Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Conrath DPC Solar | SoCore Energy LLC | Conrath, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2017 | Dec 2024 | Solar |
Time Warner Cable - Knowles | Tesla Inc. | Bath, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Apr 2018 | Dec 2024 | Solar |
Northampton Landfill Solar PV | Ameresco Glendale Road Solar PV LLC | Northampton, MA | ISO New England (ISNE) | 3.8 GWh | Oct 2017 | Dec 2024 | Solar |
Hartford Landfill Solar EGF | Materials Innovation Recycling Authority | Hartford, CT | ISO New England (ISNE) | 1.2 GWh | May 2014 | Dec 2024 | Solar |
Green Energy Machine | Green Energy Machine, LLC | Anita, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.7 GWh | May 2016 | Dec 2024 | Wind |
Westmont 300B | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.1 GWh | Nov 2016 | Dec 2024 | Solar |
Correctional Solar LLC | Dominion Renewable Energy | Barhamsville, VA | PJM Interconnection, LLC (PJM) | 29.0 GWh | Nov 2017 | Dec 2024 | Solar |
Sussex Drive, LLC | Dominion Renewable Energy | Stoney Creek, VA | PJM Interconnection, LLC (PJM) | 38.4 GWh | Oct 2017 | Dec 2024 | Solar |
Buckingham Solar LLC | Dominion Renewable Energy | Cumberland, VA | PJM Interconnection, LLC (PJM) | 32.3 GWh | Oct 2017 | Dec 2024 | Solar |
Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
Shakopee Met Council WTP | Oak Leaf Solar V LLC | Shakopee, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2016 | Dec 2024 | Solar |
Viper Solar | Cypress Creek Renewables | Rockfish, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Oct 2017 | Dec 2024 | Solar |
Scarlet Solar | Cypress Creek Renewables | La Grange, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Aug 2017 | Dec 2024 | Solar |
Ruskin Solar | Cypress Creek Renewables | Dudley, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Oct 2017 | Dec 2024 | Solar |
Ozarks Natural Energy Community Solar | Ozarks Electric Coop Corp - (AR) | Springdale, AR | Southwest Power Pool (SWPP) | 935.0 MWh | Mar 2016 | Dec 2024 | Solar |
Red Oak Solar Farm, LLC | Heelstone Energy Holdings, LLC | Nashville, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Nov 2016 | Dec 2024 | Solar |
Dublin Solar I | AES Distributed Energy | Dublin, GA | Southern Company Services, Inc. - Trans (SOCO) | 4.2 GWh | Mar 2015 | Dec 2024 | Solar |
CCC Hastings Wind Turbine | CCC Hastings Renewable Energy, LLC | Hastings, NE | Southwest Power Pool (SWPP) | 6.6 GWh | Nov 2016 | Dec 2024 | Wind |
Creston Ridge Wind Farm | Creston Ridge, LLC | Creston, NE | Southwest Power Pool (SWPP) | 24.3 GWh | Nov 2015 | Dec 2024 | Wind |
Hopewell Cogeneration NJ | Hopewell Campus Owners LLC | Pennington, NJ | PJM Interconnection, LLC (PJM) | 317.0 MWh | Jul 2015 | Dec 2024 | Natural Gas |
GRE Marshan Solar | SoCore Energy LLC | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Oct 2017 | Dec 2024 | Solar |
Antlia Community Solar | Antlia Community Solar | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Aug 2017 | Dec 2024 | Solar |
Aries Community Solar | Aries Community Solar | Claremont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Sep 2017 | Dec 2024 | Solar |
Centaurus Community Solar | Centaurus Community Solar | Maynard, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Aug 2017 | Dec 2024 | Solar |
Gemini Community Solar | Gemini Community Solar | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Aug 2017 | Dec 2024 | Solar |
Mapleton Community Solar | Mapleton Community Solar | Mapleton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | May 2017 | Dec 2024 | Solar |
Morgan Community Solar | Morgan Community Solar | Morgan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Mar 2017 | Dec 2024 | Solar |
Spica Community Solar | Spica Community Solar | Lake Lillian, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Jul 2017 | Dec 2024 | Solar |
Vega Community Solar | Vega Community Solar | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Sep 2017 | Dec 2024 | Solar |
Spartan PV 1, LLC | NJR Clean Energy Ventures Corporation | East Lansing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 12.0 GWh | Nov 2017 | Dec 2024 | Solar |
Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 48.3 GWh | Jun 2017 | Dec 2024 | Solar |
Washington Solar | SolRiver Capital LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 11.4 GWh | Feb 2024 | Dec 2024 | Solar |
West Dubuque Solar | Interstate Power and Light Co | Dubuque, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Aug 2017 | Dec 2024 | Solar |
Owens Valley Solar Project 11 | Los Angeles Department of Water & Power | Olancha, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2016 | Dec 2024 | Solar |
VEC Magee Hill Solar | SoCore Energy LLC | Hinesburgh, VT | ISO New England (ISNE) | 1.7 GWh | Oct 2017 | Dec 2024 | Solar |
Strawberry Point DPC Solar | SoCore Energy LLC | Strawberry Point, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2017 | Dec 2024 | Solar |
Westar Cities Solar | SoCore Energy LLC | Hutchinson, KS | Southwest Power Pool (SWPP) | 2.2 GWh | Jun 2017 | Dec 2024 | Solar |
Sand Lake DPC Solar | SoCore Energy LLC | Centuria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2017 | Dec 2024 | Solar |
Nesvold Watertown Solar | SoCore Energy LLC | Watertown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Dec 2017 | Dec 2024 | Solar |
Red Maple Solar | Terraform Arcadia | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | May 2018 | Dec 2024 | Solar |
Apache Solar I | Arizona Electric Pwr Coop Inc | Cochise, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 55.5 GWh | Sep 2017 | Dec 2024 | Solar |
Cotten Farm, LLC | Heelstone Energy Holdings, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2016 | Dec 2024 | Solar |
Lind Solar CSG | Terraform Arcadia | Young America, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Jan 2017 | Dec 2024 | Solar |
Onyx - Lamphear Road CSG | Onyx Asset Services Group | Rome, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Sep 2016 | Dec 2024 | Solar |
Scott-II Solar LLC | Dominion Renewable Energy | Powhatan, VA | PJM Interconnection, LLC (PJM) | 40.5 GWh | Nov 2017 | Dec 2024 | Solar |
Michael Solar | SoCore Energy LLC | Freeport, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.1 GWh | Nov 2017 | Dec 2024 | Solar |
Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 44.4 GWh | Feb 2017 | Dec 2024 | Solar |
OSLH, LLC | OSLH, LLC | Bend, OR | PacifiCorp West (PACW) | 22.2 GWh | Nov 2016 | Dec 2024 | Solar |
CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2024 | Solar |
CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2016 | Dec 2024 | Solar |
ZV Solar 1 | Cypress Creek Renewables | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | May 2016 | Dec 2024 | Solar |
NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
Atkinson Farm Solar | Strata Manager, LLC | Beulaville, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2017 | Dec 2024 | Solar |
Elizabethtown Solar | AES Distributed Energy | Elizabethtown, PA | PJM Interconnection, LLC (PJM) | 2.5 GWh | Jan 2016 | Dec 2024 | Solar |
AIS Solar Project | Terraform Arcadia | Leominster, MA | ISO New England (ISNE) | 3.5 GWh | Nov 2016 | Dec 2024 | Solar |
Florence Solar W3-080, LLC | Altus Power America Management, LLC | Florence, NJ | PJM Interconnection, LLC (PJM) | 8.9 GWh | Nov 2016 | Dec 2024 | Solar |
Northern Cardinal Solar | Terraform Arcadia | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 3.0 GWh | May 2018 | Dec 2024 | Solar |
Darlington Solar, LLC | Darlington Solar, LLC | Darlington, SC | Duke Energy Progress East (CPLE) | 19.3 GWh | Nov 2016 | Dec 2024 | Solar |
French's Landfill PV | Altus Power America Management, LLC | Brick, NJ | PJM Interconnection, LLC (PJM) | 5.3 GWh | Sep 2014 | Dec 2024 | Solar |
Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2017 | Dec 2024 | Solar |
Iron Horse Battery Storage Hybrid | Big Sky Wind, LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 3.7 GWh | Mar 2017 | Dec 2024 | Solar |
Everett PV1 | Ecoplexus, Inc | Parmele, NC | PJM Interconnection, LLC (PJM) | 23.7 GWh | Nov 2019 | Dec 2024 | Solar |
Underwood PV2 | Ecoplexus, Inc | Murfreesboro, NC | PJM Interconnection, LLC (PJM) | 30.0 GWh | Sep 2020 | Dec 2024 | Solar |
WED Portsmouth One, LLC | Greenbacker Renewable Energy Corporation | Portsmouth, RI | ISO New England (ISNE) | 4.3 GWh | Jul 2016 | Dec 2024 | Wind |
Musgrave East Solar Farm | Artemis Solar LLC | Aurora, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2016 | Dec 2024 | Solar |
Whirlpool Corporation - Ottawa Wind Farm | OEE XXIV LLC | Ottawa, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Dec 2017 | Dec 2024 | Wind |
Whirlpool Corporation - Marion Wind Farm | OEE XXIII LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 5.7 GWh | Sep 2017 | Dec 2024 | Wind |
SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 13.4 GWh | Sep 2017 | Dec 2024 | Solar |
Redbrook Community Solar 1 | Redbrook Solar 1, LLC | Plympton, MA | ISO New England (ISNE) | 3.6 GWh | Sep 2017 | Dec 2024 | Solar |
Brook Street Solar 1 CSG | Brook Street Solar 1, LLC | Plympton, MA | ISO New England (ISNE) | 3.4 GWh | Jul 2017 | Dec 2024 | Solar |
Spring Street Solar 1 CSG | Spring Street Solar 1, LLC | Carver, MA | ISO New England (ISNE) | 3.2 GWh | Feb 2017 | Dec 2024 | Solar |
Bullock Road Solar 1 | Bullock Road Solar 1, LLC | Freetown, MA | ISO New England (ISNE) | 3.5 GWh | Jun 2018 | Dec 2024 | Solar |
Mill Seat Renewable Energy Facility | WM Renewable Energy LLC | Bergen, NY | New York Independent System Operator (NYIS) | 50.8 GWh | Jun 2007 | Dec 2024 | Landfill Gas |
Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 21.3 GWh | Nov 2017 | Dec 2024 | Solar |
Musgrave West Solar Farm | Artemis Solar LLC | Aurora, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2016 | Dec 2024 | Solar |
Stafford St Solar 1 CSG | Stafford St Solar 1, LLC | Leicester, MA | ISO New England (ISNE) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
Stafford St Solar 3 CSG | Stafford St Solar 3, LLC | Leicester, MA | ISO New England (ISNE) | 1.7 GWh | Nov 2017 | Dec 2024 | Solar |
Siler 421 Farm, LLC | Heelstone Energy Holdings, LLC | Siler City, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2016 | Dec 2024 | Solar |
Hollyfield | Virginia Electric & Power Co | Manquin, VA | PJM Interconnection, LLC (PJM) | 24.9 GWh | Aug 2018 | Dec 2024 | Solar |
Montefiore - Westchester Square | Montefiore-Westchester Square | Bronx, NY | New York Independent System Operator (NYIS) | 9.0 MWh | Jun 1983 | Dec 2024 | Distillate Fuel Oil |
New York Presbyterian Hospital-168th St | New York Presbyterian Hospital- 168th Street | New York, NY | New York Independent System Operator (NYIS) | 60.0 MWh | Dec 1999 | Dec 2024 | Distillate Fuel Oil |
Harford Solar Farm | Laertes Solar LLC | Harford, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2016 | Dec 2024 | Solar |
Floyd Road Solar Farm | Greenbacker Renewable Energy Corporation | Gaston, NC | PJM Interconnection, LLC (PJM) | 9.2 GWh | May 2017 | Dec 2024 | Solar |
Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.9 GWh | Nov 2017 | Dec 2024 | Solar |
DG AMP Solar Front Royal | DG AMP Solar, LLC | Front Royal, VA | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2017 | Dec 2024 | Solar |
Seward Wind Farm | Seward Wind LLC | Seward, NE | Southwest Power Pool (SWPP) | 7.3 GWh | Nov 2017 | Dec 2024 | Wind |
Kramer Solar CSG | National Grid Renewables | Hector, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Nov 2017 | Dec 2024 | Solar |
Novel OYA of Osakis CSG | NRG MN Community LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Jun 2018 | Dec 2024 | Solar |
Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2017 | Dec 2024 | Wind |
Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
BWC Wading River One, Two, Three CSG | Ameresco BWC Wading River LLC | Mendon, MA | ISO New England (ISNE) | 5.0 GWh | Oct 2017 | Dec 2024 | Solar |
Lemond Solar | Adapture Renewables, Inc. | Owatonna, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | May 2017 | Dec 2024 | Solar |
Pemberton Road I | NJR Clean Energy Ventures Corporation | Pemberton, NJ | PJM Interconnection, LLC (PJM) | 13.1 GWh | May 2017 | Dec 2024 | Solar |
Pemberton Road II | NJR Clean Energy Ventures Corporation | Pemberton, NJ | PJM Interconnection, LLC (PJM) | 13.0 GWh | May 2017 | Dec 2024 | Solar |
Sub 12 | City of Tallahassee - (FL) | Tallahassee, FL | City of Tallahassee (TAL) | 28.6 GWh | Sep 2018 | Dec 2024 | Natural Gas |
Stone Solar | Strata Manager, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Jul 2016 | Dec 2024 | Solar |
Tripple State Farm | Strata Manager, LLC | Statesville, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | Sep 2016 | Dec 2024 | Solar |
Wadesboro Farm 1 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Feb 2015 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on April 2025 generation numbers.State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,243.20 GWh |
Alaska | # 48 | 142 | 476.79 GWh |
Arizona | # 15 | 173 | 7,447.02 GWh |
Arkansas | # 31 | 99 | 3,937.58 GWh |
California | # 4 | 1,664 | 15,684.45 GWh |
Colorado | # 28 | 290 | 4,479.29 GWh |
Connecticut | # 37 | 162 | 2,832.47 GWh |
Delaware | # 49 | 32 | 450.59 GWh |
District of Columbia | # 51 | 16 | 13.07 GWh |
Florida | # 2 | 317 | 20,430.69 GWh |
Georgia | # 6 | 248 | 11,378.75 GWh |
Hawaii | # 46 | 68 | 750.53 GWh |
Idaho | # 44 | 145 | 1,489.98 GWh |
Illinois | # 5 | 358 | 14,828.23 GWh |
Indiana | # 14 | 208 | 7,809.31 GWh |
Iowa | # 19 | 294 | 6,020.16 GWh |
Kansas | # 21 | 180 | 5,162.37 GWh |
Kentucky | # 25 | 57 | 4,785.23 GWh |
Louisiana | # 16 | 83 | 7,414.75 GWh |
Maine | # 45 | 208 | 1,052.11 GWh |
Maryland | # 36 | 196 | 3,016.71 GWh |
Massachusetts | # 43 | 623 | 1,491.61 GWh |
Michigan | # 9 | 269 | 9,486.98 GWh |
Minnesota | # 27 | 765 | 4,502.46 GWh |
Mississippi | # 20 | 56 | 5,727.48 GWh |
Missouri | # 23 | 120 | 5,119.33 GWh |
State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,029.46 GWh |
Nebraska | # 38 | 127 | 2,575.70 GWh |
Nevada | # 33 | 110 | 3,434.99 GWh |
New Hampshire | # 42 | 56 | 1,516.23 GWh |
New Jersey | # 22 | 385 | 5,160.42 GWh |
New Mexico | # 32 | 139 | 3,447.34 GWh |
New York | # 8 | 930 | 9,830.59 GWh |
North Carolina | # 10 | 909 | 9,044.94 GWh |
North Dakota | # 35 | 57 | 3,134.93 GWh |
Ohio | # 12 | 197 | 8,321.20 GWh |
Oklahoma | # 18 | 136 | 6,341.82 GWh |
Oregon | # 24 | 272 | 4,888.92 GWh |
Pennsylvania | # 3 | 255 | 17,282.62 GWh |
Rhode Island | # 47 | 97 | 690.36 GWh |
South Carolina | # 11 | 200 | 8,436.34 GWh |
South Dakota | # 41 | 52 | 1,909.63 GWh |
Tennessee | # 26 | 86 | 4,565.37 GWh |
Texas | # 1 | 885 | 43,683.73 GWh |
Utah | # 39 | 122 | 2,192.68 GWh |
Vermont | # 50 | 117 | 200.11 GWh |
Virginia | # 17 | 233 | 6,991.48 GWh |
Washington | # 13 | 134 | 8,268.23 GWh |
West Virginia | # 30 | 39 | 3,969.31 GWh |
Wisconsin | # 29 | 244 | 4,163.43 GWh |
Wyoming | # 34 | 73 | 3,236.34 GWh |