Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| JBER Landfill Gas Power Plant | Doyon Utilities, LLC | Anchorage, AK | 42.8 GWh | Jul 2012 | May 2026 | Landfill Gas : 94.7% Natural Gas : 5.3% | |
| Jewish Community Center PV | AES Distributed Energy | Scottsdale, AZ | Arizona Public Service Company (AZPS) | 2.0 GWh | Aug 2012 | Dec 2025 | Solar |
| Juniper Canyon I Wind Project | Avangrid Power LLC | Bickleton, WA | Avangrid Renewables, LLC (AVRN) | 114.2 GWh | Feb 2011 | May 2026 | Wind |
| Jaybird | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 454.3 GWh | Mar 1961 | May 2026 | Water |
| Judge F Carr | U S Bureau of Reclamation | French Gulch, CA | Balancing Authority of Northern California (BANC) | 383.9 GWh | Apr 1963 | May 2026 | Water |
| Jones Fork | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 14.9 GWh | May 1985 | Dec 2025 | Water |
| John Day | USACE Northwestern Division | Rufus, OR | Bonneville Power Administration (BPAT) | 8.1 TWh | Jul 1968 | May 2026 | Water |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2020 | Dec 2025 | Solar |
| Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 22.5 GWh | Oct 2022 | Dec 2025 | Solar |
| J S Eastwood | Southern California Edison Co | Shaver Lake, CA | California Independent System Operator (CISO) | 130.6 GWh | Nov 1987 | May 2026 | Water |
| JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2019 | Dec 2025 | Natural Gas |
| James B Black | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 530.6 GWh | Nov 1965 | May 2026 | Water |
| Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 46.3 GWh | Jun 2017 | Dec 2025 | Solar |
| Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2024 | Natural Gas |
| Jasper | Dominion Energy South Carolina, Inc | Hardeeville, SC | Dominion Energy South Carolina, Inc. (SCEG) | 4.2 TWh | Apr 2004 | May 2026 | Natural Gas : 99.9% |
| James E. Rogers Energy Complex | Duke Energy Carolinas, LLC | Cliffside, NC | Duke Energy Carolinas (DUK) | 5.6 TWh | May 1972 | May 2026 | Bituminous Coal : 55.2% Natural Gas : 44.7% |
| Jacob Solar | Cypress Creek Renewables | Reidsville, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Dec 2015 | Dec 2025 | Solar |
| Jersey Holdings | Heelstone Energy Holdings, LLC | Lumberton, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Jester Solar | Sol Systems | Goldsboro, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Nov 2020 | Dec 2025 | Solar |
| JED Solid Waste Mgmt Renewable Energy | LMS Energy USA LLC | St. Cloud, FL | Duke Energy Florida, Inc. (FPC) | 37.1 GWh | Feb 2017 | Dec 2025 | Landfill Gas |
| John Hopkins Middle School Microgrid | Duke Energy Florida, LLC | St Petersburg, FL | Duke Energy Florida, Inc. (FPC) | 1.3 GWh | Aug 2023 | Dec 2025 | Solar : 99.7% |
| Jumper Creek Solar Plant | Duke Energy Florida, LLC | Lake Panasoffkee, FL | Duke Energy Florida, Inc. (FPC) | 28.0 GWh | - | May 2026 | Solar |
| Jefferson Solar (SC) | Jefferson Solar | Hartsville, SC | Duke Energy Progress East (CPLE) | 12.7 GWh | Oct 2022 | Dec 2025 | Solar |
| Jessamine Solar | Altus Power America Management, LLC | Marion, SC | Duke Energy Progress East (CPLE) | 3.7 GWh | Mar 2019 | Dec 2025 | Solar |
| Jackson Solar Farm | Headwater Energy, LLC | Wilson, NC | Duke Energy Progress East (CPLE) | 13.1 GWh | Feb 2017 | Dec 2025 | Solar |
| Javelina Wind Energy, LLC | Javelina Wind Energy, LLC | Mirando City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 736.1 GWh | Nov 2015 | May 2026 | Wind |
| Javelina Wind Energy II, LLC | Javelina Wind Energy II, LLC | MIRANDO, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 761.6 GWh | Oct 2016 | Dec 2025 | Wind |
| Johnson County | Johnson County Power LLC | Cleburne, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.3 TWh | Aug 1996 | Dec 2025 | Natural Gas : 99.9% |
| Jumbo Hill Wind Project | Engie North America | Andrews, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 579.1 GWh | Feb 2020 | May 2026 | Wind |
| Juno Solar Project | SE Juno, LLC | Lamesa, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 751.0 GWh | May 2021 | May 2026 | Solar |
| J K Spruce | City of San Antonio - (TX) | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 6.2 TWh | Nov 1992 | May 2026 | Subbituminous Coal : 99.1% Natural Gas : 0.9% |
| Jack County | Jack County Power, LLC | Bridgeport, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 4.5 TWh | Jan 2006 | May 2026 | Natural Gas |
| J Woodruff | USCE-Mobile District | Chattahoochee, FL | Florida Power & Light Co. (FPL) | 228.5 GWh | Jan 2001 | Dec 2025 | Water |
| John R Kelly | Gainesville Regional Utilities | Gainesville, FL | Gainesville Regional Utilities (GVL) | 680.1 GWh | Mar 1965 | Dec 2025 | Natural Gas |
| Jackpot Solar, LLC | Duke Energy Renewables Services | Twin Falls, ID | Idaho Power Company (IPCO) | 288.3 GWh | Nov 2022 | May 2026 | Solar |
| Jett Creek Windfarm (Burnt River) | Jett Creek | Huntington, OR | Idaho Power Company (IPCO) | 24.8 GWh | Feb 2017 | Dec 2025 | Wind |
| John L. Featherstone Plant | Hudson Ranch Power I LLC | Calipatria, CA | Imperial Irrigation District (IID) | 428.7 GWh | Feb 2012 | May 2026 | Geothermal |
| Joe Jenny | AMP MA Joe Jenny | Oxford, MA | ISO New England (ISNE) | 2.4 GWh | Apr 2018 | Dec 2024 | Solar |
| Jackman | Central Rivers Power NH, LLC | Hillsborough, NH | ISO New England (ISNE) | 8.4 GWh | Jan 1926 | Aug 2025 | Water |
| Jefferson Solar (CT) | Ecos Energy LLC | Lebanon, CT | ISO New England (ISNE) | 1.6 GWh | Dec 2017 | Dec 2025 | Solar |
| Jericho Gravel Solar Farm | SoCore Energy LLC | Jerico, VT | ISO New England (ISNE) | 2.3 GWh | Dec 2020 | Dec 2025 | Solar |
| Jericho Landfill Solar Farm | SoCore Energy LLC | Jerico, VT | ISO New England (ISNE) | 1.5 GWh | Dec 2020 | Dec 2025 | Solar |
| Jericho Power | Jericho Power LLC | Berlin, NH | ISO New England (ISNE) | 22.5 GWh | Dec 2015 | May 2026 | Wind |
| Jewett City 1 | Connecticut Mun Elec Engy Coop | Jewett City, CT | ISO New England (ISNE) | 139.0 MWh | Jan 2010 | Dec 2025 | Distillate Fuel Oil |
| JH Solar, LLC CSG | 38 Degrees North, LLC | North Brookfield, MA | ISO New England (ISNE) | 1.5 GWh | Oct 2017 | Dec 2025 | Solar |
| Jiminy Peak Wind QF | Jiminy Peak Mountain Resort, LLC | Hancock, MA | ISO New England (ISNE) | 2.0 MWh | Jul 2007 | Apr 2025 | Wind |
| Johnston LFG Turbine Plant | Rhode Island LFG Genco | Johnston, RI | ISO New England (ISNE) | 173.1 GWh | Apr 2013 | May 2026 | Landfill Gas |
| Johnston Solar | Concord New Energy | Town of Johnston, RI | ISO New England (ISNE) | 1.8 GWh | Jun 2015 | Dec 2025 | Solar |
| J C McNeil | City of Burlington Electric - (VT) | Burlington, VT | ISO New England (ISNE) | 224.4 GWh | May 1984 | Apr 2026 | Wood/Wood Waste Solids : 99.8% |
| Jackson Solar (CT) | Ecos Energy LLC | Griswold, CT | ISO New England (ISNE) | 1.6 GWh | Nov 2019 | Dec 2025 | Solar |
| J D Kennedy | JEA | Jacksonville, FL | JEA (JEA) | 311.0 GWh | May 2000 | Dec 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Jax LNG | Jax LNG | Jacksonville, FL | JEA (JEA) | 36.6 GWh | Sep 2018 | Dec 2025 | Natural Gas |
| Jacksonville Solar | Jacksonville Solar LLC | Jacksonville, FL | JEA (JEA) | 8.8 GWh | Mar 2010 | Dec 2025 | Solar |
| James R Smith | City of Marquette - (MI) | Marquette, MI | Midcontinent Independent System Operator, Inc. (MISO) | 14.3 GWh | Dec 1918 | Dec 2025 | Water |
| Jack Fusco Energy Center | Brazos Valley Energy | Thompsons, TX | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 TWh | Apr 2003 | May 2026 | Natural Gas |
| Jackson (MO) | City of Jackson - (MO) | Jackson, MO | Midcontinent Independent System Operator, Inc. (MISO) | 202.0 MWh | Dec 1935 | Dec 2025 | Distillate Fuel Oil : 67.1% Natural Gas : 32.9% |
| Jim Falls | Northern States Power Co - Minnesota | Jim Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 105.3 GWh | Jun 1988 | Dec 2025 | Water |
| Jessica Mills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Janesville Community Solar | Wisconsin Power & Light Co | Janesville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Mar 2025 | Dec 2025 | Solar |
| JM Huber at Quincy | Luminace Solar Illinois 2, LLC | Quincy, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Jack River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| John A Logan College Solar | REA Investments, LLC | Carterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Jack Francis Solar, LLC | Jack Francis Solar, LLC | Clio, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2020 | Dec 2025 | Solar |
| John Deere Dubuque Works | John Deere Dubuque Works | Dubuque, IA | Midcontinent Independent System Operator, Inc. (MISO) | 45.0 MWh | May 1994 | May 2026 | Distillate Fuel Oil |
| John H Warden | L'Anse Warden Electric Company LLC | L'Anse, MI | Midcontinent Independent System Operator, Inc. (MISO) | 110.6 GWh | Jul 1959 | Dec 2024 | Wood/Wood Waste Solids : 87.2% Tire-derived Fuels : 12.6% |
| John P Madgett | Dairyland Power Coop | Alma, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Oct 1979 | May 2026 | Subbituminous Coal : 99.5% |
| Johnson 1 Community Solar | Johnson I CSG LLC | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Johnson Co. Solar RES | Hoosier Energy R E C, Inc | Trafalgar, IN | Midcontinent Independent System Operator, Inc. (MISO) | 674.0 MWh | Sep 2016 | Dec 2025 | Solar |
| Johnson County Hills Solar | MidAmerican Energy Co | Iowa City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Dec 2021 | Dec 2025 | Solar |
| Johnson CSG 1 | Madison Energy Holdings LLC | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Johnson CSG 2 | Madison Energy Holdings LLC | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Feb 2023 | Dec 2025 | Solar |
| Johnson Falls | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.7 GWh | Jun 1923 | Dec 2025 | Water |
| Johnson II Community Solar | Johnson II CSG LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Aug 2018 | Dec 2025 | Solar |
| Johnson Solar CSG | Geronimo Power | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Dec 2017 | Dec 2025 | Solar |
| Jackson Solar WI, LLC | Wisconsin Electric Power Co | Cedarburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 11.8 GWh | Nov 2023 | Dec 2025 | Solar |
| Jones Dairy | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jun 2021 | Dec 2025 | Solar |
| Jonesboro City Water & Light Plant | City Water and Light Plant - (AR) | Jonesboro, AR | Midcontinent Independent System Operator, Inc. (MISO) | 56.6 GWh | Jun 1999 | Dec 2025 | Natural Gas : 99.9% |
| Jonesboro CWL Solar Park | City Water and Light Plant - (AR) | Jonesboro, AR | Midcontinent Independent System Operator, Inc. (MISO) | 20.5 GWh | May 2022 | Dec 2025 | Solar |
| Jordan Creek Wind Farm, LLC | Jordan Creek Wind Farm, LLC | Judyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 2020 | May 2026 | Wind |
| Julia Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Junction Hilltop Wind Farm | Junction Hilltop Management LLC | Dana, IA | Midcontinent Independent System Operator, Inc. (MISO) | 23.6 GWh | Feb 2012 | Dec 2025 | Wind |
| J H Campbell | Consumers Energy Co - (MI) | West Olive, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 TWh | Sep 1962 | May 2026 | Subbituminous Coal : 99.6% |
| Janesville | City of Janesville - (MN) | Janesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 35.0 MWh | Apr 1955 | Dec 2025 | Distillate Fuel Oil : 97.5% Natural Gas : 2.5% |
| Jefferson Solar Park | Concord New Energy | Jefferson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 577.0 MWh | Nov 2013 | Dec 2025 | Solar |
| Jeffers Wind 20 LLC | Northern States Power Co - Minnesota | Jeffers, MN | Midcontinent Independent System Operator, Inc. (MISO) | 196.5 GWh | Sep 2008 | Dec 2025 | Wind |
| Jean Duluth Solar | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2022 | Dec 2025 | Solar |
| JCO Oxides Olefins Plant | Indorama Ventures | Port Neeches, TX | Midcontinent Independent System Operator, Inc. (MISO) | 569.5 GWh | Aug 1992 | Dec 2025 | Natural Gas |
| Jackson Co. Solar RES | Hoosier Energy R E C, Inc | Columbus, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Aug 2017 | Dec 2025 | Solar |
| Jamestown | Otter Tail Power Co | Jamestown, ND | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Apr 1976 | Dec 2025 | Distillate Fuel Oil |
| Jackson Generating Station | Consumers Energy Co - (MI) | Jackson, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Jun 2002 | May 2026 | Natural Gas |
| Jasper County Solar Project | Biscayne Falls SPV, LLC | Heber, IN | Midcontinent Independent System Operator, Inc. (MISO) | 25.6 GWh | Nov 2025 | May 2026 | Solar |
| Jersey Valley Geothermal Power Plant | Ormat Nevada Inc | Imlay, NV | Nevada Power Company (NEVP) | 58.1 GWh | Nov 2010 | Dec 2025 | Geothermal |
| Joseph J Seymour Power Project | New York Power Authority | Brooklyn, NY | New York Independent System Operator (NYIS) | 99.0 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Johnstown Solar 1, LLC | AES Distributed Energy | Gloversville, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Johnstown | Onyx Asset Services Group | Johnstown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Mar 2018 | Dec 2025 | Solar |
| Johnsonville Dam | Erie Boulevard Hydropower LP | Johnsonville, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Dec 1908 | Dec 2025 | Water |
| JB-Tobin 2 | AES Clean Energy | La Grange, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Judd Road Solar | Novis Renewables, LLC | Oriskany, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Feb 2022 | Dec 2025 | Solar |
| Johnson City Solar | Above Grid Binghamton Solar LLC | Johnson City, NY | New York Independent System Operator (NYIS) | 196.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Jarvis (Hinckley) | New York Power Authority | Hinckley, NY | New York Independent System Operator (NYIS) | 19.7 GWh | Jun 1991 | Dec 2025 | Water |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |