Milford Hydro Station
Davenport Street, Milford, ME 4461Plant Summary Information
Milford Hydro Station is ranked #50 out of 202 power plants in Maine in terms of total annual net electricity generation.
Milford Hydro Station is comprised of 6 generators and generated 6.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Milford Hydro Station |
---|---|
Utility Name | Brookfield Black Bear Hydro, LLC |
Location | Penobscot County, ME |
Initial Operation Date | July 1941 |
Last Update | Dec 2024 |
Annual Generation | 37.2 GWh |
Annual Consumption | 136.7 k MMBtu |
Ranked #4,361 out of 12,288 Power Plants Nationwide | |
Ranked #562 out of 1,323 Water Power Plants Nationwide | |
Ranked #50 out of 202 Maine Power Plants | |
Ranked #18 out of 50 Maine Water Power Plants | |
Fuel Types | Water |
Map of Milford Hydro Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milford Hydro Station.
Monthly Net Generation for Milford Hydro Station
Milford Hydro Station Details
Summary Information | |
---|---|
Plant Name | Milford Hydro Station (1475) |
Plant Address | Davenport Street, Milford, ME 4461 |
Utility | Brookfield Black Bear Hydro, LLC (59178) |
Latitude, Longitude | 44.94206, -68.64504 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | July 1941 |
Annual Generation | 37.2 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-776-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Penobscot River |
Ash Impoundment | No |
Transmission / Distribution Owner | Versant Power (1179) ME |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator MF05 Details Operating July 1941
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1941 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Generator MF06 Details Operating July 1942
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1942 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Generator MF04 Details Operating July 1946
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1946 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Generator MF03 Details Operating July 1956
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1956 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Generator MF01 Details Operating November 2011
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Generator MF02 Details Operating November 2011
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Milford Hydro Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#552 | Rollins | Colfax, CA | 38.6 GWh |
#553 | Riverside Holyoke | Holyoke, MA | 38.4 GWh |
#554 | Soft Maple | Croghan, NY | 38.4 GWh |
#555 | Cooper Lake | Cooper Landing, AK | 38.1 GWh |
#556 | Moshier | Lowville, NY | 38.1 GWh |
#557 | Green Springs | Columbia Falls, OR | 37.7 GWh |
#558 | Essex Junction 19 | Essex Junction, VT | 37.6 GWh |
#559 | Cascade Dam | Cascade, ID | 37.4 GWh |
#560 | Green Island Hydroelectric Station | Green Island, NY | 37.4 GWh |
#561 | Tims Ford | Winchester, TN | 37.3 GWh |
#563 | Higley | Colton, NY | 37.2 GWh |
#564 | Robbs Peak | Fresh Pond, CA | 37.0 GWh |
#565 | Peavy Falls | Crystal Falls, MI | 36.9 GWh |
#566 | Yough Hydro Power | Confluence, PA | 36.9 GWh |
#567 | Tennessee Creek | Tuckasegee, NC | 36.8 GWh |
#568 | 99 Islands | Blacksburg, SC | 36.5 GWh |
#569 | Monticello Dam | Winters, CA | 36.4 GWh |
#570 | Lake Blackshear Project | Warwick, GA | 36.3 GWh |
#571 | Aziscohos Hydroelectric Project | Wilson Mills, ME | 36.3 GWh |
#572 | Big Falls | Glen Fora, WI | 36.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milford Hydro Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brewer (CSG) | Brewer, ME | 1.9 GWh | 10.5 mi |
BRNG Nicolin (CSG) | Ellsworth, ME | 205.0 MWh | 23.2 mi |
Broadway Solar (CSG) | Bangor, ME | 5.1 GWh | 10.3 mi |
Bucksport Generation LLC | Bucksport, ME | 14.1 GWh | 26.6 mi |
Bull Hill Wind Project | Eastbrook, ME | 74.0 GWh | 24.9 mi |
Corkwood Solar (CSG) | Howland, ME | 5.4 GWh | 21.9 mi |
Dynamic Corinth (CSG) | Corinth, ME | 9.3 GWh | 19.3 mi |
Eastern Maine Medical Center | Bangor, ME | 31.4 GWh | 10.6 mi |
Indeck West Enfield Energy Center | West Enfield, ME | 50.6 GWh | 21.5 mi |
Maine Independence Station | Veazie, ME | 2.5 TWh | 8.7 mi |
Mariaville Road Elsworth Solar, LLC | Ellsworth, ME | 2.5 GWh | 26.5 mi |
Orono B | Orono, ME | 21.3 GWh | 4.1 mi |
Orono Hydro Station | Orono, ME | 5.8 GWh | 4.4 mi |
Passadumkeag Windpark LLC | Greenbush, ME | 131.6 GWh | 23 mi |
Pisgah Mountain Wind | Clifton, ME | 25.3 GWh | 12.8 mi |
Pumpkin Hill | Lowell, ME | 3.2 GWh | 19.1 mi |
Silver Maple | Clifton, ME | 58.7 GWh | 12.6 mi |
Stillwater B | Old Town, ME | 10.5 GWh | 2.8 mi |
Stillwater Hydro Station | Stillwater, ME | 7.0 GWh | 2.9 mi |
West Enfield Hydro | West Enfield, ME | 77.5 GWh | 21.3 mi |