Wolf Creek
980 Power Plant Road, Jamestown, KY 42629Plant Summary Information
Wolf Creek is ranked #13 out of 56 power plants in Kentucky in terms of total annual net electricity generation.
Wolf Creek is comprised of 6 generators and generated 106.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Wolf Creek |
---|---|
Utility Name | USCE-Nashville District |
Location | Russell County, KY |
Initial Operation Date | October 1951 |
Last Update | Dec 2024 |
Annual Generation | 723.8 GWh |
Annual Consumption | 2.6 M MMBtu |
Ranked #968 out of 12,288 Power Plants Nationwide | |
Ranked #57 out of 1,323 Water Power Plants Nationwide | |
Ranked #13 out of 56 Kentucky Power Plants | |
Ranked #2 out of 11 Kentucky Water Power Plants | |
Fuel Types | Water |
Map of Wolf Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wolf Creek.
Monthly Net Generation for Wolf Creek
Wolf Creek Details
Summary Information | |
---|---|
Plant Name | Wolf Creek (1380) |
Plant Address | 980 Power Plant Road, Jamestown, KY 42629 |
Utility | USCE-Nashville District (19462) |
Latitude, Longitude | 36.8691, -85.147 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | October 1951 |
Annual Generation | 723.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Cumberland River |
Ash Impoundment | No |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) KY |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 5 Details Operating October 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 52 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating October 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 52 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating December 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 52 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating March 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1952 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating July 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 52 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1952 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 1 Details Operating August 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 52 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1952 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Wolf Creek Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#47 | Cabinet Gorge | Clark Fork, ID | 857.6 GWh |
#48 | Big Bend Dam | Chamberlain, SD | 813.0 GWh |
#49 | Mossyrock | Silver Creek, WA | 798.5 GWh |
#50 | Yellowtail | Hardin, MT | 798.4 GWh |
#51 | Round Butte | Madras, OR | 794.4 GWh |
#52 | Fort Peck | Fort Peck, MT | 751.6 GWh |
#53 | Devil Canyon | San Bernardino, CA | 750.0 GWh |
#54 | Palisades Dam | Palisades, ID | 744.4 GWh |
#55 | Fort Loudoun | Lenoir City, TN | 732.1 GWh |
#56 | Hungry Horse | Columbia Falls, MT | 730.3 GWh |
#58 | Gavins Point | Crofton, NE | 712.6 GWh |
#59 | Gorge | Rockport, WA | 706.9 GWh |
#60 | Chickamauga | Chattanooga, TN | 688.9 GWh |
#61 | J Strom Thurmond | Clarks Hill, SC | 650.7 GWh |
#62 | Bull Shoals | Mountain Home, AR | 647.3 GWh |
#63 | Rock Creek | Storrie, CA | 609.1 GWh |
#64 | Barkley | Kuttawa, KY | 590.6 GWh |
#65 | Big Creek 3 | Auberry, CA | 586.5 GWh |
#66 | Folsom | Folsom, CA | 580.4 GWh |
#67 | Mayfield | Silver Creek, WA | 576.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wolf Creek.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Mountain Energy Center | Oliver Springs, TN | 15.8 GWh | 67.9 mi |
Center Hill | Lancaster, TN | 291.6 GWh | 65.4 mi |
Chestnut Ridge Gas Recovery | Heiskell, TN | 31.1 GWh | 80.8 mi |
Cooper | Somerset, KY | 469.6 GWh | 31.9 mi |
Cordell Hull | Carthage, TN | 344.8 GWh | 59.7 mi |
Cox Waste to Energy | Campbellsville, KY | 9.7 GWh | 33.4 mi |
Dale Hollow | Celina, TN | 105.9 GWh | 28.4 mi |
Dix Dam | Harrodsburg, KY | 54.2 GWh | 67.9 mi |
E W Brown | Harrodsburg, KY | 1.6 TWh | 67.8 mi |
Gallatin (TN) | Gallatin, TN | 4.0 TWh | 79.4 mi |
Glasgow LFGTE | Glasgow, KY | 4.7 GWh | 45.5 mi |
Glover Creek Solar, LLC | Summer Shade, KY | 83.3 GWh | 31.3 mi |
Great Falls (TN) | Rock Island, TN | 275.6 GWh | 78.2 mi |
Hardin County LFGTE | Elizabethtown, KY | 10.3 GWh | 67.2 mi |
Kingston | Kingston, TN | 3.5 TWh | 75.6 mi |
Laurel Dam | London, KY | 53.2 GWh | 48.9 mi |
Mother Ann Lee | Harrodsburg, KY | 6.3 GWh | 70.3 mi |
Norris Dam | Norris, TN | 386.9 GWh | 73.6 mi |
SR Franklin, LLC | Franklin, KY | 4.9 GWh | 78.2 mi |
SR Turkey Creek, LLC | Lancaster, KY | 109.3 GWh | 59.3 mi |