of 1,323 Water Power Plants Nationwide | |
Ranked #164 out of 202 Maine Power Plants | |
Ranked #46 out of 50 Maine Water Power Plants | |
Fuel Types | Water |
Map of Messalonskee 5
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Messalonskee 5.
Monthly Net Generation for Messalonskee 5
Messalonskee 5 Details
Summary Information | |
---|---|
Plant Name | Messalonskee 5 (1500) |
Plant Address | 58 West River Road, Waterville, ME 4901 |
Utility | Messalonskee Stream Hydro LLC (56854) |
Latitude, Longitude | 44.5344, -69.65223 |
Generation Dates on File | Feb 2001 to Dec 2024 |
Initial Operation Date | January 1935 |
Annual Generation | 3.3 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 04-78-000. |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Messalonskee Stream |
Ash Impoundment | No |
Transmission / Distribution Owner | Central Maine Power Co (3266) ME |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating January 1935
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1935 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Messalonskee 5 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1199 | Clifton Dam 3 Power Station | Converse, SC | 3.6 GWh |
#1200 | Center Falls | Greenwich, NY | 3.6 GWh |
#1201 | King Cove | King Cove, AK | 4.5 GWh |
#1202 | GeoBon II | Shoshone, ID | 3.5 GWh |
#1203 | Constantine | Constantine, MI | 3.5 GWh |
#1204 | Pittsfield Hydro | Burnham, ME | 3.5 GWh |
#1205 | Lochmere Hydroelectric Plant | Tilton, NH | 3.5 GWh |
#1206 | Gantt | Andalusia, AL | 3.4 GWh |
#1207 | Deadwood Creek | Dobbins, CA | 3.4 GWh |
#1208 | Avalon Hydropower | Mayodan, NC | 3.3 GWh |
#1210 | Flambeau Crowley Rapids Project | Park Falls, WI | 3.3 GWh |
#1211 | Hoot Lake | Fergus Falls, MN | 3.3 GWh |
#1212 | Somersworth Lower Great Dam | Somersworth, NH | 3.3 GWh |
#1213 | Boltonville Hydro Associates | Boltonville, VT | 3.3 GWh |
#1214 | Cornell Hydro | Ithaca, NY | 3.2 GWh |
#1215 | Skookumchuck | Tenino, WA | 3.2 GWh |
#1216 | Stairs | Salt Lake City, UT | 3.2 GWh |
#1217 | Tenth Street | Norwich, CT | 3.2 GWh |
#1218 | Pumpkin Hill | Lowell, ME | 3.2 GWh |
#1219 | Newhalen | Iliamna, AK | 3.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Messalonskee 5.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Solar | Fairfiled, ME | 6.7 GWh | 4.8 mi |
Benton Falls Associates | Benton, ME | 4.3 GWh | 5.8 mi |
Cenergy - Richards (CSG) | Fairfield, ME | 1.8 GWh | 7.8 mi |
Cenergy - Waterville (CSG) | Waterville, ME | 9.1 GWh | 0.9 mi |
Church Hill Road Augusta Solar, LLC | Augusta, ME | 6.0 GWh | 11.6 mi |
Dynamic - Norridgewock Martin Stream (CSG) | Norridgewock, ME | 206.0 MWh | 12.9 mi |
Fairfield PV - BD Solar Fairfield LLC | Fairfield, ME | 8.2 GWh | 7.4 mi |
Hydro Kennebec Project | Winslow, ME | 27.0 GWh | 2.6 mi |
Lockwood Hydroelectric Facility | Waterville, ME | 13.6 GWh | 1.4 mi |
Messalonskee 2 (Oakland) | Oakland, ME | 10.8 GWh | 3 mi |
Messalonskee 3 | Oakland, ME | 6.5 GWh | 2.9 mi |
Oakland | Oakland, ME | 9.0 GWh | 3.3 mi |
Route 3 China Solar, LLC | China, ME | 8.1 GWh | 10.5 mi |
Shawmut | Shawmut, ME | 17.0 GWh | 7.4 mi |
Sidney | Sidney, ME | 2.3 GWh | 6.8 mi |
Solar Mule, LLC | Oakland, ME | 2.0 GWh | 1.9 mi |
Somerset Plant | Skowhegan, ME | 535.3 GWh | 11.7 mi |
Three Corners Solar | Unity, ME | 142.0 GWh | 11.2 mi |
Webb Road Solar | Waterville, ME | 5.9 GWh | 2.3 mi |
Winslow PV - BD Solar 2 LLC | Winslow, ME | 12.6 GWh | 3.5 mi |